(19)
(11)EP 3 269 092 B1

(12)EUROPEAN PATENT SPECIFICATION

(45)Mention of the grant of the patent:
29.07.2020 Bulletin 2020/31

(21)Application number: 15709926.8

(22)Date of filing:  12.03.2015
(51)International Patent Classification (IPC): 
H04L 12/28(2006.01)
H04L 12/911(2013.01)
H04L 12/703(2013.01)
(86)International application number:
PCT/EP2015/055226
(87)International publication number:
WO 2016/141995 (15.09.2016 Gazette  2016/37)

(54)

TECHNIQUE FOR ROUTING AND SWITCHING REDUNDANCY

TECHNIK FÜR LEITWEGLENKUNGS- UND SCHALTUNGSREDUNDANZ

PROCÉDÉ DE REDONDANCE DE ROUTAGE ET DE COMMUTATION


(84)Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

(43)Date of publication of application:
17.01.2018 Bulletin 2018/03

(73)Proprietor: Telefonaktiebolaget LM Ericsson (publ)
164 83 Stockholm (SE)

(72)Inventors:
  • POSCHER, Jens
    52062 Aachen (DE)
  • DETKE, Ralph
    52134 Herzogenrath (DE)
  • EICHINGER, Stefan
    50859 Koeln (DE)
  • SENTURK, Sevil
    52134 Herzogenrath (DE)

(74)Representative: Ericsson 
Patent Development Torshamnsgatan 21-23
164 80 Stockholm
164 80 Stockholm (SE)


(56)References cited: : 
EP-A1- 2 209 260
WO-A1-2014/068984
EP-A1- 2 536 068
US-A1- 2014 071 811
  
      
    Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).


    Description

    Technical Field



    [0001] The present disclosure generally relates to a technique for routing datagrams. More specifically, and without limitation, a device and a method are provided for routing datagrams between costumer equipments and a plurality of broadband network gateways.

    Background



    [0002] A customer equipment (CE), e.g. a Digital Subscriber Line (DSL) router at the premises of a fixed-line subscriber, maintains a layer-2 connection with a broadband network gateway (BNG) hosting services, e.g., an Internet access. In order to achieve BNG redundancy for a plurality of CEs, each of multiple BNGs would have to precautionarily maintain a layer-2 connection with each of the CEs. Since the number of connections scales quadratically with system size, this is an inefficient way of realizing redundancy in terms of scalability, maintenance and provisioning.

    [0003] Existing architectures for customer networks further include an access node (e.g., a DSL Access Multiplexer, DSLAM) functioning as an ATM or Ethernet aggregator that cross-connects the layer-2 interface from the CEs to the layer-2 interface of the BNG. The traffic aggregated from the access nodes is steered to the BNG as an IP node. Point-to-point sessions are established between the CE and the BNG, e.g., using the Point-to-Point Protocol (PPP) over Ethernet (PPPoE), which ensures that all PPPoE frames sent on the wire reach the other end.

    [0004] However, for realizing redundancy when the access node is connected to the BNG using a layer-2 connection in a transport network, point-to-point or point to multipoint links would have to be provided in the transport network for each of the CEs. Therefore, current BNG deployments implement no node redundancy or a 1+1 BNG redundancy. The latter is far away from being an optimal redundancy solution in terms of cost efficiency and flexibility. Moreover, no automatic load balancing can be done between the BNGs for newly connecting CEs.

    [0005] Document WO 2014/068984 A1 may be construed to disclose a network communication system and a virtualization method that make it easy to increase/decrease traffic and to develop a network service. A communication system provided on a network boundary includes an edge network including a plurality of nodes, a network control server that can control the nodes in the edge network, and a service server pool in which a plurality of service servers for respectively providing a plurality of network services are set, wherein the network control server sets a route between a predetermined node in the edge network and each service server, corresponding to each of the plurality of network services.

    [0006] Document EP 2 209 260 A1 may be construed to disclose a method, apparatus and system for virtual network configuration and partition handover. The virtual network configuration method includes the following steps: The serving edge device obtains a target virtual network identifier and a corresponding interface identifier, uses the target virtual network identifier and the corresponding interface identifier to generate a Layer-2 Control (L2C) protocol packet, and sends out the L2C protocol packet; the communication proxy device that receives the L2C protocol packet obtains the target virtual network identifier and the corresponding interface identifier from the L2C protocol packet, and sets up a mapping relation between a target virtual network and an interface.

    [0007] Document US 2014/071811 A1 may be construed to disclose an access method and system of a customer premise equipment, and a broadband network gateway. The access method of a customer premise equipment includes: receiving, by a BNG in a BNG pool, an access request packet sent by a CPE, where the access request packet carries an identifier of a CPE group to which the CPE belongs; and obtaining, by the BNG, an access policy of the CPE group according to the identifier of the CPE group, and performing access control on the CPE according to the access policy. A BNG in a BNG pool is enabled to provide an access service for a CPE according to an access policy, so that when a BNG in a BNG pool is faulty, a BNG that is not faulty in the BNG pool can provide an access service for a CPE originally accessing the faulty BNG, thereby improving the reliability of the entire network.

    Summary



    [0008] Accordingly, there is a need for a technique that allows efficiently using a plurality of broadband network gateways.
    According to the disclosure, there are provided a device, a method and a computer program product according to the independent claims. Further embodiments are defined in their dependent claims. Those embodiments which do not fall within the scope of the appended set of claims are to be interpreted as background information, useful for understanding the invention.
    As to one aspect, a device for routing datagrams between customer equipments (CEs) and a pool of broadband network gateways (BNGs) is provided. The device comprises a processor configured to trigger establishing a first connection between the device and each of the CEs, to trigger establishing a second connection between the device and each BNG in the pool of BNGs, and to map each of the first connections to one of the second connections, the mapping specifying the routing of the datagrams.

    [0009] The CEs may include a customer edge router and/or a modem, e.g., a DSL modem or a cable modem. The BNGs may be connected to an Internet backbone. The device may be implemented at a provider edge (PE) router. E.g., the device may be implemented at a fixed-mobile convergence (FMC) router. Alternatively or in addition, the device may be implemented at an access node (AN).

    [0010] The mapping may be dynamical. The pool may include at least two or three BNGs. At least two first connections and/or at least two or three second connections may be established.

    [0011] The routing may include forwarding datagrams of one of the first and second connections to the other one of the first and second connections. The first connections and/or the second connections may be based on a packet-switched communications protocol, e.g., an Asynchronous Transfer Mode, ATM, communications protocol or an Ethernet communications protocol. The datagram may be a cell (e.g., an ATM cell) or a frame (e.g., e.g., an Ethernet frame).

    [0012] The mapping may include storing a forwarding rule for the mapped first and second connections. The forwarding rule may specify the forwarding of an incoming access frame on the first connection to an outgoing frame on the second connection.

    [0013] Each of the first connections may include a Data Link layer tunnel (also referred to as a layer 2 tunnel). Each of the first connections between the device and the CEs may be defined by a tagged virtual local area network (VLAN).

    [0014] The first connections may be defined by different VLANs. The first connections may include multipoint connectivity. The first connections may be established according to IEEE 802.1Q. The first connection may be defined by a C-tag.

