EP 0902128 A3 19990428 -
Publication
Application
Priority
- NL 1006998 A 19970911
- NL 1008390 A 19980223
Abstract (en)
[origin: EP0902128A2] The invention is concerned with a method for installing a foundation for a traffic course, wherein a ribbon shaped pattern of mutually spaced foundation piles is made by pressing piles into the soil until a desired penetration depth is met, wherein the pitch of the piles in said pile pattern is preferably relatively small. <IMAGE>
IPC 1-7
IPC 8 full level
E02D 5/00 (2006.01); E02D 7/18 (2006.01); E02D 7/20 (2006.01); E02D 7/22 (2006.01); E02D 13/04 (2006.01); E02D 27/12 (2006.01)
CPC (source: EP)
E02D 5/00 (2013.01); E02D 7/18 (2013.01); E02D 7/20 (2013.01); E02D 7/22 (2013.01); E02D 13/04 (2013.01); E02D 27/12 (2013.01)
Citation (search report)
- [XY] US 5255996 A 19931026 - KIAT ONG S [MY], et al
- [YA] US 4907915 A 19900313 - NICHOLSON ROBERT D [US], et al
- [YA] WO 9519576 A1 19950720 - BICC PLC [GB], et al
- [A] EP 0758699 A1 19970219 - HELMUT HEMMERLEIN GMBH & CO BA [DE]
- [YA] PATENT ABSTRACTS OF JAPAN vol. 004, no. 096 (M - 020) 11 July 1980 (1980-07-11)
Designated contracting state (EPC)
AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE
DOCDB simple family (publication)
DOCDB simple family (application)
EP 98203019 A 19980911