(19)
(11)EP 3 337 265 B1

(12)EUROPEAN PATENT SPECIFICATION

(45)Mention of the grant of the patent:
24.02.2021 Bulletin 2021/08

(21)Application number: 16835063.5

(22)Date of filing:  04.08.2016
(51)International Patent Classification (IPC): 
H04W 76/25(2018.01)
(86)International application number:
PCT/JP2016/072902
(87)International publication number:
WO 2017/026366 (16.02.2017 Gazette  2017/07)

(54)

APPARATUS AND METHOD RELATED TO DUAL CONNECTIVITY

VORRICHTUNG UND VERFAHREN IM ZUSAMMENHANG MIT DUALER KONNEKTIVITÄT

DISPOSITIF ET PROCÉDÉ RELATIFS À UNE CONNECTIVITÉ DOUBLE


(84)Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

(30)Priority: 11.08.2015 JP 2015159142

(43)Date of publication of application:
20.06.2018 Bulletin 2018/25

(73)Proprietor: NEC Corporation
Tokyo 108-8001 (JP)

(72)Inventor:
  • HAYASHI, Sadafuku
    Tokyo 108-8001 (JP)

(74)Representative: MacDougall, Alan John Shaw et al
Mathys & Squire LLP The Shard 32 London Bridge Street
London SE1 9SG
London SE1 9SG (GB)


(56)References cited: : 
  
  • ALCATEL-LUCENT ET AL: "Handling of user inactivity in dual connectivity release 13", 3GPP DRAFT; R3-151023_USERINACTIVITY, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG3, no. Fukuoka, Japan; 20150525 - 20150529 15 May 2015 (2015-05-15), XP050969412, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/tsg_ran/WG3_Iu /TSGR3_88/Docs/ [retrieved on 2015-05-15]
  • NEC: "UE-AMBR Coordination for LTE Dual Connectivity", 3GPP DRAFT; R3-150610-DC-UE-AMBR-DISC, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG3, no. Santa Cruz, Spain; 20150420 - 20150424 11 April 2015 (2015-04-11), XP050937228, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/Meetings_3GPP_ SYNC/RAN3/Docs/ [retrieved on 2015-04-11]
  • ALCATEL -LUCENT ET AL.: 'Text Proposals for handling user inactivity in dual connectivity release 13' 3GPP TSG-RAN WG3#88 R3-151312 25 May 2015, XP050983441
  • ERICSSON: 'Response to R3-151023 & R3-151024' 3GPP TSG-RAN WG3#88 R3-151179 25 May 2015, XP050977637
  • NEC: 'User Inactivity in SCG bearer option' 3GPP TSG-RAN WG3#89 R3-151488 14 August 2015, XP050993200 Retrieved from the Internet: <URL:HTTP://WWW.3GPP.ORG/FTP/TSG_RAN/WG3_IU /TSGR3_89/DOCS/>
  • ALCATEL-LUCENT ET AL: "Text Proposals for handling user inactivity in dual connectivity release 13", 3GPP DRAFT; R3-151024_TPUSERINACTIVE, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG3, no. Fukuoka, Japan; 20150525 - 20150529 15 May 2015 (2015-05-15), XP050969414, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/tsg_ran/WG3_Iu /TSGR3_88/Docs/ [retrieved on 2015-05-15]
  • HUAWEI: "Discussion on the enhancement for UE-AMBR", 3GPP DRAFT; R3-150573 DISCUSSION ON THE ENHACNEMENT FOR UE-AMBR, 3RD GENERATION PARTNERSHIP PROJECT (3GPP), MOBILE COMPETENCE CENTRE ; 650, ROUTE DES LUCIOLES ; F-06921 SOPHIA-ANTIPOLIS CEDEX ; FRANCE , vol. RAN WG3, no. Santa Cruz, Spain; 20150420 - 20150424 11 April 2015 (2015-04-11), XP050937191, Retrieved from the Internet: URL:http://www.3gpp.org/ftp/Meetings_3GPP_ SYNC/RAN3/Docs/ [retrieved on 2015-04-11]
  
Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).


Description

[Technical field]



[0001] The present invention relates to an apparatus and a method related to dual connectivity.