    [0015] Each of the second connections may include a Data Link layer tunnel (also referred to as a layer 2 tunnel). The second connection may be based on a layer-2 VPN, e.g., over an Internet Protocol (IP) network or a Multiprotocol Label Switching (MPLS) network. The second connections may include pseudo-wires (PWs), e.g., in a Virtual Private LAN Service (VPLS) domain.

    [0016] Alternatively or in addition, some or each of the second connections between the device and the BNGs in the pool may be defined by different VLANs. The VLANs defining the second connections may be stacked, e.g., according to the standard IEEE 802.1ad (also referred to as QinQ). Each CE may be associated with one QinQ VLAN tag. E.g., the datagrams may include a first tag (e.g., a C-tag) associated with one of the CEs and a second tag (e.g., an S-tag) associated with an access node or one of the BNGs. Alternatively or in combination, the second connections may be defined by different PWs, e.g., according to the Request for Comments (RFC) 3985.

    [0017] One or more first connections may be mapped to one or each of the second connections. E.g., one or more stacked VLANs may be mapped to one of the PWs, wherein the VLAN is CE-specific and the PW is BNG-specific.

    [0018] Establishing the first connection may be triggered in response to a subscriber update and/or a time-out of a previous connection to the corresponding one of the CEs. Each of the CEs and the device may be arranged for static point-to-point communication.

    [0019] After establishment of layer-2 connectivity between CE and BNG, upper layer may establish their sessions, e.g., initiated by the CE. The device (e.g., the processor) may further be configured to bidirectionally forward point-to-point protocol (PPP) messages according to the mapping. Any data link protocol, e.g., the point-to-point protocol, may be used for authentication.

    [0020] The device may be statically configured with information about a capacity of at least one of the BNGs in the pool and the second connections, and/or the processor may further be configured to receive or estimate a capacity for at least one of the BNGs in the pool and the second connections. Information as to the capacity for at least one of the BNGs in the pool and the second connections may be maintained at the device. The device may further comprise a database configured to maintain a list of available BNGs and the associated capacity information or an interface for accessing the database.

    [0021] The processor may regularly or periodically trigger sending messages towards the BNGs in the pool for determining an availability of the BNGs in the pool and/or the second connections. The messages may be keep-alive messages or datagrams without data payload. Alternatively or in addition, a keep-alive mechanism according to an underlying communication protocol may be employed.

    [0022] The mapping of the first connections to the second connections may depend on at least one of the availability and the capacity. E.g., the mapping may provide for load balancing between the BNGs. The first connections may be consecutively mapped to the second connections according to a sequence. The second connection that is next according to the sequence may be skipped, if the next second connection or the corresponding BNG is not available or has an insufficient capacity.

    [0023] Each of the first connections may be mapped to the second connection having the highest capacity. Alternatively or in addition, the first connections may be mapped to the second connections so that the capacities of the second connections and/or the BNGs reduced by respective capacities of the corresponding first connections are balanced. Alternatively or in addition, the first connections may be mapped to the second connections in a round-robin scheme. The second connection that is next according to the round-robin scheme may be skipped, if the next second connection or the corresponding BNG is not available or has an insufficient capacity. As a still further alternative or in addition, the connections may be mapped depending on a preference, e.g. a preference defined for one or more of the CEs in relation to one or more of the BNGs. By way of example, a local preference may prefer the BNG that is physically or topologically close or closest to the device and/or the CE.

    [0024] The processor is further configured to map and/or trigger establishing a further second connection if a sum of the capacities or the availabilities is less than a sum of capacities of the first connections or a number of the first connections.

    [0025] The capacity may relate to a capacity (e.g., processing or bandwidth in terms of gigabits per second) or a number of connections (e.g., connections of a certain type such as DSL connections). For the second connections and/or the BNGs, the capacity may relate to a maximum capacity or a maximum number of concurrent connections. For the first connections and/or the CEs, the capacity may relate to a required capacity.

    [0026] The device may further comprise an interface for setting at least one of the capacity and the availability of one of the BNGs to zero, e.g., for triggering off-loading the BNG.

    [0027] Establishing a further second connection to a further BNG may be triggered. The further second connection may be triggered by establishing one of the first connections, by an unavailability or maintenance status of one of the second connections, and/or by an unavailability or maintenance status of the corresponding one of the BNGs.

    [0028] The mapping may be initialized based on an architectural structure of the pool of BNGs. The mapping may include re-mapping one of the first connections to another one of the second connections. The re-mapping may be triggered by establishing one of the first connections, by an unavailability or maintenance status of the second connection previously mapped to the one of the first connections, by an unavailability or maintenance status of the corresponding one of the BNGs, and/or by an availability of one or more further BNGs in the pool.

    [0029] The first connections may include landlines. The CEs may include fixed-line terminals. A physical layer underlying the first connections and/or the second connections may include at least one of a copper cable, an optical fiber and a microwave link. The optical fiber may include a Single-Mode optical Fiber (SMF) or a Multi-Mode optical Fiber (MMF).

    [0030] The device may further comprise at least one first interface towards the CEs and/or at least one second interface towards the BNGs. The first connections may use the at least one first interface. The second connections may use the at least one second interface. The device (e.g., the processor) may be further configured to route or trigger routing datagrams between the first interface and second interface.

    [0031] A physical layer of the first connection may further comprise the AN, e.g., an aggregator, multiplexer or concentrator. The AN may be arranged between the CEs and the device. The AN may aggregate, multiplex or concentrate Asynchronous Transfer Mode (ATM) traffic, Ethernet traffic or digital subscriber line (DSL) traffic. The AN may be a Digital Subscriber Line Access Multiplexer (DSLAM).

    [0032] As to another aspect, a system for routing datagrams between customer equipments (CEs) and broadband network gateways (BNGs) is provided. The system comprises a pool of BNGs, one or more access nodes (ANs) providing access to the CEs via a virtual local area network (VLAN), and a device connected to the one or more ANs and to the pool of BNGs for routing the datagrams according to the device aspect.

    [0033] The system may comprise a plurality of the devices. At least one of the ANs may be connected to two or more of the devices. Some or each of the devices may further be connected to at least another one of the ANs that is different from the at least one of the ANs. The at least one of the ANs and the at least another one of the ANs may be allocated to the same pool of BNGs.

    [0034] As to a further aspect, a method of routing datagrams between customer equipments, CEs, and a pool of broadband network gateways (BNGs) is provided. The method comprises the step of triggering establishing a first connection between the device and each of the CEs, the step of triggering establishing a second connection between the device and each BNG in the pool of BNGs, and the step of mapping each of the first connections to one of the second connections, the mapping specifying the routing of the datagrams.

    [0035] The method may further comprise any feature disclosed in the context of the device and system aspects. Particularly, the method may comprise one or more steps corresponding to an operation of any one of the processor, the device and the system.

    [0036] As to a still further aspect, a computer program product is provided. The computer program product comprises program code portions for performing any one of the steps of the method aspect when the computer program product is executed by one or more computing devices. The computer program product may be stored on a computer-readable recording medium. The computer program product may also be provided for download via the BNGs, a data network and/or the Internet.

