EP 1486611 A3 20050112 - Method for making a balastless track and balastless track for a railway
Title (en)
Method for making a balastless track and balastless track for a railway
Title (de)
Verfahren zur Herstellung einer festen Fahrbahn und feste Fahrbahn für Schienenfahrzeuge
Title (fr)
Procédé de construction d'une voie permanente et une voie permanente
Publication
Application
Priority
DE 10319298 A 20030429
Abstract (en)
[origin: EP1486611A2] A track bed is constructed esp. with an antifreeze layer (1) and/or unbound and/or hydraulically bound sub base (2). The applied sub base or concrete base (3) are formed so that, together with the layers (1,2) below, they can accommodate the required loads. A single/double-layer compensation base (4), esp. of asphalt, is applied to the sub base or concrete base. The asphalt has no supporting function and only serves to level out any depressions in the sub base. It is applied to a thickness of less than 20cm, esp. less than 15cm, and pref. approx. 5-7cm. The concrete base has reinforcements, and conventional sleepers (5) or pre-fabricated concrete plates are positioned on the compensation base.
IPC 1-7
IPC 8 full level
E01B 1/00 (2006.01); E01B 29/00 (2006.01)
CPC (source: EP)
E01B 1/002 (2013.01); E01B 29/005 (2013.01)
Citation (search report)
- [X] WO 0061866 A1 20001019 - GSG KNAPE GLEISSANIERUNG GMBH [DE], et al
- [X] DE 3429413 A1 19860220 - KUNZ ALFRED & CO [DE]
- [PX] EP 1380687 A1 20040114 - PFLEIDERER INFRASTRUKTURT GMBH [DE]
- [A] DE 4333936 A1 19950413 - SEIB HANS [DE]
Designated contracting state (EPC)
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PL PT RO SE SI SK TR
DOCDB simple family (publication)
EP 1486611 A2 20041215; EP 1486611 A3 20050112; EP 1486611 B1 20060913; AT E339551 T1 20061015; DE 10319298 A1 20041118; DE 502004001445 D1 20061026
DOCDB simple family (application)
EP 04010111 A 20040428; AT 04010111 T 20040428; DE 10319298 A 20030429; DE 502004001445 T 20040428