[Background Art]



[0002] A user equipment (UE) such as a smartphone often transmits and receives data for an application in the background. However, the UE does not always transmit and receive data. Therefore, an evolved Node B (eNB) monitors an activity of the UE, for example, and if there is no transmission and reception of data by the UE in a certain time period, the eNB may request a Mobility Management Entity (MME) to release the UE. For example, Non-Patent Literature 1 discloses a feature that resulting from a user inactivity, the eNB may transmit a UE CONTEXT RELEASE REQUEST to the MME.

[0003] On the other hand, in 3GPP Release 12, dual connectivity is introduced. The dual connectivity is an operation mode of a UE allowing for connection to both a Master eNB (MeNB) and a Secondary eNB (SeNB). In the dual connectivity, as for a control plane, an S1-MME is provided between the MeNB and the MME. However, the S1-MME is not provided between the SeNB and the MME. Therefore, the MeNB receives control information on a dual connectivity UE from the MME, and transmits the same to the MME. Furthermore, a user plane has two different architectures. In a first architecture, an S1-U is provided between the MeNB and a Serving Gateway (S-GW). However, the S1-U is not provided between the SeNB and the S-GW. Therefore, user plane data is not directly transmitted between the S-GW and the SeNB, but transmitted and received, via the MeNB (i.e., through the S1-U and an X2-U), between the S-GW and the SeNB. In such a first architecture, there is a bearer whose radio protocols are located in both the MeNB and the SeNB to use resources of both the MeNB and the SeNB. In this case, the bearer is referred to as a split bearer. In a second architecture, the S1-U is provided between the MeNB and the S-GW, and the S1-U is also provided between the SeNB and the S-GW. Therefore, the user plane data is directly transmitted and received between the S-GW and the SeNB, without passing through the MeNB. In such a second architecture, there is a bearer whose radio protocols are located in the SeNB to use resources of the SeNB. In this case, the bearer is referred to as a Secondary Cell Group (SCG) bearer.

[0004] In a case of the split bearer, data transmitted in an SCG (i.e., a group of serving cells related to the SeNB) passes through the MeNB, and thus, the MeNB can monitor an activity of the UE. On the other hand, in a case of the SCG bearer, data transmitted in the SCG does not pass through the MeNB, and thus, the MeNB can not directly monitor the activity of the UE and relies upon the monitoring by the SeNB. These features are disclosed in Non-Patent Literature 2.

[0005] Non Patent Literature 3 and 4 describe proposals for handling of user inactivity in dual connectivity. One proposal comprises coordination between the MeNB and the SeNB through exchange of notifications each time one of their two inactivity timers expires. Non Patent Literature 5 describes solutions for enabling the Se NB to assist the Me NB in setting or modifying the SeNB UE-AMBR; either the SeNB proposes a new UE-AMBR or it provides assistance information to the MeNB.

[Citation List]


[Non Patent Literature]



[0006] 

[NPL 1] 3GPP TS 36.413 V13.0.0 (2015-06) 3rd Generation Partnership Project; Technical Specification Group Radio Access Network (E-UTRAN); Sl Application Protocol (S1AP) (Release 13)

[NPL 2] 3GPP TR 36.875 V13.0.0 (2015-06) 3rd Generation Partnership Project; Technical Specification Group Radio Access Network (E-UTRAN); Extension of dual connectivity in E-UTRAN (Release 13)

[NPL 3] Alcatel-Lucent et al.: "Text Proposals for handling user inactivity in dual connectivity release 13", 3GPP R3-151024; TSG-RAN WG3 Meeting #88; Fukuoka, Japan; 15 May 2015

[NPL 4] Alcatel-Lucent et al: "Handling of user inactivity in dual connectivity release 13", 3GPP R3-151023; TSG-RAN WG3 Meeting #88; Fukuoka, Japan; 15 May 2015

[NPL 5] NEC: "UE-AMBR Coordination for LTE Dual Connectivity", 3GPP R3-150610; TSG-RAN WG3 Meeting RAN3#87bis; Santa Cruz, Spain; 11 April 2015


[Summary of Invention]


[Technical Problem]



[0007] However, in a case of the SCG bearer as disclosed also in Non-Patent Literature 2, control related to an activity of a UE may be distributed between an MeNB and an SeNB. As a result, an unnecessary operation may occur, for example.