    Brief Description of the Drawings



    [0037] Further details of embodiments of the technique are described with reference to the enclosed drawings, wherein:
    Fig. 1
    schematically illustrates a first embodiment of a system for providing broadband access comprising a device for routing datagrams between customer equipments and broadband network gateways;
    Fig. 2
    shows a flowchart for a method of routing datagrams between customer equipments and broadband network gateways, which is implementable in the device of Fig. 1;
    Fig. 3
    schematically illustrates a second embodiment of a system for providing broadband access comprising a provider edge router for performing the method of Fig. 2;
    Fig. 4
    schematically illustrates a third embodiment of a system for providing broadband access comprising a provider edge router for performing the method of Fig. 2; and
    Fig. 5
    schematically illustrates a signaling flow resulting from an implementation of the method of Fig. 2.

    Detailed Description



    [0038] In the following description, for purposes of explanation and not limitation, specific details are set forth, such as a specific network environment, in order to provide a thorough understanding of the technique disclosed herein. It will be apparent to one skilled in the art that the technique may be practiced in other embodiments that depart from these specific details. Moreover, while the following embodiments are primarily described for a Digital Subscriber Line (DSL) access over wires, e.g. according to the Technical Report TR-101 of the Broadband Forum (BBF), it is readily apparent that the technique described herein may also be applied for any other access technology including wired communication (such as fiber optics) or wireless communication (such as microwave links, a Wireless Local Area Network according to the standard family IEEE 802.11 and a Worldwide Interoperability for Microwave Access according to the standard family IEEE 802.16).

    [0039] Moreover, those skilled in the art appreciate that the services, functions, steps and units explained herein may be implemented using software functioning in conjunction with a programmed microprocessor, an Application Specific Integrated Circuit (ASIC), a Field Programmable Gate Array (FPGA), a Digital Signal Processor (DSP) or a general purpose computer, e.g., including an Advanced RISC Machine (ARM). It will also be appreciated that, while the following embodiments are primarily described in context with methods and devices, the invention may also be embodied in a computer program product as well as in a system comprising a computer processor and memory coupled to the processor, wherein the memory is encoded with one or more programs that may perform the services, functions, steps and implement the units disclosed herein.

    [0040] Fig. 1 schematically illustrates a first embodiment of a system 100 for providing network access to a plurality of Customer Equipments (CEs) 102 as an exemplary environment for implementing the technique. The system 100 comprises a pool 110 of Broadband Network Gateways (BNGs) 112 and a device 120 for routing datagrams between the CEs 102 and the pool 110 of BNGs 112.

    [0041] The device 120 comprises a first establishing unit 122 configured to trigger establishing a first connection 123 between the device 120 and each of the CEs 102. A second establishing unit 124 is configured to trigger establishing a second connection 125 between the device 120 and each of the BNGs 112 in the pool 110. A mapping unit 126 is configured to map each of the first connections 123 to one of the second connections 125. The mapping specifies the routing of the datagrams that is optionally performed by the device 120.

    [0042] The device 120 may be implemented in a Provider Edge (PE) router. The PE router serves a certain group of fixed network subscribers, each of which is equipped with at least one of the CEs 102. The PE router may be a Fixed-Mobile Convergence (FMC) access router.

    [0043] The BNG pool 110 is a logical group of BNGs 112 that may be physically collocated in a pool area. All BNGs 112 in such a pool 110 share the same responsibility of handling the generated subscriber traffic. Each CE 102, i.e., each fixed subscriber, can be served by any BNG 112 within the pool 110. The mapping defines a serving relation. In normal operation, the mapping is once set-up and not changed.

    [0044] The first connections 123 include individual physical links (e.g., wires, fibers or microwave links). Alternatively or in combination, the first connections 123 include logical connections, e.g., in an access network. By way of example, the first connections 123 are realized as a Queue in Queue (QinQ), e.g., using a stacked Virtual Local Area Network (VLAN). In an embodiment of the device, e.g., implemented in the FMC router, both the first connections 123 and the second connections 125 run on MPLS as VPLS to AN and to BNG, respectively.

    [0045] The second connections 125 are logical connections in a transport network 130. The second connections 125 are realized as layer-2 tunnels, e.g., using so-called Pseudo Wires (PWs). By way of example, the transport network 130 includes a Virtual Private Network (VPN), e.g., a Virtual Private LAN Service (VPLS). The second connections 125 use Asynchronous Transfer Mode (ATM) or Ethernet as a frame transport mechanism. The transport network 130 uses MPLS or IP as a packet transport mechanism. The PWs may use a Layer-2 Tunneling Protocol (L2TP, e.g., Version 3) or Ethernet over MPLS (EoMPLS) specified by the Internet Engineering Task Force (IETF).

    [0046] Fig. 2 shows a flowchart for a method 200 of routing datagrams between a group of customer equipments and a pool of broadband network gateways. In a step 202 of the method 200, establishing a first connection towards each of the customer equipments in the group is triggered. Establishing a second connection towards each of the BNGs 204 is triggered in a step 204. The first and second connections are mapped in a step 206 so that each first connection is uniquely associated with one of the second connections.

    [0047] Some or all of the second connections may be established prior to the step 202. The number of established second connections may be chosen so that there is a subset of unmapped second connections, e.g., for redundancy, load-balancing or scheduled maintenance.

    [0048] The method 200 may be performed by one or more processors, e.g., in the device 120. The steps 202, 204 and 206 may be performed by the functional units 122, 124 and 126, respectively.

    [0049] In the step 204, the device 120 sets up one second connection 125 per BNG 112 in the pool 110. In an implementation of the device 120, e.g. using existing protocols between the BNG 112 and the device 120, the capacity information is statically provisioned to the device 120. In an advanced implementation, the device 120 receives capacity information as to the individual capacities of the BNGs 112 in the pool 110, e.g., in response to the step 204.

    [0050] The mapping step 206 realizes load sharing by considering the relative capacities of the BNGs 112. Connection information for identifying the established first connections 123, e.g., a VLAN tag, is forwarded along the mapped second connections 125 to the corresponding BNGs 112.

    [0051] Network level redundancy is the capability of the device 120, e.g., the PE router, to detect that a serving BNG pool member, i.e., one of the BNGs 112 which second connection 125 is mapped to one or more of the first connections 123, is out of service and to re-distribute traffic of the one or more first connections 123 to other BNG pool members. In an advanced embodiment, the one or more first connections 123 are mapped to one or more previously unmapped second connections 125 or previously mapped second connections 125 with residual capacity.

    [0052] In a reduced embodiment, the device 120 tries to establish a session (e.g., a L2 VLAN connection) via one of the second connections 125 to one of the BNGs 112. In case of a failure, the device 120 re-tries a next second connection 125 to a next BNG 112 in the pool 100, until the session is successfully re-established.

    [0053] Forcefully changing the L2 mapping of the first connection 123 of the CE 102 to another second connection 125 may trigger the CE 102 to re-establish its session (e.g., involving layers higher than L2).

    [0054] In case of a planned maintenance for one of the BNGs 112 in the pool 110, the capacity of the BNG 112 is set to zero. As a result, no further first connection (and thus no L2 session) is dynamically mapped to the second connection 125 of the BNG 112. After a shut-down timer at the device 120 has expired, the mapping of the one or more first connections 123 previously mapped to the second connection 125 of the BNG 112 is changed to one or more other second connections 125. As a result, all existing L2 sessions are disconnected from the BNG 112 and re-distributed, which is less service-impacting than directly shutting down the BNG 112.

