EP 2729617 A1 20140514 - TRANSITION BETWEEN TWO TRACK SECTIONS
Title (en)
TRANSITION BETWEEN TWO TRACK SECTIONS
Title (de)
ÜBERGANG ZWISCHEN ZWEI GLEISABSCHNITTEN
Title (fr)
TRANSITION ENTRE DEUX SECTIONS DE VOIE
Publication
Application
Priority
- DE 102011051615 A 20110706
- IB 2012053118 W 20120620
Abstract (en)
[origin: WO2013005126A1] The invention creates a transition (10) between a track section (12) laid in a ballast bed (11) and a track section (13) constructed as a ballastless railway track (14). In order to take the different settling conditions of the two types of track into account and create a continuous transition in the course of the track between the two types of tracks, the invention proposes a compensation unit (19) mounted on the ballastless railway track (14) at an abutment point (15) between the two types of track and extending over a transition zone (20) into the ballast bed (11) under the track section (12) laid there, forming a type of support ramp for the track section lying above and ensuring a uniform decline in the sinkage level of the track in the ballast bed towards the ballastless railway track.
IPC 8 full level
CPC (source: EP)
E01B 1/001 (2013.01); E01B 1/002 (2013.01); E01B 2/00 (2013.01)
Citation (search report)
See references of WO 2013005126A1
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
DE 102011051615 A1 20130110; EP 2729617 A1 20140514; EP 2729617 B1 20170712; WO 2013005126 A1 20130110
DOCDB simple family (application)
DE 102011051615 A 20110706; EP 12735944 A 20120620; IB 2012053118 W 20120620