EP 2284059 A2 20110216 - Device for transporting material in railway construction
Title (en)
Device for transporting material in railway construction
Title (de)
Vorrichtung zur Materialförderung im Gleisbau bei Bahnstrecken
Title (fr)
Dispositif de transport de matériaux lors de la pose de voies ferrées
Publication
Application
Priority
DE 202009011149 U 20090814
Abstract (en)
A method for delivering ballast, or other free flow materials such as sand and gravel, has a line of railway trucks each fitted with a conveyor belt along the bottom of each truck to move the material to and from the working site. Each truck also has an adjustable transfer conveyor at each end to allow flow of material in either direction, e.g. to pick up old ballast and to deliver fresh and cleaned ballast. The trucks assemble into a ballast train of selected length. The end of the trucks comprise hinged plates which are raised for transport and lowered for ballast transfer.
Abstract (de)
Eine Vorrichtung zur Materialförderung im Gleisbau bei Bahnstrecken weist einen auf dem Gleis 9 verfahrbaren Wagen 1 zur Aufnahme des Materials auf. Damit auch bei Minustemperaturen eine Entladung des ansonsten gefrorenen Transportgutes möglich ist, ist der Wagen 1 beheizbar.
IPC 8 full level
B61D 15/00 (2006.01); B61D 7/32 (2006.01); B61D 27/00 (2006.01); E01B 27/00 (2006.01)
CPC (source: EP)
B61D 7/32 (2013.01); B61D 15/00 (2013.01); B61D 27/0036 (2013.01); E01B 27/00 (2013.01)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR
Designated extension state (EPC)
BA ME RS
DOCDB simple family (publication)
DE 202009011149 U1 20091112; EP 2284059 A2 20110216; EP 2284059 A3 20120718
DOCDB simple family (application)
DE 202009011149 U 20090814; EP 10008401 A 20100812