EP 0915233 B1 20030319 - Hybrid power plant
Title (en)
Hybrid power plant
Title (de)
Hybridkraftwerk
Title (fr)
Centrale hybride d'énergie
Publication
Application
Priority
EP 97810827 A 19971105
Abstract (en)
[origin: EP0915233A1] The power generator has a first generator (28) driven by a steam turbine (24) which can be driven by a fuel-powered steam generator (11) and/or a waste heat generator (44) and a second generator (55) driven by a gas turbine (50) providing the waste heat. Preheated steam turbine condensate is fed to a hot water tank (35) which supplies water to the steam generators. Only the hot exhaust gases from the gas turbine are used to preheat the condensate and the water.
IPC 1-7
IPC 8 full level
F01K 23/10 (2006.01)
CPC (source: EP)
F01K 23/10 (2013.01)
Designated contracting state (EPC)
DE
DOCDB simple family (publication)
EP 0915233 A1 19990512; EP 0915233 B1 20030319; DE 59709579 D1 20030424; IL 126800 A0 19990817; IL 126800 A 20020310
DOCDB simple family (application)
EP 97810827 A 19971105; DE 59709579 T 19971105; IL 12680098 A 19981029