EP 2530493 A1 20121205 - Method for building a fracture network mesh from a Voronoi diagram
Title (en)
Method for building a fracture network mesh from a Voronoi diagram
Title (de)
Methode zur Erstellung eines Gitternetzes eines Frakturnetzes mit Hilfe eines Voronoi-Diagramms
Title (fr)
Méthode pour construire un maillage d'un réseau de fractures à partir de diagramme de voronoi
Publication
Application
Priority
FR 1101686 A 20110601
Abstract (en)
The method involves constructing a Voronoi diagram of a fracture network plane by positioning centers (C1, C2) of Voronoi cells on intersection segments. Values of transmissivity between the centers of the neighboring cells are calculated from a ratio between a surface of the neighboring cells and distance between the neighboring cells. The cells and the transmissivity values are used to construct an image of a fluid reservoir. The image of the reservoir and a flow simulator are used to optimize operation of the reservoir.
Abstract (fr)
Procédé pour optimiser l'exploitation d'un gisement de fluide utilisant un maillage d'un réseau de fractures construit à partir de diagramme de Voronoï A partir d'observations du gisement on construit un réseau discret de fractures dans lequel chaque fracture est représentée par un plan fini polygonal isotrope du point de vue de ses propriétés dynamiques, un plan comportant des segments d'intersection avec d'autres fractures du réseau. On construit un diagramme de Voronoï sur chaque plan de fracture en positionnant des centres de cellules de Voronoï sur les segments d'intersection, et on calcule les transmissivités entre des centres de cellules voisines à partir du rapport entre la surface des cellules voisines et la distance entre les cellules voisines. On peut alors utiliser les cellules et les transmissivités pour construire une image du gisement de fluide. Enfin, on utilise cette image et un simulateur d'écoulement pour optimiser l'exploitation du gisement de fluide.
IPC 8 full level
G01V 11/00 (2006.01); E21B 41/00 (2006.01)
CPC (source: EP US)
E21B 41/00 (2013.01 - EP US); G01V 11/00 (2013.01 - EP US); G06F 30/28 (2020.01 - EP US)
Citation (applicant)
- FR 2787219 A1 20000616 - INST FRANCAIS DU PETROLE [FR]
- FR 2757947 A1 19980703 - INST FRANCAIS DU PETROLE [FR]
- US 6023656 A 20000208 - CACAS MARIE-CHRISTINE [FR], et al
- FR 2757957 A1 19980703 - INST FRANCAIS DU PETROLE [FR]
- US 6064944 A 20000516 - SARDA SYLVAIN [FR], et al
- EP 2037080 A1 20090318 - INST FRANCAIS DU PETROLE [FR]
- P. KOEBE: "Math.-Phys. Kl.", 1936, AKAD. WISS, article "Kontaktprobleme der konformen Abbildung. Ber. S", pages: 88 - 141,164
- S. J. FORTUNE: "A swoopline algorithm for Varonoi diagrams", ALGORITHMICA, vol. 2, 1987, pages 153 - 174
- WARREN J.E. ET AL.: "The Behavior of Naturally Fractured Reservoirs", SPE JOURNAL, September 1963 (1963-09-01), pages 245 - 255
Citation (search report)
- [Y] WO 0079423 A1 20001228 - EXXONMOBIL UPSTREAM RES CO [US]
- [Y] WO 2008150325 A1 20081211 - EXXONMOBIL UPSTREAM RES CO [US], et al
- [Y] US 2009299714 A1 20091203 - KELKAR MOHAN [US], et al
- [XI] BRANETS L.V., S.S. GHAI,, S.L. LYONS, X.-H. WU: "Efficient and Accurate Reservoir Modeling Using Adaptive Gridding With Global Scale Up", SPE 118946, 2 February 2009 (2009-02-02) - 4 February 2009 (2009-02-04), Texas, USA, XP002667795
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated extension state (EPC)
BA ME
DOCDB simple family (publication)
EP 2530493 A1 20121205; EP 2530493 B1 20150318; FR 2976099 A1 20121207; FR 2976099 B1 20130517; US 2013138406 A1 20130530; US 9103194 B2 20150811
DOCDB simple family (application)
EP 12003419 A 20120503; FR 1101686 A 20110601; US 201213479353 A 20120524