EP 1717186 B1 20100324 - Method and apparatus for installing guide rails in an elevator hoistway
Title (en)
Method and apparatus for installing guide rails in an elevator hoistway
Title (de)
Verfahren und Vorrichtung zur Installation von Führungsschienen in einem Aufzugsschacht
Title (fr)
Procédé et dispositif pour installer les guides d' ascenseur dans la gaine
Publication
Application
Priority
- EP 05103475 A 20050427
- EP 06112729 A 20060418
Abstract (en)
[origin: EP1717186A1] Several guide rails (10) are fastened to a common support such as cable (13) by the coupling element (14). The guide rails are hanging one after the other at the support in vertical position during pulling up of the support in the elevator shaft.
IPC 8 full level
B66B 19/00 (2006.01)
CPC (source: EP)
B66B 19/002 (2013.01)
Designated contracting state (EPC)
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR
DOCDB simple family (publication)
DOCDB simple family (application)
EP 06112729 A 20060418