EP 1103657 A3 20020619 - Method for the construction of a ballastless railway track and apparatus for performing the method
Title (en)
Method for the construction of a ballastless railway track and apparatus for performing the method
Title (de)
Verfahren zum Herstellen einer festen Fahrbahn und Vorrichtung zur Verwendung hierbei
Title (fr)
Méthode de construction d'une voie ferrée sans ballast et dispositif de mise en oeuvre
Publication
Application
Priority
DE 19956474 A 19991124
Abstract (en)
[origin: EP1103657A2] The method uses lifting and aligning machines, to install a track grid above the lower track bed (4) before the upper bed is cast. The lifting and aligning machines are dismantled into separate components (7,8,17) for transport to the construction site, assembled on site, and dismantled for removal. The machines are used to fix the track grid (2) during casting, and are dismantled only the upper bed has set. They are also used to hold shuttering for the upper track bed.
IPC 1-7
IPC 8 full level
E01B 1/00 (2006.01); E01B 29/02 (2006.01)
CPC (source: EP)
E01B 1/004 (2013.01); E01B 29/02 (2013.01)
Citation (search report)
- [XA] DE 3539225 A1 19870514 - MAX KNAPE GMBH & CO FA [DE]
- [XA] US 5285964 A 19940215 - VANOTTI GERARD [FR]
- [XA] DE 3042725 A1 19820616 - ZUEBLIN AG [DE]
- [A] EP 0379148 A2 19900725 - HEILIT & WOERNER BAU AG [DE]
- [A] DE 19800218 A1 19990715 - BUTZBACHER WEICHENBAU GMBH [DE]
- [A] EP 0697485 B
Designated contracting state (EPC)
AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR
DOCDB simple family (publication)
EP 1103657 A2 20010530; EP 1103657 A3 20020619; DE 19956474 A1 20010531
DOCDB simple family (application)
EP 00125680 A 20001123; DE 19956474 A 19991124