EP 2848736 B1 20160727 - Railway track working train for removing and installing ballast and portable track sections
Title (en)
Railway track working train for removing and installing ballast and portable track sections
Title (de)
Gleisarbeitszug zum Ein- und Ausbau von Schotterbett und Gleisjochen
Title (fr)
Train de travaux de chemin de fer pour retirer et installer du ballast et des tronçons assemblés de voie ferrée
Publication
Application
Priority
CH 15262013 A 20130905
IPC 8 full level
E01B 29/02 (2006.01); E01B 27/08 (2006.01)
CPC (source: EP)
E01B 29/02 (2013.01); E01B 27/08 (2013.01)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
EP 2848736 A1 20150318; EP 2848736 B1 20160727; CH 708506 A1 20150313; CH 708506 B1 20171130; PL 2848736 T3 20170131
DOCDB simple family (application)
EP 14183068 A 20140901; CH 15262013 A 20130905; PL 14183068 T 20140901