EP 2068081 A4 20110511 - OPERATING METHOD AND OPERATION CONTROL APPARATUS FOR GASIFICATION MELTING FURNACE
Title (en)
OPERATING METHOD AND OPERATION CONTROL APPARATUS FOR GASIFICATION MELTING FURNACE
Title (de)
BETRIEBSVERFAHREN UND BETRIEBSSTEUERVORRICHTUNG FÜR VERGASUNGSSCHMELZOFEN
Title (fr)
PROCÉDÉ DE FONCTIONNEMENT ET APPAREIL DE COMMANDE DE FONCTIONNEMENT POUR UN FOUR à FUSION DE GAZÉIFICATION
Publication
Application
Priority
- JP 2007067003 W 20070831
- JP 2006260083 A 20060926
- JP 2007050892 A 20070301
- JP 2007141664 A 20070529
Abstract (en)
[origin: EP2068081A1] [PROBLEMS] 1. To realize high-efficiency operation of a gasification-melting furnace by rest of an auxiliary burner while avoiding abnormal combustion of unburned gas in reignition of the auxiliary burner. 2. To facilitate a proper adjustment of the basicity without a special analyzer for a slag composition in operation of a gasification-melting furnace. [MEANS TO SOLVE PROBLEMS] 1. The burner in the gasification-melting furnace is stopped when operation state thereof satisfies a specific condition. Thereafter, at a point in time when the temperature in the vicinity of the burner is lowered to a predetermined temperature, the supply of a waste material from a dust feeder to the gasification furnace is stopped. After this increases the concentration of oxygen in gas in outlet of the gasification furnace, the burner is reignited. 2. The basicity of slag discharged form a slag-discharge port in the melting furnace is adjusted by supply of a basicity adjuster from a basicity adjuster supplying apparatus. To determine an amount of the supply, utilized is a correlation between a parameter corresponding to the calorific value of the waste material per unit weight and the slag basicity.
IPC 8 full level
F23G 5/50 (2006.01); F23G 5/00 (2006.01); F23G 5/027 (2006.01)
CPC (source: EP KR)
F23G 5/00 (2013.01 - KR); F23G 5/006 (2013.01 - EP); F23G 5/027 (2013.01 - KR); F23G 5/0276 (2013.01 - EP); F23G 5/50 (2013.01 - EP KR); F23G 2202/20 (2013.01 - EP); F23G 2203/30 (2013.01 - EP); F23G 2203/403 (2013.01 - EP); F23G 2204/103 (2013.01 - EP); F23G 2207/60 (2013.01 - EP); F23G 2900/55011 (2013.01 - EP); F23J 2700/001 (2013.01 - EP)
Citation (search report)
- [A] JP 2004353944 A 20041216 - HITACHI SHIPBUILDING ENG CO
- [A] US 4013023 A 19770322 - LOMBANA LUIS A, et al
- [A] US 2004025763 A1 20040212 - KANEKO MASAMOTO [JP]
- [A] US 2004137390 A1 20040715 - ARNOLD KENNY M [US], et al
- See references of WO 2008038492A1
Designated contracting state (EPC)
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR
DOCDB simple family (publication)
EP 2068081 A1 20090610; EP 2068081 A4 20110511; EP 2068081 B1 20140416; EP 2322855 A2 20110518; EP 2322855 A3 20110831; EP 2322855 B1 20160413; ES 2461769 T3 20140521; KR 101107787 B1 20120120; KR 20090057441 A 20090605; PL 2068081 T3 20140930; PL 2322855 T3 20160930; WO 2008038492 A1 20080403
DOCDB simple family (application)
EP 07806476 A 20070831; EP 11001719 A 20070831; ES 07806476 T 20070831; JP 2007067003 W 20070831; KR 20097007726 A 20070831; PL 07806476 T 20070831; PL 11001719 T 20070831