EP 2455563 B1 20160330 - Method for attachment of a headpiece to the front of a construction support
Title (en)
Method for attachment of a headpiece to the front of a construction support
Title (de)
Verfahren zum stirnseitigen Aufsetzen eines Kopfstückes auf eine Baustütze
Title (fr)
Procédé destiné au montage frontal d'un embout sur un étai
Publication
Application
Priority
DE 102010044193 A 20101119
Abstract (en)
[origin: EP2455563A2] The header (5) has header main structure that is located above a connecting device for supporting top resting load. The inner pipe portion is inserted into pipe portion (3) of building support (1) and extended along downward direction. An attachment portion (6) is provided to attach header main portion with inner pipe portion of support. The clamping portion (53) is provided for pre-tensioning the building support attached with header main portion by attachment unit. Independent claims are included for the following: (1) kit for header; and (2) method for connecting header.
IPC 8 full level
E04G 11/48 (2006.01); E04G 25/06 (2006.01)
CPC (source: EP)
E04G 11/483 (2013.01); E04G 25/06 (2013.01); E04G 25/061 (2013.01); E04G 25/065 (2013.01)
Citation (examination)
- DE 1247969 B 19670817 - FRIEDRICH ISCHEBECK
- DE 19719743 A1 19981112 - SHIH LUNG LI [TW]
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
EP 2455563 A2 20120523; EP 2455563 A3 20140108; EP 2455563 B1 20160330; DE 102010044193 A1 20120524; PL 2455563 T3 20160930
DOCDB simple family (application)
EP 11186494 A 20111025; DE 102010044193 A 20101119; PL 11186494 T 20111025