EP 3467205 B1 20191204 - METHOD FOR CREATING A PILE IN THE GROUND AND GROUND PROCESSING DEVICE FOR SAME
Title (en)
METHOD FOR CREATING A PILE IN THE GROUND AND GROUND PROCESSING DEVICE FOR SAME
Title (de)
VERFAHREN ZUM ERSTELLEN EINES PFAHLS IM BODEN UND BODENBEARBEITUNGSGERÄT HIERFÜR
Title (fr)
PROCÉDÉ DE CONSTRUCTION D'UN POTEAU ENFONCÉ DANS LE SOL ET APPAREIL DE PRÉPARATION DU SOL CORRESPONDANT
Publication
Application
Priority
EP 17195115 A 20171006
IPC 8 full level
E02D 5/38 (2006.01); E02D 5/66 (2006.01); E02D 7/22 (2006.01)
CPC (source: EP)
E02D 5/385 (2013.01); E02D 5/665 (2013.01)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
EP 3467205 A1 20190410; EP 3467205 B1 20191204; HU E049572 T2 20201028; PL 3467205 T3 20200601
DOCDB simple family (application)
EP 17195115 A 20171006; HU E17195115 A 20171006; PL 17195115 T 20171006