EP 0141465 B1 19900117 - A METHOD OF BUILDING A FOUNDATION, AND SHUTTERING UNIT FOR THE APPLICATION OF SAID METHOD
Title (en)
A METHOD OF BUILDING A FOUNDATION, AND SHUTTERING UNIT FOR THE APPLICATION OF SAID METHOD
Publication
Application
Priority
NL 8303813 A 19831104
Abstract (en)
[origin: EP0141465A2] A method of building a foundation, comprising - making an excavation for the foundation, - building the foundation shuttering and arranging a reinforcement therein, - pouring concrete and subsequently allowing the same to harden, and - filling up the excavation, wherein the foundation shuttering is a prefabricated permanent-shuttering unit provided with reinforcement, and that the excavation is filled up after said shuttering unit has been placed therein and before the concrete is poured.
IPC 1-7
IPC 8 full level
E02D 27/02 (2006.01); E02D 27/12 (2006.01)
CPC (source: EP)
E02D 27/02 (2013.01); E02D 27/12 (2013.01)
Designated contracting state (EPC)
BE CH DE FR GB LI NL SE
DOCDB simple family (publication)
EP 0141465 A2 19850515; EP 0141465 A3 19860611; EP 0141465 B1 19900117; DE 3481071 D1 19900222; DK 159559 B 19901029; DK 159559 C 19910408; DK 523184 A 19850505; DK 523184 D0 19841102; FI 844237 A0 19841029; FI 844237 L 19850505; NO 165410 B 19901029; NO 165410 C 19910206; NO 844241 L 19850506
DOCDB simple family (application)
EP 84201554 A 19841030; DE 3481071 T 19841030; DK 523184 A 19841102; FI 844237 A 19841029; NO 844241 A 19841024