EP 2465655 B1 20150218 - Method for emptying a crane silo for holding and suspended transport of bulk construction material
Title (en)
Method for emptying a crane silo for holding and suspended transport of bulk construction material
Title (de)
Verfahren zur Entleerung eines zur Aufnahme und zum hängenden Transport von schüttfähigen Baustoffen ausgebildeten Kransilo
Title (fr)
Procédé de vidage d'un silo de grue développé pour la réception et le transport suspendu de matériaux de construction coulants
Publication
Application
Priority
EP 10405239 A 20101218
Abstract (en)
[origin: EP2465655A1] The method involves forming filling opening in the upper end and forming discharge opening (3) for removal of building material in lower end of crane silo (1). The discharge opening of container (2) is operatively connected to conveying hose (5), to face the conveyor region for closing and opening the adjustable metering device (8). The opening of metering device forms a conveying cross section of delivery hose with opening movement. The gas for pre-stressed closing movement of metering device in counterforce with closing pressure is compressed for the opening movement. An independent claim is included for crane silo.
IPC 8 full level
E04G 21/02 (2006.01); B65D 90/56 (2006.01); B65D 90/66 (2006.01)
CPC (source: EP)
E04G 21/025 (2013.01); B65D 90/56 (2013.01)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
DOCDB simple family (application)
EP 10405239 A 20101218