[0008] For example, there is a case where data of the UE is not transmitted in an SCG, but data of the UE is transmitted in a Master Cell Group (MCG) (i.e., a group of serving cells related to the MeNB). In such a case, for example, the SeNB monitors the activity of the UE in the SCG to determine a release of the SeNB resulting from an inactivity of the UE, and the SeNB may be released through a release procedure. Therefore, for example, in order to achieve data offloading to the SeNB after that, a procedure for adding the SeNB is required. That is, an unnecessary operation due to the release of the SeNB (procedure for adding the SeNB) may occur.

[0009] Furthermore, for example, the SeNB may perform, more than necessary, a monitoring of the activity of the UE in the SCG, determination of the release of the SeNB based on a result of the monitoring, and/or signalling to the MeNB (e.g., a report of the result of the monitoring or a request of the release to the MeNB). That is, an unnecessary operation (excessive operation) may occur.

[0010] An example object of the present invention is to provide an apparatus and a method which make it possible to suppress occurrence of an unnecessary operation in a case of the SCG bearer.

[Solution to Problem]



[0011] The invention is defined by the appended claims.

[0012] A base station according to a first aspect of the present invention communicates with a terminal apparatus over a Master Cell Group, MCG, bearer for dual connectivity of the terminal apparatus, and comprises a transmitter configured to transmit a first message to a secondary base station which is configured to communicate with the terminal apparatus over a Secondary Cell Group, SCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE, and an information element which indicates a request for the secondary base station to report activity-related information related to an activity of the terminal apparatus in a Secondary Cell Group, SCG, of the secondary base station; and a receiver configured to receive the activity-related information transmitted by the secondary base station, wherein the first message is transmitted and a second message is received in a first procedure, the second message being an acknowledge message which corresponds to the first message, wherein the activity-related information included in a third message is received in a second procedure, and wherein the activity-related information indicates whether the terminal apparatus is inactive or not.

[0013] A secondary base station according to a second aspect of the present invention communicates with a terminal apparatus over a Secondary Cell Group, SCG, bearer for dual connectivity of the terminal apparatus, and comprises a receiver configured to receive a first message from a master base station which is configured to communicate with the terminal apparatus over a Master Cell Group, MCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE, and an information element which indicates a request to report activity-related information related to an activity of the terminal apparatus in a Secondary Cell Group, SCG, of the secondary base station; and a transmitter configured to transmit the activity-related information related to the master base station, wherein the first message is received and a second message is transmitted in a first procedure, the second message being an acknowledge message which corresponds to the first message, and wherein the activity-related information included in a third message is received in a second procedure, and wherein the activity-related information indicates whether the terminal apparatus is inactive or not.

[0014] A first method according to a third aspect of the present invention comprises communicating with a terminal apparatus over a Master Cell Group, MCG, bearer for dual connectivity, transmitting a first message to a secondary base station which communicates with the terminal apparatus over a Secondary Cell Group, SCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE, and an information element which indicates a request for the secondary base station to report activity-related information related to an activity of the terminal apparatus in a Secondary Cell Group, SCG, of the secondary base station; and receiving the activity-related information transmitted by the secondary base station, wherein the first message is transmitted and a second message is received in a first procedure, the second message being an acknowledge message which corresponds to the first message, and wherein the activity-related information included in a third message is received in a second procedure, and wherein the activity-related information indicates whether the terminal apparatus is inactive or not.

[0015] A second method according to a fourth aspect of the present invention comprises communicating with a terminal apparatus over a Secondary Cell Group, SCG, bearer for dual connectivity, receiving a first message from a master base station which communicates with the terminal apparatus over a Master Cell Group, MCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE, and an information element which indicates a request to report activity-related information related to an activity of the terminal apparatus in a Secondary Cell Group, SCG, of the secondary base station, and transmitting the activity-related information to the master base station, wherein the first message is received and a second message is transmitted in a first procedure, the second message being an acknowledge message which corresponds to the first message, and wherein the activity-related information included in a third message is received in a second procedure, and wherein the activity-related information indicates whether the terminal apparatus is inactive or not.

[Advantageous Effects of Invention]



[0016] According to the present invention, it is possible to suppress occurrence of an unnecessary operation in a case of an SCG bearer. It is noted that with the present invention, instead of the above effect, or together with the above effect, other effects may be achieved.

