EP 0257185 B1 19900523 - BRIDGE FOR A COMMUNICATION PASSAGE BETWEEN COACHES
Title (en)
BRIDGE FOR A COMMUNICATION PASSAGE BETWEEN COACHES
Publication
Application
Priority
DE 3628627 A 19860822
Abstract (en)
[origin: US4802417A] A gangway is provided between two railway cars or units of railway cars that are pivoted to one another, and that forms a continuous, stepless passage for all travel motions. The entire gangway is designed as a unit that is held in the central position to each of the ends of the cars facing one another with the ability to shift lengthwise, by a centering device, and is supported and guided on bridge bearings, and is mounted to be able to pivot around its vertical axis and also to be able to tip out of the horizontal plane. The bridge area of the gangway consists of a number of rigid rails placed parallel to one another at prescribed distances and able to move lengthwise, which are enclosed and guided at both ends in supporting profiles that are mounted and guided on the bridge bearings associated with them.
IPC 1-7
IPC 8 full level
B61D 17/20 (2006.01)
CPC (source: EP US)
B61D 17/20 (2013.01 - EP US)
Designated contracting state (EPC)
AT BE CH DE FR GB IT LI NL SE
DOCDB simple family (publication)
EP 0257185 A1 19880302; EP 0257185 B1 19900523; AT E52973 T1 19900615; AU 591857 B2 19891214; AU 7731787 A 19880225; CA 1297343 C 19920317; DE 3628627 A1 19880225; DE 3628627 C2 19911024; DE 3762828 D1 19900628; DK 165872 B 19930201; DK 165872 C 19930628; DK 437487 A 19880223; DK 437487 D0 19870821; FI 873579 A0 19870819; FI 873579 A 19880223; FI 89147 B 19930514; FI 89147 C 19930825; JP S6353166 A 19880307; NO 167557 B 19910812; NO 167557 C 19911120; NO 873544 D0 19870821; NO 873544 L 19880223; US 4802417 A 19890207
DOCDB simple family (application)
EP 87105049 A 19870404; AT 87105049 T 19870404; AU 7731787 A 19870821; CA 544911 A 19870819; DE 3628627 A 19860822; DE 3762828 T 19870404; DK 437487 A 19870821; FI 873579 A 19870819; JP 20360287 A 19870818; NO 873544 A 19870821; US 7301687 A 19870714