EP 3533933 B1 20230517 - METHOD FOR POWER MANAGEMENT IN PILE FOUNDATION COMPRISING A HOLDER MACHINE AND AN IMPLEMENT MOUNTED ON SAME
Title (en)
METHOD FOR POWER MANAGEMENT IN PILE FOUNDATION COMPRISING A HOLDER MACHINE AND AN IMPLEMENT MOUNTED ON SAME
Title (de)
VERFAHREN ZUR LEISTUNGSVERWALTUNG BEI DER PFAHLGRÜNDUNG MIT EINER TRÄGERMASCHINE UND EINEM DARAN MONTIERTEN ANBAUGERÄT
Title (fr)
PROCÉDÉ DE TRAITEMENT DE GESTION DE PUISSANCE D'UNE FONDATION SUR PILOTIS DOTÉE D'UN ENGIN PORTEUR ET D'UN APPAREIL ISOLÉ MONTÉ SUR LEDIT ENGIN PORTEUR
Publication
Application
Priority
DE 102018104331 A 20180226
Abstract (en)
[origin: US2019264413A1] The present invention relates to a method of power management during pile foundation having a base machine for excavating a borehole and an attachment installed at the base machine for a simultaneous introduction of a casing into the ground, wherein the energy supply for the attachment is at least partially provided by the base machine and a control of the base machine dynamically regulates the energy flow from the base machine to the attachment.
IPC 8 full level
E02D 7/26 (2006.01); E02D 7/28 (2006.01); E21B 7/20 (2006.01)
CPC (source: EP US)
E02D 7/18 (2013.01 - US); E02D 7/26 (2013.01 - EP US); E02D 7/28 (2013.01 - EP US); E02D 13/00 (2013.01 - US); E21B 7/20 (2013.01 - EP US); E02D 2250/00 (2013.01 - US); E02D 2600/00 (2013.01 - US)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
EP 3533933 A1 20190904; EP 3533933 B1 20230517; DE 102018104331 A1 20190829; JP 2019148162 A 20190905; JP 7173892 B2 20221116; US 10704219 B2 20200707; US 2019264413 A1 20190829
DOCDB simple family (application)
EP 19159079 A 20190225; DE 102018104331 A 20180226; JP 2019028340 A 20190220; US 201916286268 A 20190226