    [0055] In case an overall capacity of the BNGs 112 in the pool 110 needs to be enhanced, a further BNG 112 is added to the pool 110 as a new pool member. Based on the non-zero residual capacity of the added BNG 112, a new first connections 123 (e.g., triggered by an L2 session requests received by the device 120) are mapped to the second connection 125 of the added BNG 112. Hence, the new session enters the added BNG 112.

    [0056] Fig. 3 schematically illustrates a second embodiment for the system 100 including a plurality of access nodes 104. The need to enhance the overall capacity and/or to establish new first connections may be triggered by adding a new access node 104 to the BNG pool 110. Each access node 104 (e.g. a DSLAM or optical termination) hosts a number of CEs 102 located in the subscriber premises, which can be represented by C-VLANs.

    [0057] In a variant of the second embodiment, the system 100 comprises more than one device 120, e.g., one device 120 implemented at each of a plurality of the PE routers. Two or more of the devices 120 are connected to one access node 104, as is illustrated for the access node in the center of Fig. 3. Connecting two or more of the devices 120 to one access node 104 provides redundancy from the perspective of the access node 104.

    [0058] In the second embodiment of the system 100, each CE 102 (i.e., each fixed-network subscriber) matches a QinQ VLAN tag. E.g., each CE 102 defines C-tags. The corresponding C-VLAN is also referred to as an inner VLAN. The access node 104 aggregates the Ethernet traffic of the plurality of CEs 102. Each access node 104 defines an S-tag in addition to the C-tag. The combination of S-tag and C-tag (i.e., the QinQ VLAN tag) defines a stacked VLAN and uniquely identifies each of the first connections 123.

    [0059] The double-tagged frames (or QinQ-tagged frames) are routed by the PE router according to the mapping. Each BNG 112 in the pool 110 is capable of handling all L2 subscriber information (e.g., the QinQ tags).

    [0060] The device 120 dynamically creates the second connections 125 (e.g., L2 tunnels such as PWs) for carrying the L2 session associated with one of the stacked VLANs. The device 120 implements a mechanism to map (i.e., cross-connect) the first connections (e.g., the active subscriber VLANs on attachment circuits of the one or more access nodes 104) across all working second connections 125.

    [0061] The mapping unit 126 realizes an (N+1)-geographical BNG redundancy. The operation of the device 120 according to the method 200 is controlled by a data model. The data model may be implemented as an enhancement to existing PE routers.

    [0062] The data model comprises a first status list with entries for each of the first connections 123, e.g., the connected VLANs coming from the access nodes 104 and representing a residential access CE 102. The first connections 123 are identified based on a VLAN identifier, a C-VLAN identifier (e.g., C-tag), an S-VLAN identifier (e.g., S-tag), an ATM Permanent Virtual Circuit (ATM PVC), etc. Alternatively or in addition, the entry is indicative of a service (e.g., telephony or video streaming) within the CE 102 associated with the first connection 123.

    [0063] The data model further comprises a second status list of pooled BNGs 112, for example represented by their IP addresses. Entries in the second status list include a static capacity figure of each pooled BNG 112, for example a maximum number of supported subscribers of the BNG node 112. Alternatively or in addition, the entries include a state of reachability (also referred to as availability) of the BNGs 112. For example the state may indicate whether the respective second connections 125 to the BNGs 112 are up and/or can be established for L2 sessions to the respective BNGs 112.

    [0064] The entries further comprise a state of load per BNG 112. E.g., the load is represented by a number of subscriber L2 sessions via the device 120 to a specific BNG 112. Alternatively or in addition, the data model comprises a table storing all established L2 sessions over the second connections 125 (e.g., within the L2 tunnels such as PWs) towards the BNGs 112 of the pool 110.

    [0065] A mapping table stores the relation between the CEs 102 (e.g. the C-VLANs 123) and the L2 session over the second connections 125 (e.g., the L2 tunnels). A forwarding model (also referred to as switching matrix) for incoming L2 access frames from the CEs 102 maps to the outgoing L2 session towards a BNG.

    [0066] The data model can be manually configured, dynamically provisioned by an Operations Support System (OSS) or dynamically fetched by the device 120 from an administration database.

    [0067] Fig. 4 schematically illustrates a third embodiment of the system 100. Any feature of the third embodiment can be implemented in variants of the first and second embodiments.

    [0068] The system 100 comprises an access network 400 providing Ethernet access from the CE 102. The access network 400 optionally includes access nodes 104 and/or a first reference point 402 according to Sect. 2.2 of the document BBF TR-101. The transport network 130 (also referred to a metro network) uses IP or MPLS transport. The transport network 130 optionally includes a second reference point 404 according to Sect. 2.5 of the document BBF TR-101.

    [0069] The PE router implements the device 120. The PE router is manually provisioned or automatically fetches provisioning data from the database of an administration server 406. The mapping is stored in the switching matrix. The switching matrix is stored at the device 120 implemented at the PE router. In a variant, the device 120 is not implemented in the PE router. E.g., the device 120 is implemented by the administration server 406 connected to the PE router. In the variant, the switching matrix is stored at the PE router. The device 120 remotely updates the switching matrix or transfers an updated switching matrix to the PE router for initializing or changing the mapping.

    [0070] The device 120 automatically establishes the second connections 125 as L2 tunnels (for example implemented as MPLS PWs) to each BNG 112 of the pool 110 in the step 204. The tunnels represent the L2 point-to-point connectivity used for dynamically connecting each first connection 123 (i.e., the subscriber C-VLAN of the CE 102) to one of the BNGs 112. Once the second connections 125 have been set up, the PE router maintains the accessibility of each BNG 112 and the relative capacity of each BNG 112 in the pool 110.

    [0071] For each defined first connection 123 (e.g., each C-VLAN), the device 120 automatically initializes an Ethernet switching matrix for mapping the one or more first connections 123 to an L2 session in the respective L2 tunnel connecting one BNG 112 of the pool 110.

    [0072] The mapping 206 thus gives rise to an L2 connectivity 412 (e.g., an Ethernet link or VLAN) between the CE 120 and the selected BNG 112.

    [0073] In at least some implementations, the subscriber handling at the BNGs 112 is not affected by the dynamical mapping of the step 206. The pool 110 is transparent from the perspective of each BNG 112. By way of example, the BNG 112 handles the L2 session in the L2 tunnel as an attached subscriber CE 102 (e.g., as in a conventional system).

    [0074] The L2 connectivity 412 between the CE 102 and selected BNG 112 ensures that the upper layer sessions (e.g., a point-to-point session and application sessions) can be established.

    [0075] In a discovery stage for establishing a PPPoE session 420, the CE 102 broadcasts a PPPoE Active Discovery Initiation (PADI) packet on the VLAN 412. The device 120 forwards the PADI packet 422 according to the mapping to the BNG 112.

    [0076] The BNG 112 replies by sending a PPPoE Active Discovery Offer (PADO) packet 424 including the MAC address of the BNG 112, its name and the name of the service.

    [0077] Establishing a point-to-point session (or an Internet Protocol over Ethernet, IPoE, session) is then initiated by the CE 102. The BNG 112 identifies the subscriber based on upper layer information. E.g., the BNG 112 identifies the subscriber based on session information provided by the CE 102. Alternatively or in addition, the CE 102 is identified based on the QinQ tag added by the access node 104.

