EP 3825487 B1 20211103 - METHOD FOR CREATING A SHUTTERING OF THE TRANSITION FROM A FLOOR/CEILING PANEL TO AN EXTERNAL WALL
Title (en)
METHOD FOR CREATING A SHUTTERING OF THE TRANSITION FROM A FLOOR/CEILING PANEL TO AN EXTERNAL WALL
Title (de)
VERFAHREN ZUM ERSTELLEN EINER ABSCHALUNG DES ÜBERGANGS VON EINER BODEN-/DECKENPLATTE ZU EINER AUSSENWAND
Title (fr)
PROCÉDÉ DE CONSTRUCTION D'UN COFFRAGE POUR L'ESPACE ENTRE UNE DALLE/DALLE HAUTE ET UN MUR EXTÉRIEUR
Publication
Application
Priority
DE 102019131748 A 20191125
IPC 8 full level
E04B 1/68 (2006.01)
CPC (source: EP)
E04B 1/6806 (2013.01); E04B 1/161 (2013.01)
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
DOCDB simple family (publication)
EP 3825487 A1 20210526; EP 3825487 B1 20211103; DE 102019131748 A1 20210527
DOCDB simple family (application)
EP 20204688 A 20201029; DE 102019131748 A 20191125