EP 1457603 B1 20080723 - Sloping earth structure and fabrication method thereof
Title (en)
Sloping earth structure and fabrication method thereof
Title (de)
Verfahren zur Herstellung einer Erdböschung und danach hergestellte Erdböschung
Title (fr)
Talus et méthode de fabrication correspondante
Publication
Application
Priority
- DE 10311597 A 20030314
- DE 10328325 A 20030624
Abstract (en)
[origin: EP1457603A2] The method for constructing an earth embankment involves introduction of at least a few layers of bar-shaped load distributing elements during or after construction of a consolidated central region. Hooks are used to join the load distributing elements to the distance maintenance members. An independent claim is also included for a resultant earth embankment.
IPC 8 full level
E02D 29/02 (2006.01)
CPC (source: EP)
E02D 29/0241 (2013.01)
Designated contracting state (EPC)
DE ES
DOCDB simple family (publication)
EP 1457603 A2 20040915; EP 1457603 A3 20051130; EP 1457603 A9 20041110; EP 1457603 B1 20080723; DE 502004007643 D1 20080904; ES 2311134 T3 20090201
DOCDB simple family (application)
EP 04101037 A 20040312; DE 502004007643 T 20040312; ES 04101037 T 20040312