[Brief Description of the Drawings]



[0017] 

Fig. 1 is an explanatory diagram illustrating an example of a schematic configuration of a system according to an example embodiment of the present invention.

Fig. 2 is an explanatory diagram for explaining an example of a first architecture of a user plane in dual connectivity.

Fig. 3 is an explanatory diagram for explaining an example of a second architecture of the user plane in the dual connectivity.

Fig. 4 is a block diagram illustrating an example of a schematic configuration of a first base station according to a first example embodiment.

Fig. 5 is a block diagram illustrating an example of a schematic configuration of a second base station according to the first example embodiment.

Fig. 6 is an explanatory diagram for explaining an example of User Inactivity Status.

Fig. 7 is an explanatory diagram for explaining an example of Report Characteristics Type.

Fig. 8 is an explanatory diagram for explaining an example of Periodic IE.

Fig. 9 is an explanatory diagram for explaining an example of Event Trigger IE.

Fig. 10 is a sequence diagram illustrating a first example of a schematic flow of request and report processing according to the first example embodiment.

Fig. 11 is a sequence diagram illustrating a second example of the schematic flow of the request and report processing according to the first example embodiment.

Fig. 12 is a sequence diagram illustrating a third example of the schematic flow of the request and report processing according to the first example embodiment.

Fig. 13 is an explanatory diagram for explaining an example of a request message for requesting a report of activity-related information.

Fig. 14 is an explanatory diagram for explaining another example of the request message for requesting the report of the activity-related information.

Fig. 15 is an explanatory diagram for explaining an example of a UE ASSOCIATED INFORMATION REQUEST message.

Fig. 16 is an explanatory diagram for explaining an example of a report message including the activity-related information.

Fig. 17 is an explanatory diagram for explaining an example of a UE ASSOCIATED INFORMATION REPORT message.

Fig. 18 is an explanatory diagram for explaining an example of a response message on success.

Fig. 19 is an explanatory diagram for explaining an example of a UE ASSOCIATED INFORMATION RESPONSE message.

Fig. 20 is an explanatory diagram for explaining an example of a UE ASSOCIATED INFORMATION FAILURE message.

Fig. 21 is an explanatory diagram for explaining an example of a handover according to a second modification of the first example embodiment.

Fig. 22 is a sequence diagram illustrating an example of a schematic flow of handover processing according to the second modification of the first example embodiment.

Fig. 23 is a block diagram illustrating an example of a schematic configuration of a first base station according to a second example embodiment.

Fig. 24 is a block diagram illustrating an example of a schematic configuration of a second base station according to the second example embodiment.

Fig. 25 is a sequence diagram illustrating an example of a schematic flow of request and report processing according to the second example embodiment.


[Description of Embodiments]



[0018] With reference to the accompanying drawings, example embodiments of the present invention will be described in detail, below. It is noted that in the specification and the drawings, like reference numerals may be assigned to like elements that can be similarly described to avoid a duplicated description.

[0019] The present invention will be described in the following order.
  1. 1. Overview of example embodiment of present invention
  2. 2. Configuration example of system
  3. 3. First example embodiment

    3.1. Configuration example of first base station

    3.2. Configuration example of second base station

    3.3. Technical feature

    3.4. First modification

    3.5. Second modification

  4. 4. Second example embodiment

    4.1. Configuration example of first base station

    4.2. Configuration example of second base station

    4.3. Technical feature


<< 1. Overview of example embodiment of present invention >>



[0020] First, an overview of an example embodiment of the present invention will be described.

(1) Technical problem



[0021] In 3GPP Release 12, dual connectivity is introduced. In a case of a split bearer of the dual connectivity, data transmitted in an SCG (i.e., a group of serving cells related to an SeNB) passes through an MeNB, and thus, the MeNB can monitor an activity of a UE. On the other hand, in a case of an SCG bearer of the dual connectivity, the data transmitted in the SCG does not pass through the MeNB, and thus, the MeNB can not directly monitor the activity of the UE and relies upon the monitoring by the SeNB.

[0022] However, in a case of the SCG bearer, control related to the activity of the UE may be distributed between the MeNB and the SeNB. As a result, an unnecessary operation may occur, for example.

