EP 0417111 A1 19910320 - A PROCEDURE FOR THE FORMING OF CONSOLIDATION AND FOUNDATION PILES WITH EMBEDDED REINFORCEMENTS.
Title (en)
A PROCEDURE FOR THE FORMING OF CONSOLIDATION AND FOUNDATION PILES WITH EMBEDDED REINFORCEMENTS.
Title (de)
VERFAHREN ZUR HERSTELLUNG VON VERFESTIGUNGS- UND GRÜNDUNGSPFÄHLEN MIT EINGEBETTETER BEWEHRUNG.
Title (fr)
PROCEDE DE FORMATION DE PILIERS DE CONSOLIDATION ET DE FONDATION AVEC ARMATURES INCORPOREES.
Publication
Application
Priority
IT 8900020 W 19890322
Abstract (en)
[origin: WO9011412A1] The art field is that of casting consolidation and foundation piles in-situ using ultra-high pressure liquid concrete injection casting methods; in the procedure disclosed, a metal reinforcement (7) is positioned prior to effecting the cast.
Abstract (fr)
Le domaine d'application de la présente invention est celui du coulage de piliers de consolidation et de fondation in situ, obtenus au moyen de procédés de coulage par injection de béton liquide sous ultra-haute pression. Dans le procédé décrit, on installe une armature métallique (7) avant d'effectuer le coulage.
IPC 1-7
IPC 8 full level
E02D 5/38 (2006.01)
CPC (source: EP)
E02D 5/385 (2013.01)
Citation (search report)
See references of WO 9011412A1
Designated contracting state (EPC)
AT BE DE FR GB NL SE
DOCDB simple family (publication)
DOCDB simple family (application)
IT 8900020 W 19890322; EP 89904201 A 19890322