    [0078] The BNGs 112 fetch subscriber data 408 from a central authentication server 410 providing Authentication, Authorization and Accounting (AAA) functionality. The data 408 may be exchanged using the Remote Authentication Dial-In User Service (RADIUS) protocol according to RFCs 2865 to 2869 or the Diameter protocol.

    [0079] The switching matrix indicative of the mapping of the first connections 123 (e.g., C-VLANs) to the second connections 125 (e.g., L2 tunnels) is fixed as long as no second connection 125 goes down and the L2 point-to-point sessions between corresponding CEs 102 and BNGs 102 do not exceed the respective maximum capacity.

    [0080] An implementation of the method 220 for changing the mapping, e.g., for handling a failure of an L2 tunnel or a BNG 112, is described with reference to a signaling flow 500 shown in Fig. 5.

    [0081] The device 120 triggers an initial setup of the second connections 125 based on system architecture in a step 510 as an implementation of the step 204. The device 120 sends requests messages 512 via the second connections 125 to the corresponding BNGs 512 for testing availability and optionally for requesting capacity information.

    [0082] The device 120 stores active sessions (e.g., L2 VLAN connections 412) between the CEs 102 and the BNGs 112 for each second connection 125 (e.g., per PW) in a step 514, e.g., based on reports 516 received from the BNGs 112.

    [0083] Alternatively or in addition, the reports 516 indicate the capacities of the corresponding BNGs 112. Based on the capacities of the BNGs 112 (i.e., the maximum available capacities) and the active sessions (i.e., the occupied capacities), the device 120 initializes or changes the mapping (e.g., for load-balancing, BNG maintenance or BNG redundancy). The mapping is initialized or changed avoiding that the second connection 125 of a fully loaded BNG 112 is mapped to a further first connection 123.

    [0084] In the example illustrated in Fig. 5, the first connection 123 towards the CE 120 is mapped to the second connection 125 towards the third BNG 112. The point-to-point session 420 is established between the CE 120 and the third BNG 112 as described with reference to Fig. 4.

    [0085] The device 120 determines in a step 520 a failure of any one of the BNGs 112 having a second connection 125. By way of example, the device 120 sends tunnel keep-alive (KA) messages 522 along the second connections 125. After expiry of a KA timer at a time 524, the device 120 determines that the third BNG 112 in unreachable.

    [0086] Alternatively or in addition, the device 120 selectively releases the second connection to one of the BNGs 112 to trigger load re-distribution, e.g., when the one BNG 112 is taken out of service for maintenance. Independent of cause, the associated CE 120 observes a PPPoE session timeout. The session timeout causes the CE 120 to broadcast PADI packets 422.

    [0087] The device 120 dynamically updates the mapping of the first connection 123 (e.g., a C-VLAN) to another second connection 125 (e.g., an L2 session or L2 tunnel). The PADI packets 422 from the CE 120 are thus forwarded along the other second connection 125. As a result, a point-to-point link 424 to another BNG 112, e.g., the second BNG 112 in the example of Fig. 5, is established according to the changed mapping, e.g., for load distribution.

    [0088] Once the L2 connectivity (e.g., an Ethernet link) is re-established, a point-to-point session 530 (e.g., a PPPoE session or a IPoE session) is established by the CE 120. The newly connected BNG 112, e.g., the second BNG 112 in Fig. 5, fetches the subscriber data for a user of the CE 120 and/or the previous CE session 420, e.g., from the central authentication server 410. The session 530 thus replaces the session 420.

    [0089] As has become apparent from above description of exemplary embodiments, an automatic and efficient load balancing mechanism can be realized between multiple BNGs for newly connecting CEs. Failure cases, e.g. a BNG failure, can be automatically resolved with minimum hardware redundancy. E.g., a number of passive BNGs is minimized.

    [0090] Existing provider edge routers or Fixed-Mobile Convergence access routers can be enhanced by the technique. Similar routing products deployed for mobile access and fixed access.

    [0091] The technique can be implemented in an architecture for mapping a dynamic customer VLAN to an L2 connection. The L2 connection can be automatically set-up to pooled BNGs, e.g., allowing N+1 redundancy. In this way, scalability, flexible of provisioning and efficient usage of the resources in the fixed networks is improved. Furthermore, geographically dispersed BNG pool members can result in geo-redundancy.

    [0092] Same or other embodiments allow introducing new BNG pool members to enhance the capacity of the BNG pool. The fixed network subscribers VLANs, or groups thereof in an access node, are load-shared across BNG pool members considering a relative capacity of each BNG pool member.

    [0093] Embodiments provide for soft off-loading of BNGs, e.g., to exchange HW without service stoppage. Ongoing sessions can be manually terminated and the subscriber VLANs can be distributed over remaining BNG pool members, so that the CE re-initiates the subscriber sessions.

    [0094] Quality of Service (QoS) considerations can be implemented with the technique. E.g., a preferred choice of hardware can be allocated to certain subscribers by the mapping.

    [0095] Many advantages of the present invention will be fully understood from the foregoing description, and it will be apparent that various changes may be made in the form, construction and arrangement of the units and devices without departing from the scope of the appended claims. Since the invention can be varied in many ways, it will be recognized that the invention should be limited only by the scope of the following claims.


    Claims

    1. A device (120) for routing datagrams between customer equipments, CEs, (102) and a pool (110) of broadband network gateways, BNGs, (112), the device comprising a processor configured to:

    trigger establishing (202) first connections (123) between the device (120) and each of the CEs (102);

    trigger establishing (204) second connections (125) between the device (120) and each BNG (112) in the pool (110) of BNGs (112);

    map (206) each of the first connections (123) to one of the second connections (125), the mapping (206) specifying the routing of the datagrams;

    receive or estimate a capacity for at least one of the BNGs (112) in the pool (110) and the second connections (125); and

    maintain information as to the capacity for the at least one of the BNGs (112) in the pool (110) and the second connections (125),

    wherein the mapping (206) of the first connections (123) to the second connections (125) depends on at least one of an availability of at the least one of the BNGs (112) in the pool (110) and the capacity.


     
    2. The device of claim 1, wherein:

    - the processor, in the mapping (206) operation, is further configured to store a forwarding rule for the mapped first and second connections (123, 125), the forwarding rule specifying the forwarding of an incoming access frame on the first connection (123) to an outgoing frame on the second connection (125); and/or

    - each of the first connections (123) between the device (120) and the CEs (102) includes a Data Link layer tunnel; and/or

    - each of the first connections (123) between the device (120) and the CEs (102) is defined by a tagged virtual local area network, VLAN; and/or

    - each of the second connections (125) between the device (120) and the BNGs (112) includes a Data Link layer tunnel; and/or

    - each of the second connections (125) between the device (120) and the BNGs (112) is defined by a stacked virtual local area network, VLAN, by an MPLS P2P link, and/or by a Pseudo-Wire.


     
    3. The device of claim 1, wherein the device (120) further comprises a database configured to maintain a list of available BNGs (112) and the associated capacity information or an interface for accessing the database.
     
    4. The device of any one of claims 1 to 3, wherein the processor is further configured to periodically trigger sending messages towards the BNGs (112) in the pool (110) for determining the availability of at least one of the BNGs (112) in the pool (110) and the second connections (125).
     
