EP 0842706 A2 19980520 - Coating installation and method for controlling the flow of coating material in this installation
Title (en)
Coating installation and method for controlling the flow of coating material in this installation
Title (de)
Beschichtungsanlage und Verfahren zum Steuern des Materialflusses in der Anlage
Title (fr)
Installation de revêtement et procédé de commande de l'écoulement du matériau de revêtement dans cette installation
Publication
Application
Priority
DE 19647168 A 19961114
Abstract (en)
The painting plant has a ring line (20) closed by an automatically controlled locking valve (16,36,37) in the pauses between coatings downstream of the inflow lines (32,32',34,34') leading to the painting devices (25,26,28,29). In this condition, the painting material from the inflow lines goes through a separate return line (35,35') behind the closing point back into the ring line. There may be a second closing point (37) downstream of the first one.
Abstract (de)
Zum automatischen Steuern des Materialflusses in einer Beschichtungsanlage wird deren Ringleitung (20) in Beschichtungspausen stromabwärts von zu den Beschichtungsvorrichtungen (25,26,28,29) führenden Hinlaufleitungen (32,32',34,34') gesperrt und das Beschichtungsmaterial aus den Hinlaufleitungen (32,32',34,34') durch eine separate Rücklaufleitung (35,35') hinter der Sperrstelle wieder in die Ringleitung (20) zurückgeleitet. <IMAGE>
IPC 1-7
IPC 8 full level
CPC (source: EP)
B05B 9/035 (2013.01)
Designated contracting state (EPC)
BE DE ES FR GB IT SE
DOCDB simple family (publication)
EP 0842706 A2 19980520; EP 0842706 A3 19981202; EP 0842706 B1 20020515; DE 19647168 A1 19980528; DE 59707276 D1 20020620; ES 2175245 T3 20021116
DOCDB simple family (application)
EP 97119659 A 19971110; DE 19647168 A 19961114; DE 59707276 T 19971110; ES 97119659 T 19971110