EP 2743404 B1 20150311 - Method for constructing an offshore structure
Title (en)
Method for constructing an offshore structure
Title (de)
Verfahren zur Errichtung eines Offshore-Bauwerks
Title (fr)
Procédé de réalisation d'un ouvrage offshore
Publication
Application
Priority
- DE 102012024565 A 20121217
- DE 102012025120 A 20121221
Abstract (en)
[origin: EP2743404A1] The method involves attaching a jacket comprising four supporting legs (2a-2d) which are anchored in the foundation piles, to a subsoil. The jacket is issued on the foundation piles under load transfer in the subsoil. The supporting legs are set with a curable casting compound in the foundation piles. The jacket is leveled before and/or balanced during the casting. The load transfer in the subsoil is carried out for relieving a fourth supporting leg before curing the grout. An independent claim is included for a jacket foundation of an offshore structure.
IPC 8 full level
E02D 27/42 (2006.01)
CPC (source: EP)
E02B 17/027 (2013.01); E02D 27/425 (2013.01); E02B 2017/006 (2013.01); E02B 2017/0073 (2013.01); E02B 2017/0091 (2013.01)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
EP 2743404 A1 20140618; EP 2743404 B1 20150311; DE 102012025120 A1 20140703
DOCDB simple family (application)
EP 13195589 A 20131204; DE 102012025120 A 20121221