EP 1553230 B1 20141210 - Method for rehabilitating retaining walls
Title (en)
Method for rehabilitating retaining walls
Title (de)
Verfahren zum Abfangen von Stützmauern
Title (fr)
Méthode pour remettre en état des murs de soutènement
Publication
Application
Priority
DE 102004001559 A 20040110
Abstract (en)
[origin: EP1553230A2] Process for supporting retaining walls from behind with earth comprises subsequent attachment of load-distribution bodies. Cavities (4) produced at lateral intervals at the rear side (1) of the wall are filled with the material forming the load-distribution bodies. Each cavity is formed by sinking a shaft (6) into the earth surface (5) directly at the rear side of the wall by removing earth and the material forming the load-distribution bodies is introduced into the shaft.
IPC 8 full level
E02D 37/00 (2006.01); E02D 29/02 (2006.01)
CPC (source: EP)
E02D 29/0275 (2013.01); E02D 37/00 (2013.01)
Designated contracting state (EPC)
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU MC NL PL PT RO SE SI SK TR
DOCDB simple family (publication)
EP 1553230 A2 20050713; EP 1553230 A3 20060208; EP 1553230 B1 20141210; DE 102004001559 A1 20050804; DE 102004001559 B4 20140703
DOCDB simple family (application)
EP 05000226 A 20050107; DE 102004001559 A 20040110