EP 0687777 A1 19951220 - Method for arranging concrete piles in the ground
Title (en)
Method for arranging concrete piles in the ground
Title (de)
Verfahren zum Herstellen eines Ortbetonpfahles im Boden
Title (fr)
Procédé pour la mise en place d'un pieu en béton, monte dans le sol
Publication
Application
Priority
NL 9400987 A 19940616
Abstract (en)
According to the invention a hollow pipe provided on the end with a drill head is carried in rotatably driven and drilling manner into the ground. After the bearing layer has been reached, further ramming takes place for a time with a ram block in order to achieve a sufficient settling. The pipe is then filled with concrete mortar and reinforcement and pulled out of the ground while being vibrated. This method is particularly intended for use in built-up areas. <IMAGE>
IPC 1-7
IPC 8 full level
E02D 5/38 (2006.01); E02D 5/44 (2006.01); E02D 7/26 (2006.01)
CPC (source: EP)
E02D 5/385 (2013.01); E02D 5/44 (2013.01); E02D 7/26 (2013.01)
Citation (search report)
- [A] BE 754765 A 19710118 - FUNDEX PVBA
- [A] GB 886999 A 19620110 - GASPAR JOZEF COELUS
- [A] EP 0598457 A1 19940525 - BETON SON BV [NL]
- [A] EP 0003063 A2 19790725 - BALLAST NEDAM GROEP NV [NL]
- [A] EP 0185402 A1 19860625 - ROMBALDI ALBERT
- [A] DE 594038 C 19340309 - NAGEL FRIEDRICH
- [A] DE 3625577 A1 19870326 - WOLF HEINRICH RUDOLF
- [A] DE 3913313 A1 19901025 - WEISS KARL HOCH TIEF [DE]
Citation (third parties)
Third party :
De Wit funderingstechnieken
Designated contracting state (EPC)
AT BE CH DE DK ES FR GB GR IE IT LI LU MC NL PT SE
DOCDB simple family (publication)
EP 0687777 A1 19951220; EP 0687777 B1 20000920; AT E196519 T1 20001015; DE 69518877 D1 20001026; DE 69518877 T2 20010329; NL 9400987 A 19960201
DOCDB simple family (application)
EP 95201609 A 19950615; AT 95201609 T 19950615; DE 69518877 T 19950615; NL 9400987 A 19940616