[0023] For example, there is a case where data of the UE is not transmitted in the SCG, but the data of the UE is transmitted in an MCG (i.e., a group of serving cells related to the MeNB). In such a case, for example, the SeNB monitors the activity of the UE in the SCG to determine a release of the SeNB resulting from an inactivity of the UE, and the SeNB may be released through a release procedure. Therefore, for example, in order to achieve data offloading to the SeNB after that, a procedure for adding the SeNB is required. That is, an unnecessary operation due to the release of the SeNB (procedure for adding the SeNB) may occur.

[0024] Furthermore, for example, the SeNB may perform, more than necessary, a monitoring of the activity of the UE in the SCG, determination of the release of the SeNB based on a result of the monitoring, and/or signalling to the MeNB (e.g., a report of the result of the monitoring or a request of the release to the MeNB). That is, an unnecessary operation (excessive operation) may occur.

(2) Technical feature



[0025] In an example embodiment of the present invention, in order to solve the above technical problem, for example, the MeNB requests the SeNB to report activity-related information (information indicating that the UE is inactive, for example) on the activity of the UE in the SCG of the SeNB. The SeNB reports, in response to the request from the MeNB, the activity-related information to the MeNB. Then, the MeNB acquires the activity-related information.

[0026] As a result, for example, the control related to the activity of the UE is concentrated on the MeNB, and therefore, occurrence of an unnecessary operation may be suppressed in the case of the SCG bearer.

<< 2. Configuration example of system >>



[0027] With reference to Fig. 1 to Fig. 3, an example of a schematic configuration of a system 1 according to the example embodiment of the present invention will be described. Fig. 1 is an explanatory diagram illustrating the example of the schematic configuration of the system 1 according to the example embodiment of the present invention. With reference to Fig. 1, the system 1 includes a control entity 30, a gateway 40, a terminal apparatus 60, a first base station 100, and a second base station 200. The control entity 30, the gateway 40, the first base station 100, and the second base station 200 perform communication via a network 50. For example, the network 50 includes a backhaul and a core network.

[0028] For example, the system 1 may be a system that conforms to the standard of Third Generation Partnership Project (3GPP). More specifically, for example, the system 1 may be a system that conforms to Long Term Evolution (LTE)/LTE-Advanced, and/or System Architecture Evolution (SAE).

(1) Control entity 30



[0029] The control entity 30 is a core network node, and performs control related to mobility of a terminal apparatus (e.g., the terminal apparatus 60). For example, the control entity 30 is a Mobility Management Entity (MME).

(2) Gateway 40



[0030] The gateway 40 is a core network node, and forwards data to a base station and that therefrom. For example, the gateway 40 is a Serving Gateway (S-GW).

(3) terminal apparatus 60



[0031] The terminal apparatus 60 performs radio communication with the base station. For example, when located within a coverage area 10 of the first base station 100, the terminal apparatus 60 performs radio communication with the first base station 100. Furthermore, for example, when located within a coverage area 20 of the second base station 200, the terminal apparatus 60 performs radio communication with the second base station 200. For example, the terminal apparatus 60 is a User Equipment (UE).

(4) First base station 100/Second base station 200



[0032] The first base station 100 is a node of a radio access network (RAN), and performs radio communication with a terminal apparatus (e.g., the terminal apparatus 60) located within the coverage area 10. The second base station 200 also is a node of the RAN, and performs radio communication with a terminal apparatus (e.g., the terminal apparatus 60) located within the coverage area 20. For example, the first base station 100 and the second base station 200 are an eNB.

[0033] For example, the coverage area 10 is a macro cell, and the first base station 100 is a base station of the macro cell. For example, the coverage area 20 is a small cell smaller than the macro cell, and the second base station 200 is a base station of the small cell.

(5) Dual connectivity



[0034] In particular, the terminal apparatus 60 supports the dual connectivity. That is, the terminal apparatus 60 is capable of being simultaneously connected to two base stations (e.g., the first base station 100 and the second base station 200), and capable of simultaneously performing radio communication with the two base stations (e.g., the first base station 100 and the second base station 200).

