EP 1405812 A4 20050622 - METHOD FOR INSTALLING HOIST
Title (en)
METHOD FOR INSTALLING HOIST
Title (de)
VERFAHREN ZUR INSTALLATION EINER FÖRDERVORRICHTUNG
Title (fr)
METHODE DE MONTAGE D'UN TREUIL
Publication
Application
Priority
JP 0102667 W 20010329
Abstract (en)
[origin: EP1405812A1] A method for installing a hoist comprising a step of erecting guide rails (5a, 5b) in an elevator shaft (1), a step of fixing guide members (74a, 74b, 75a, 75b) holding a fixing frame (73) slidably on the guide rails to the fixing frame, a step of lifting a hoist (6) while sliding the fixing frame in the longitudinal direction of the guide rails after the fixing step, a step of securing a beam (72) and bases (71a, 71b) for supporting the vertical load on the hoist and the fixing frame to the guide rails, and a step of installing the fixing frame and the hoist on the beam.
IPC 1-7
IPC 8 full level
B66B 7/00 (2006.01); B66B 11/00 (2006.01); B66B 19/00 (2006.01)
CPC (source: EP)
B66B 11/0045 (2013.01); B66B 19/005 (2013.01)
Citation (search report)
- No further relevant documents disclosed
- See references of WO 02079067A1
Designated contracting state (EPC)
AT BE CH DE FR LI NL
DOCDB simple family (publication)
EP 1405812 A1 20040407; EP 1405812 A4 20050622; EP 1405812 B1 20080220; CN 1191984 C 20050309; CN 1430572 A 20030716; DE 60132925 D1 20080403; DE 60132925 T2 20090305; JP 4828084 B2 20111130; JP WO2002079067 A1 20040722; WO 02079067 A1 20021010
DOCDB simple family (application)
EP 01917630 A 20010329; CN 01810122 A 20010329; DE 60132925 T 20010329; JP 0102667 W 20010329; JP 2002545048 A 20010329