EP 3081520 A1 20161019 - METHOD FOR INSTALLING A GUIDE RAIL AND A GUIDE RAIL
Title (en)
METHOD FOR INSTALLING A GUIDE RAIL AND A GUIDE RAIL
Title (de)
VERFAHREN ZUR INSTALLATION EINER FÜHRUNGSSCHIENE UND EINE FÜHRUNGSSCHIENE
Title (fr)
PROCÉDÉ D'INSTALLATION D'UN RAIL DE GUIDAGE ET LEDIT RAIL
Publication
Application
Priority
EP 15164050 A 20150417
Abstract (en)
The invention relates to a method for installing a guide rail (1) to an elevator shaft, in which the guide rail (1) is installed to a wall of the elevator shaft through wall brackets (4) by assembly in phases from the bottom of the elevator shaft upwards. The guide rail (1) comprises multiple primary guide rail members (2) and multiple secondary guide rail members (3) connected together for forming the guide rail (1). The invention also relates to a guide rail.
IPC 8 full level
B66B 19/00 (2006.01); B66B 7/02 (2006.01)
CPC (source: CN EP)
B66B 7/022 (2013.01 - EP); B66B 7/023 (2013.01 - CN); B66B 19/002 (2013.01 - EP)
Citation (search report)
- [XAI] JP H10203747 A 19980804 - OTIS ELEVATOR CO
- [A] JP 2003002555 A 20030108 - MITSUBISHI ELECTRIC CORP
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated extension state (EPC)
BA ME
DOCDB simple family (publication)
DOCDB simple family (application)
EP 15164050 A 20150417; CN 201610236620 A 20160415