EP 3871802 A4 20211110 - CASTING INSTALLATION AND CASTING METHOD
Title (en)
CASTING INSTALLATION AND CASTING METHOD
Title (de)
GIESSANLAGE UND GIESSVERFAHREN
Title (fr)
INSTALLATION DE COULAGE ET PROCÉDÉ DE COULAGE
Publication
Application
Priority
- KR 20180129153 A 20181026
- KR 2019013908 W 20191022
Abstract (en)
[origin: EP3871802A1] A casting installation according to an embodiment of the present invention comprises: a ladle provided with a first room and a second room, each of which can accommodate molten steel; a tundish having a first accommodation space and a second accommodation space provided therein, the first accommodation space being capable of accommodating first molten steel supplied from the first room, and the second accommodation space being capable of accommodating second molten steel supplied from the second room; and a mold which is disposed below the tundish, solidifies the first molten steel and the second molten steel supplied from the tundish, and casts a double-layered slab in which the components in a surface layer and an inner layer are different. Thus, according to the casting installation according to an embodiment of the present invention, an installation can be configured to include a plurality of strands to improve the production rate of double-layered slabs. Also, by providing the first molten steel and the second molten steel separated from each other in the ladle and supplying same to the tundish, a double-layered slab in which the components are uniform in the longitudinal direction of the slab can be cast.
IPC 8 full level
B22D 11/00 (2006.01); B22D 1/00 (2006.01); B22D 11/04 (2006.01); B22D 11/103 (2006.01); B22D 11/108 (2006.01); B22D 11/16 (2006.01); B22D 41/00 (2006.01); B22D 41/08 (2006.01)
CPC (source: EP KR)
B22D 1/00 (2013.01 - EP); B22D 1/002 (2013.01 - EP); B22D 11/007 (2013.01 - EP KR); B22D 11/0406 (2013.01 - EP KR); B22D 11/103 (2013.01 - EP KR); B22D 11/108 (2013.01 - EP); B22D 11/16 (2013.01 - KR); B22D 41/00 (2013.01 - EP); B22D 41/08 (2013.01 - EP)
Citation (search report)
- [XI] JP H01284459 A 19891115 - NISSHIN STEEL CO LTD
- [XI] JP H06320232 A 19941122 - NIPPON STEEL CORP
- [A] JP 2005103552 A 20050421 - DAIDO STEEL CO LTD
- [A] EP 3369495 A1 20180905 - NIPPON STEEL & SUMITOMO METAL CORP [JP]
- [A] EP 0265235 A2 19880427 - NIPPON STEEL CORP [JP]
- See references of WO 2020085772A1
Designated contracting state (EPC)
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated extension state (EPC)
BA ME
DOCDB simple family (publication)
EP 3871802 A1 20210901; EP 3871802 A4 20211110; CN 113165056 A 20210723; CN 113165056 B 20221223; JP 2022509011 A 20220120; JP 7148724 B2 20221005; KR 102227826 B1 20210315; KR 20200047111 A 20200507; WO 2020085772 A1 20200430
DOCDB simple family (application)
EP 19875171 A 20191022; CN 201980080618 A 20191022; JP 2021523063 A 20191022; KR 20180129153 A 20181026; KR 2019013908 W 20191022