EP 2923773 B1 20171025 - ASSEMBLY FOR REMOVING VARNISH FOG WHEN VARNISHING A COMPONENT SUCH AS THE FUSELAGE OF AN AIRCRAFT AND VARNISH REMOVAL METHOD
Title (en)
ASSEMBLY FOR REMOVING VARNISH FOG WHEN VARNISHING A COMPONENT SUCH AS THE FUSELAGE OF AN AIRCRAFT AND VARNISH REMOVAL METHOD
Title (de)
ANORDNUNG ZUM ABFÜHREN VON LACKNEBEL BEIM LACKIEREN EINES BAUTEILS, WIE EINEM FLUGZEUGRUMPF UND LACKNEBELABFÜHRVERFAHREN
Title (fr)
SYSTÈME D'ÉVACUATION DE BROUILLARD DE PEINTURE LORS DE LA MISE EN PEINTURE D'UN COMPOSANT ET FUSELAGE D'AVION ET PROCÉDÉ D'ÉVACUATION DE BROUILLARD DE PEINTURE
Publication
Application
Priority
DE 102014104010 A 20140324
IPC 8 full level
B05B 15/12 (2006.01); B05B 16/60 (2018.01); F26B 3/02 (2006.01); F26B 21/00 (2006.01)
CPC (source: EP US)
B05B 16/60 (2018.01 - EP US); B05B 13/005 (2013.01 - EP); F26B 21/004 (2013.01 - EP)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
EP 2923773 A1 20150930; EP 2923773 B1 20171025; DE 102014104010 A1 20150924
DOCDB simple family (application)
EP 15160568 A 20150324; DE 102014104010 A 20140324