    5. The device of claim 3 or 4, wherein:

    - the first connections (123) are consecutively mapped to the second connections (125) according to a sequence or closest geographical distance, wherein the second connection (125) that is next according to the sequence or the closest geographical distance is skipped, if the next second connection (125) or the corresponding BNG (112) is not available or has an insufficient capacity; and/or

    - the processor is further configured to map and/or trigger establishing a further second connection (125) if a sum of the capacities or the availabilities is less than a sum of capacities of the first connections (123) or a number of the first connections (123).


     
    6. The device of claim 5, further comprising an interface for setting at least one of the capacity and the availability of one of the BNGs (112) to zero for triggering off-loading the BNG (112).
     
    7. The device of any one of claims 1 to 6, wherein:

    - the processor is further configured to trigger establishing a further second connection (125) to a further BNG (112) in response to at least one of establishing one of the first connections (123); an unavailability or maintenance status of one of the second connections (125); and an unavailability or maintenance status of the corresponding one of the BNGs (112); and/or

    - the mapping (206) is initialized according to an architectural structure of the pool of BNGs; and/or

    - the mapping (206) includes re-mapping one of the first connections (123) to another one of the second connections (125) in response to at least one of establishing one of the first connections (123); an unavailability or maintenance status of the second connection (125) previously mapped to the one of the first connections (123); an unavailability or maintenance status of the corresponding one of the BNGs (112); and an availability of one or more further BNGs (112) in the pool (110); and/or

    - the processor is further configured to bidirectionally forward the datagrams between the CE (102) and the BNG (112) according to the mapping (206); and/or

    - the first connections (123) include landlines and/or the CEs (102) include fixed-line terminals.


     
    8. The device of any one of claims 1 to 7, further comprising:

    at least one first interface towards the CEs (102); and

    at least one second interface towards the BNGs (112),
    wherein the first connections (123) use the at least one first interface, and the second connections (125) are configured to use the at least one second interface.


     
    9. The device of claim 8, wherein each of the at least one first interface is connected to an access node, AN, (104) configured to provide access to the CEs (102).
     
    10. The device of claim 9, wherein the AN (104) is configured to aggregate Asynchronous Transfer Mode communication or Ethernet communication.
     
    11. A system (100) for routing datagrams between customer equipments, CEs, (102) and broadband network gateways, BNGs, (112), the system comprising:

    a pool (110) of BNGs (112);

    one or more access nodes, ANs, (104) providing access to the CEs via a virtual local area network, VLAN; and

    a device (120) connected to the one or more ANs (104) and to the pool (110) of BNGs (112) configured to route the datagrams according to any one of claims 1 to 10.


     
    12. The system of claim 11, comprising a plurality of the devices (120), wherein at least one of the ANs (104) is connected to one or more of the devices (120), each of which is further connected to at least another one of the ANs (104).
     
    13. A method (200) of routing datagrams between customer equipments, CEs, (102) and a pool (110) of broadband network gateways, BNGs, (112), the method comprising:

    triggering establishing (202) first connections (123) between the device and each of the CEs (102);

    triggering establishing (204) second connections (125) between the device and each BNG (112) in the pool (110) of BNGs (112);

    mapping (206) each of the first connections (123) to one of the second connections (125), the mapping (206) specifying the routing of the datagrams;

    receiving or estimating a capacity for at least one of the BNGs (112) in the pool (110) and the second connections (125); and

    maintaining information as to the capacity for the at least one of the BNGs (112) in the pool (110) and the second connections (125),

    wherein the mapping (206) of the first connections (123) to the second connections (125) depends on at least one of an availability of the at least one of the BNGs (112) in the pool (110) and the capacity.


     
    14. A computer program product comprising program code portions for performing the steps of claim 13 when the computer program product is executed on one or more computing devices.
     
    15. A computer-readable recording medium configured to store the computer program product of claim 14.
     


    Ansprüche

    1. Vorrichtung (120) zur Leitweglenkung von Datagrammen zwischen Kundengeräten, CEs, (102) und einem Pool (110) von Breitbandnetzwerk-Gateways, BNGs, (112), wobei die Vorrichtung einen Prozessor umfasst, der konfiguriert ist zum:

    Auslösen eines Herstellens (202) erster Verbindungen (123) zwischen der Vorrichtung (120) und jedem der CEs (102) ;

    Auslösen eines Herstellens (204) zweiter Verbindungen (125) zwischen der Vorrichtung (120) und jedem BNG (112) im Pool (110) von BNGs (112);

    Zuordnen (206) jeder der ersten Verbindungen (123) zu einer der zweiten Verbindungen (125), wobei das Zuordnen (206) die Leitweglenkung der Datagramme spezifiziert;

    Empfangen oder Schätzen einer Kapazität für mindestens eines der BNGs (112) im Pool (110) und die zweiten Verbindungen (125); und

    Verwalten von Informationen im Hinblick auf die Kapazität für das mindestens eine der BNGs (112) im Pool (110) und die zweiten Verbindungen (125),

    wobei das Zuordnen (206) der ersten Verbindungen (123) zu den zweiten Verbindungen (125) von mindestens einer von einer Verfügbarkeit des mindestens einen der BNGs (112) im Pool (110) und der Kapazität abhängt.


     
    2. Vorrichtung nach Anspruch 1, wobei:

    - der Prozessor ferner so konfiguriert ist, dass er bei der Operation des Zuordnens (206) eine Weiterleitungsregel für die zugeordneten ersten und zweiten Verbindungen (123, 125) speichert, wobei die Weiterleitungsregel das Weiterleiten eines eingehenden Zugriffsrahmens auf der ersten Verbindung (123) zu einem abgehenden Rahmen auf der zweiten Verbindung (125) spezifiziert; und/oder

    - jede der ersten Verbindungen (123) zwischen der Vorrichtung (120) und den CEs (102) einen Datensicherungsschichttunnel umfasst; und/oder

    - jede der ersten Verbindungen (123) zwischen der Vorrichtung (120) und den CEs (102) durch ein getaggtes virtuelles lokales Netzwerk, VLAN, definiert ist; und/oder

    - jede der zweiten Verbindungen (125) zwischen der Vorrichtung (120) und den BNGs (112) einen Datensicherungsschichttunnel umfasst; und/oder

    - jede der zweiten Verbindungen (125) zwischen der Vorrichtung (120) und den BNGs (112) durch ein getaggtes virtuelles lokales Netzwerk, VLAN, durch einen MPLS-P2P-Link und/oder einen Pseudowire definiert ist.


     
    3. Vorrichtung nach Anspruch 1, wobei die Vorrichtung (120) ferner eine Datenbank, die zum Verwalten einer Liste von verfügbaren BNGs (112) und der zugehörigen Kapazitätsinformationen konfiguriert ist, oder eine Schnittstelle zum Zugreifen auf die Datenbank umfasst.
     
    4. Vorrichtung nach einem der Ansprüche 1 bis 3, wobei der Prozessor ferner so konfiguriert ist, dass er periodisch ein Senden von Nachrichten an die BNGs (112) im Pool (110) zum Bestimmen der Verfügbarkeit mindestens eines der BNGs (112) im Pool (110) und der zweiten Verbindungen (125) auslöst.
     
