EP 0338462 B1 19930630 - CONNECTION BETWEEN A SCAFFOLDING PLATFORM BORDER AND A SCAFFOLDING POST
Title (en)
CONNECTION BETWEEN A SCAFFOLDING PLATFORM BORDER AND A SCAFFOLDING POST
Publication
Application
Priority
DE 3813513 A 19880422
Abstract (en)
[origin: EP0338462A2] The edge-board construction exhibits tabs (25.11; 25.12) which project beyond the ends (21.1, 21.2) of the edge boards (20) and are fastened on the same side of the vertical centre of the edge board (20.1, 20.2). By the alternate insertion of the edge boards, the holding parts engage on one and the same pole (11), one lying below and the other, from the other edge board (20.2), lying above. Corresponding hooks, which engage around the outside of the pole, secure the edge boards (20.1; 20.2) against axial displacement and lateral tilting. <IMAGE>
IPC 1-7
IPC 8 full level
E04G 7/28 (2006.01)
CPC (source: EP)
E04G 7/28 (2013.01); E04G 2007/285 (2013.01)
Designated contracting state (EPC)
AT BE CH DE ES FR GB GR IT LI LU NL SE
DOCDB simple family (publication)
EP 0338462 A2 19891025; EP 0338462 A3 19900822; EP 0338462 B1 19930630; AT E91165 T1 19930715; DE 3813513 A1 19891102; DE 58904826 D1 19930805; PT 90336 A 19891110; PT 90336 B 19940331
DOCDB simple family (application)
EP 89106773 A 19890415; AT 89106773 T 19890415; DE 3813513 A 19880422; DE 58904826 T 19890415; PT 9033689 A 19890421