EP 3351687 B1 20190403 - METHOD OF MAKING A PILE
Title (en)
METHOD OF MAKING A PILE
Title (de)
VERFAHREN ZUR HERSTELLUNG EINES PFAHLS
Title (fr)
PROCÉDÉ DE FAIRE UN PIEU
Publication
Application
Priority
EP 17152822 A 20170124
IPC 8 full level
E02D 5/44 (2006.01)
CPC (source: EP)
E02D 5/44 (2013.01)
Citation (opposition)
Opponent : Keller Holding GmbH
- DE 3324509 A1 19850117 - FRANKIPFAHL BAUGESELLSCHAFT MB [DE]
- WO 2014082741 A1 20140605 - FRANKI GRUNDBAU GMBH & CO KG [DE]
- WO 0196669 A1 20011220 - GEOTECHNICAL REINFORCEMENT COM [US]
- DE 102005008679 A1 20060907 - FRANKI GRUNDBAU GMBH & CO KG [DE]
- US 3423944 A 19690128 - GOODMAN WILLARD B
- US 9057169 B1 20150616 - PERKO HOWARD A [US]
- KATZENBACH ET AL: "Handbuch des Spezialtiefbaus: Geräte und Verfahren, 3. auflage", 2015, ISBN: 978-3-8462-0377, pages: 214 - 241, XP055660140
- STAHLMANN: "Pfahl-Symposium 2007", FACHSEMINAR 22./23. FEBRUAR 2007, February 2007 (2007-02-01), XP055660151
- BASU ET AL: "Drilled Displacement Piles - Current Practice and Design", DFI JOURNAL - THE JOURNAL OF THE DEEP FOUNDATIONS INSTITUTE, vol. 4, no. 1, 1 August 2010 (2010-08-01), pages 3 - 20, XP055660158
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
DOCDB simple family (application)
EP 17152822 A 20170124