    5. Vorrichtung nach Anspruch 3 oder 4, wobei:

    - die ersten Verbindungen (123) gemäß einer Reihenfolge oder einer kürzesten geografischen Entfernung nacheinander den zweiten Verbindungen (125) zugeordnet werden, wobei die zweite Verbindung (125), die gemäß der Reihenfolge oder der kürzesten geografischen Entfernung am nächsten ist, übersprungen wird, wenn die nächste zweite Verbindung (125) oder das entsprechende BNG (112) nicht verfügbar ist oder eine unzureichende Kapazität aufweist; und/oder

    - der Prozessor ferner so konfiguriert ist, dass er eine weitere zweite Verbindung (125) zuordnet und/oder ein Herstellen einer solchen auslöst, wenn eine Summe der Kapazitäten oder der Verfügbarkeiten kleiner als eine Summe von Kapazitäten der ersten Verbindungen (123) oder eine Anzahl der ersten Verbindungen (123) ist.


     
    6. Vorrichtung nach Anspruch 5, ferner umfassend eine Schnittstelle zum Setzen mindestens einer von der Kapazität und der Verfügbarkeit eines der BNGs (112) auf null, um Entlastung des BNGs (112) auszulösen.
     
    7. Vorrichtung nach einem der Ansprüche 1 bis 6, wobei:

    - der Prozessor ferner so konfiguriert ist, dass er in Reaktion auf mindestens eines von einer Herstellung einer der ersten Verbindungen (123); einer Nichtverfügbarkeit oder eines Wartungsstatus einer der zweiten Verbindungen (125); und einer Nichtverfügbarkeit oder eines Wartungsstatus des entsprechenden der BNGs (112) eine weitere zweite Verbindung (125) zu einem weiteren BNG (112) herstellt; und/oder

    - das Zuordnen (206) gemäß einer architektonischen Struktur des Pools von BNGs initialisiert wird; und/oder

    - das Zuordnen (206) ein Neuzuordnen einer der ersten Verbindungen (123) zu einer anderen der zweiten Verbindungen (125) in Reaktion auf mindestens eines von einer Herstellung einer der ersten Verbindungen (123); einer Nichtverfügbarkeit oder einem Wartungsstatus der zweiten Verbindung (125), die vorher zu der einen der ersten Verbindungen (123) zugeordnet wurde; einer Nichtverfügbarkeit oder einem Wartungsstatus des entsprechenden der BNGs (112) und einer Verfügbarkeit eines oder mehrerer weiterer BNGs (112) im Pool (110) umfasst; und/oder

    - der Prozessor ferner zum bidirektionalen Weiterleiten der Datagramme zwischen dem CE (102) und dem BNG (112) gemäß dem Zuordnen (206) konfiguriert ist; und/oder

    - die ersten Verbindungen (123) Landleitungen umfassen, und/oder die CEs (102) Festleitungsendgeräte umfassen.


     
    8. Vorrichtung nach einem der Ansprüche 1 bis 7, ferner umfassend:

    mindestens eine erste Schnittstelle zu den CEs (102); und

    mindestens eine zweite Schnittstelle zu den BNGs (112),

    wobei die ersten Verbindungen (123) die mindestens eine erste Schnittstelle verwenden, und die zweiten Verbindungen (125) zum Verwenden der mindestens einen zweiten Schnittstelle konfiguriert sind.


     
    9. Vorrichtung nach Anspruch 8, wobei jede der mindestens einen ersten Schnittstelle mit einem Zugangsknoten, AN, (104) verbunden ist, der zum Bereitstellen von Zugang für die CEs (102) konfiguriert ist.
     
    10. Vorrichtung nach Anspruch 9, wobei der AN (104) zum Aggregieren von Kommunikation im asynchronen Übertragungsmodus oder Ethernet-Kommunikation konfiguriert ist.
     
    11. System (100) zur Leitweglenkung von Datagrammen zwischen Kundengeräten, CEs, (102) und Breitbandnetzwerk-Gateways, BNGs, (112), wobei das System umfasst:

    einen Pool (110) von BNGs (112);

    einen oder mehrere Zugangsknoten, ANs, (104), die Zugang für die CEs über ein virtuelles lokales Netzwerk, VLAN, bereitstellen; und

    eine Vorrichtung (120) nach einem der Ansprüche 1 bis 10, die mit dem einen oder den mehreren ANs (104) und mit dem Pool (110) von BNGs (112) verbunden ist und zum Leiten der Datagramme konfiguriert ist.


     
    12. System nach Anspruch 11, umfassend eine Mehrzahl von Vorrichtungen (120), wobei mindestens einer der ANs (104) mit einer oder mehreren Vorrichtungen (120) verbunden ist, die jeweils mit einem anderen der ANs (104) verbunden sind.
     
    13. Verfahren (200) zur Leitweglenkung von Datagrammen zwischen Kundengeräten, CEs, (102) und einem Pool (110) von Breitbandnetzwerk-Gateways, BNGs, (112), wobei das Verfahren umfasst:

    Auslösen eines Herstellens (202) erster Verbindungen (123) zwischen der Vorrichtung und jedem der CEs (102) ;

    Auslösen eines Herstellens (204) zweiter Verbindungen (125) zwischen der Vorrichtung und jedem BNG (112) im Pool (110) von BNGs (112);

    Zuordnen (206) jeder der ersten Verbindungen (123) zu einer der zweiten Verbindungen (125), wobei das Zuordnen (206) die Leitweglenkung der Datagramme spezifiziert;

    Empfangen oder Schätzen einer Kapazität für mindestens eines der BNGs (112) im Pool (110) und die zweiten Verbindungen (125); und

    Verwalten von Informationen im Hinblick auf die Kapazität für das mindestens eine der BNGs (112) im Pool (110) und die zweiten Verbindungen (125),

    wobei das Zuordnen (206) der ersten Verbindungen (123) zu den zweiten Verbindungen (125) von mindestens einer von einer Verfügbarkeit des mindestens einen der BNGs (112) im Pool (110) und der Kapazität abhängt.


     
    14. Computerprogrammprodukt, umfassend Programmcodeabschnitte zum Ausführen der Schritte nach Anspruch 13, wenn das Computerprogrammprodukt auf einer oder mehreren Computervorrichtungen ausgeführt wird.
     
    15. Computerlesbares Aufzeichnungsmedium, das zum Speichern des Computerprogrammprodukts nach Anspruch 14 ausgelegt ist.
     


    Revendications

    1. Dispositif (120) d'acheminement de datagrammes entre des équipements de client, CE, (102) et un groupe (110) de passerelles de réseau de bande large, BNG, (112), le dispositif comprenant un processeur configuré pour :

    déclencher l'établissement (202) de premières connexions (123) entre le dispositif (120) et chacun des CE (102) ;

    déclencher l'établissement (204) de deuxièmes connexions (125) entre le dispositif (120) et chaque BNG (112) dans le groupe (110) de BNG (112) ;

    mettre en concordance (206) chacune des premières connexions (123) avec l'une des deuxièmes connexions (125), la mise en concordance (206) spécifiant l'acheminement des datagrammes ;

    recevoir ou estimer une capacité d'au moins l'une des BNG (112) dans le groupe (110) et des deuxièmes connexions (125) ; et

    maintenir des informations relatives à la capacité d'au moins l'une des BNG (112) dans le groupe (110) et des deuxièmes connexions (125),

    dans lequel la mise en concordance (206) des premières connexions (123) avec les deuxièmes connexions (125) dépend d'au moins l'une d'une disponibilité de l'au moins une des BNG (112) dans le groupe (110) et de la capacité.


