EP 0985587 B1 20040609 - Method for controlling level crossings
Title (en)
Method for controlling level crossings
Title (de)
Verfahren zum Einschalten von Bahnübergängen
Title (fr)
Procédé pour commander des passages à niveau
Publication
Application
Priority
DE 19843232 A 19980910
Abstract (en)
[origin: EP0985587A1] The method involves contacting by the train driver the railway manager at the central station for radio-based operations before starting off to organise the safety of track crossings. The manager at the centre for radio-based railway operations allows time -optimal switching of all track crossing points which are to be passed through by the train. Preferably, the necessary minimum approaching time to the first crossing point for the train and a list for the crossing points which are passed on the route are automatically determined, after the manager has entered the current location of the train.
IPC 1-7
IPC 8 full level
B61L 29/00 (2006.01)
CPC (source: EP)
B61L 29/00 (2013.01); B61L 2011/086 (2013.01)
Designated contracting state (EPC)
AT BE CH DE DK ES FI FR GB GR IE IT LI NL PT SE
DOCDB simple family (publication)
EP 0985587 A1 20000315; EP 0985587 B1 20040609; AT E268711 T1 20040615; DE 19843232 A1 20000316; DE 59909677 D1 20040715
DOCDB simple family (application)
EP 99250274 A 19990813; AT 99250274 T 19990813; DE 19843232 A 19980910; DE 59909677 T 19990813