EP 0165712 B1 19901128 - BRIDGE CONSTRUCTION
Title (en)
BRIDGE CONSTRUCTION
Publication
Application
Priority
GB 8415135 A 19840614
Abstract (en)
[origin: EP0396196A1] A method of constructing a modular bridge across a span, comprises deploying a frame over the back of a launching vehicle (135) on the home bank of the span, placing a first bridge launching rail (133) module on a support for the launching rail on the frame, booming out the launching rail as it is formed and placing subsequent launching rail modules on the launching rail support and coupling them to the launching rail being formed, landing the far end of the launching rail on the far bank of the span, placing a first bridge module (75) on the launching rail and on bridge module support means on the vehicle, launching the bridge along the launching rail as the bridge is formed and placing subsequent bridge modules (31) on the launching rail and on the bridge module support means and coupling them to the bridge being formed.
IPC 1-7
IPC 8 full level
E01D 15/127 (2006.01)
CPC (source: EP)
E01D 15/127 (2013.01)
Designated contracting state (EPC)
DE FR GB
DOCDB simple family (publication)
EP 0396196 A1 19901107; DE 3580707 D1 19910110; EP 0165712 A2 19851227; EP 0165712 A3 19870121; EP 0165712 B1 19901128
DOCDB simple family (application)
EP 90201085 A 19850520; DE 3580707 T 19850520; EP 85303531 A 19850520