     
    2. Dispositif selon la revendication 1, dans lequel :

    - le processeur, à l'opération de mise en concordance (206), est en outre configuré pour stocker une règle de transfert pour les premières et deuxièmes connexions (123, 125) mises en concordance, la règle de transfert spécifiant le transfert d'une trame d'accès entrante sur la première connexion (123) à une trame sortante sur la deuxième connexion (125) ; et/ou

    - chacune des premières connexions (123) entre le dispositif (120) et les CE (102) inclut un tunnel de couche de liaison de données ; et/ou

    - chacune des premières connexions (123) entre le dispositif (120) et les CE (102) est définie par un réseau local virtuel, VLAN, étiqueté ; et/ou

    - chacune des deuxièmes connexions (125) entre le dispositif (120) et les BNG (112) inclut un tunnel de couche de liaison de données ; et/ou

    - chacune des deuxièmes connexions (125) entre le dispositif (120) et les BNG (112) est définie par un réseau local virtuel, VLAN, empilé par une liaison MPLS P2P, et/ou par un Pseudo-Wire.


     
    3. Dispositif selon la revendication 1, dans lequel le dispositif (120) comprend en outre une base de données configurée pour maintenir une liste de BNG (112) disponibles et les informations de capacité associées ou une interface d'accès à la base de données.
     
    4. Dispositif selon l'une quelconque des revendications 1 à 3, dans lequel le processeur est en outre configuré pour déclencher périodiquement l'envoi de messages vers les BNG (112) dans le groupe (110) pour déterminer la disponibilité d'au moins l'une des BNG (112) dans le groupe (110) et des deuxièmes connexions (125).
     
    5. Dispositif selon la revendication 3 ou 4, dans lequel :

    - les premières connexions (123) sont mises en concordance consécutivement avec les deuxièmes connexions (125) selon une séquence ou une distance géographique la plus proche, dans lequel la deuxième connexion (125) qui est la suivante selon la séquence ou la distance géographique la plus proche est sautée, si la deuxième connexion (125) suivante ou la BNG (112) correspondante n'est pas disponible ou a une capacité insuffisante ; et/ou

    - le processeur est en outre configuré pour mettre en concordance et/ou déclencher l'établissement d'une autre deuxième connexion (125) si une somme des capacités ou des disponibilités est inférieure à une somme de capacités des premières connexions (123) ou à un nombre des premières connexions (123) .


     
    6. Dispositif selon la revendication 5, comprenant en outre une interface de réglage d'au moins l'une de la capacité et de la disponibilité de l'une des BNG (112) à zéro pour déclencher un délestage de la BNG (112).
     
    7. Dispositif selon l'une quelconque des 1 à 6, dans lequel :

    - le processeur est en outre configuré pour déclencher l'établissement d'une autre deuxième connexion (125) à une autre BNG (112) en réponse à au moins l'un de l'établissement de l'une des premières connexions (123) ; un statut d'indisponibilité ou de maintenance de l'une des deuxièmes connexions (125) ; et un statut d'indisponibilité ou de maintenance de l'une correspondante des BNG (112) ; et/ou

    - la mise en concordance (206) est initialisée selon une structure architecturale du groupe de BNG ; et/ou

    - la mise en concordance (206) inclut la remise en concordance de l'une des premières connexions (123) avec une autre des deuxièmes connexions (125) en réponse à au moins l'un de l'établissement de l'une des premières connexions (123) ; un statut d'indisponibilité ou de maintenance de la deuxième connexion (125) précédemment mise en concordance avec l'une des premières connexions (123) ; un statut d'indisponibilité ou de maintenance de l'une correspondante des BNG (112) ; et une indisponibilité d'une ou plusieurs autres BNG (112) dans le groupe (110) ; et/ou

    - le processeur est en outre configuré pour transférer de manière bidirectionnelle les datagrammes entre le CE (102) et la BNG (112) selon la mise en concordance (206) ; et/ou

    - les premières connexions (123) incluent des lignes terrestres et/ou les CE (102) incluent des terminaux de ligne fixe.


     
    8. Dispositif selon l'une quelconque des revendications 1 à 7, comprenant en outre :

    au moins une première interface vers les CE (102) ; et

    au moins une deuxième interface vers les BNG (112),

    dans lequel les premières connexions (123) utilisent l'au moins une première interface, et les deuxièmes connexions (125) sont configurées pour utiliser l'au moins une deuxième interface.


     
    9. Dispositif selon la revendication 8, dans lequel chacune de l'au moins une première interface est connectée à un nœud d'accès, AN, (104) configuré pour fournir un accès aux CE (102).
     
    10. Dispositif selon la revendication 9, dans lequel l'AN (104) est configuré pour agréger une communication de mode de transfert asynchrone ou une communication Ethernet.
     
    11. Système (100) d'acheminement de datagrammes entre des équipements de client, CE, (102) et des passerelles de réseau de bande large, BNG, (112), le système comprenant :

    un groupe (110) de BNG (112) ;

    un ou plusieurs nœuds d'accès, AN, (104) fournissant un accès aux CE par l'intermédiaire d'un réseau local virtuel, VLAN ; et

    un dispositif (120) connecté aux un ou plusieurs AN (104) et au groupe (110) de BNG (112) configuré pour acheminer les datagrammes selon l'une quelconque des revendications 1 à 10.


     
    12. Système selon la revendication 11, comprenant une pluralité des dispositifs (120), dans lequel au moins l'un des AN (104) est connecté à un ou plusieurs des dispositifs (120), chacun d'entre eux étant en outre connecté à au moins un autre des AN (104).
     
    13. Procédé (200) d'acheminement de datagrammes entre des équipements de client, CE, (102) et un groupe (110) de passerelles de réseau de bande large, BNG, (112), le procédé comprenant :

    le déclenchement de l'établissement (202) de premières connexions (123) entre le dispositif et chacun des CE (102) ;

    le déclenchement de l'établissement (204) de deuxièmes connexions (125) entre le dispositif et chaque BNG (112) dans le groupe (110) de BNG (112) ;

    la mise en concordance (206) de chacune des premières connexions (123) avec l'une des deuxièmes connexions (125), la mise en concordance (206) spécifiant l'acheminement des datagrammes ;

    la réception ou l'estimation d'une capacité d'au moins l'une des BNG (112) dans le groupe (110) et des deuxièmes connexions (125) ; et

    le maintien d'informations relatives à la capacité d'au moins l'une des BNG (112) dans le groupe (110) et des deuxièmes connexions (125),

    dans lequel la mise en concordance (206) des premières connexions (123) avec les deuxièmes connexions (125) dépend d'au moins l'une d'une disponibilité de l'au moins une des BNG (112) dans le groupe (110) et de la capacité.


     
    14. Produit de programme informatique comprenant des portions de code de programme pour réaliser les étapes de la revendication 13 lorsque le produit de programme informatique est exécuté sur un ou plusieurs dispositifs informatiques.
     
    15. Support d'enregistrement lisible par ordinateur configuré pour stocker le produit de programme informatique selon la revendication 14.
     




    Drawing




















    Cited references

    REFERENCES CITED IN THE DESCRIPTION



    This list of references cited by the applicant is for the reader's convenience only. It does not form part of the European patent document. Even though great care has been taken in compiling the references, errors or omissions cannot be excluded and the EPO disclaims all liability in this regard.

    Patent documents cited in the description