EP 0139899 A3 19860514 - BRIDGE CONSTRUCTION, ITS CONSTRUCTION PROCESS AND ITS ANCHORING
Title (en)
BRIDGE CONSTRUCTION, ITS CONSTRUCTION PROCESS AND ITS ANCHORING
Publication
Application
Priority
- GR 830172741 A 19831019
- GR 840173554 A 19840119
Abstract (en)
[origin: EP0139899A2] The bridge for vehicular traffic, links two points on dry land across a water expanse. It is anchored by weights located at suitable intervals on the sea bed, preferably made of reinforced concrete. Anchorage of the weights can be effected with steel rods or cables, of appropriate dia. and chains. The bridge can be made of wood.
IPC 1-7
IPC 8 full level
E01D 15/14 (2006.01)
CPC (source: EP)
E01D 15/145 (2013.01)
Citation (search report)
- [X] US 2085156 A 19370629 - HILL STIRLING B
- [X] AU 466657 B2 19751106
- [Y] FR 2447422 A1 19800822 - UHALDE BERNIER SA
- [A] BE 332357 A
- [A] DD 82358 C
Designated contracting state (EPC)
BE DE FR GB IT NL SE
DOCDB simple family (publication)
DOCDB simple family (application)
EP 84109050 A 19840731