[0035] Furthermore, the first base station 100 and the second base station 200 also support the dual connectivity. For example, the first base station 100 operates as a master base station in the dual connectivity, and the second base station 200 operates as a secondary base station in the dual connectivity. The master base station is a base station having an interface with the control entity 30 (base station configured to terminate the interface with the control entity 30) in the dual connectivity, and is an MeNB, for example. The secondary base station is a base station configured to provide an additional radio resource to the terminal apparatus in the dual connectivity, and is an SeNB, for example.

(a) Control plane



[0036] In the dual connectivity, as for a control plane, an interface (e.g., an S1-MME) is provided between the master base station (e.g., the MeNB) and the control entity 30 (e.g., the MME). However, in the dual connectivity, the interface (e.g., the S1-MME) is not provided between the secondary base station (e.g., the SeNB) and the control entity 30. As a result, control information on the dual connectivity is transmitted and received between the master base station and the control entity 30.

(b) User plane



[0037] Meanwhile, a user plane has two different architectures. With reference to Fig. 2 and Fig. 3, the two different architectures will be described, below.

[0038] Fig. 2 is an explanatory diagram for explaining an example of a first architecture of the user plane in the dual connectivity. With reference to Fig. 2, the control entity 30, the gateway 40, the terminal apparatus 60, the first base station 100, and the second base station 200 are illustrated. Here, in the dual connectivity of the terminal apparatus 60, the first base station 100 operates as a master base station, and the second base station 200 operates as a secondary base station. In the first architecture, an interface (e.g., an S1-U) is provided between the master base station (first base station 100) and the gateway 40. However, the interface (e.g., the S1-U) is not provided between the secondary base station (second base station 200) and the gateway 40. Therefore, user plane data is not directly transmitted from the gateway 40 to the secondary base station (second base station 200), but transmitted, via the master base station (first base station 100), to the secondary base station (second base station 200). In such a first architecture, there is a bearer whose radio protocols are located in both the master base station (first base station 100) and the secondary base station (second base station 200) to use resources of both the master base station (first base station 100) and the secondary base station (second base station 200). In this case, the bearer is referred to as a split bearer.

[0039] Fig. 3 is an explanatory diagram for explaining an example of a second architecture of the user plane in the dual connectivity. With reference to Fig. 3, the control entity 30, the gateway 40, the terminal apparatus 60, the first base station 100, and the second base station 200 are illustrated. Here, in the dual connectivity of the terminal apparatus 60, the first base station 100 operates as a master base station, and the second base station 200 operates as a secondary base station. In the second architecture, an interface (e.g., the S1-U) is provided between the master base station (first base station 100) and the gateway 40, and the interface (e.g., the S1-U) is also provided between the secondary base station (second base station 200) and the gateway 40. Therefore, the user plane data is directly transmitted and received between the gateway 40 and the secondary base station (second base station 200), without passing through the master base station (first base station 100). In such a second architecture, there is a bearer whose radio protocols are located in the secondary base station (second base station 200) to use resources of the secondary base station (second base station 200). In this case, the bearer is referred to as a Secondary Cell Group (SCG) bearer.

<< 3. First example embodiment >>



[0040] Subsequently, with reference to Fig. 4 to Fig. 22, a first example embodiment of the present invention will be described.

<3.1. Configuration example of first base station>



[0041] First, with reference to Fig. 4, an example of a configuration of the first base station 100 according to the first example embodiment will be described. Fig. 4 is a block diagram illustrating an example of a schematic configuration of the first base station 100 according to the first example embodiment. With reference to Fig. 4, the first base station 100 includes a radio communication unit 110, a network communication unit 120, a storage unit 130, and a processing unit 140.

[0042] The radio communication unit 110 transmits and receives a signal by radio. For example, the radio communication unit 110 receives a signal from a terminal apparatus and transmits a signal to the terminal apparatus.

[0043] The network communication unit 120 receives a signal from a backhaul, and transmits a signal to the backhaul.

[0044] The storage unit 130 temporarily or permanently stores a program, a parameter, and various data for an operation of the first base station 100.

[0045] The processing unit 140 provides various functions of the first base station 100. The processing unit 140 includes a communication processing unit 141, a request unit 143, an information acquisition unit 145, and a control unit 147. It is noted that the processing unit 140 may further include other constituent components other than these constituent components. That is, the processing unit 140 may also perform an operation other than the operations of these constituent components.

[0046] Specific operations of the communication processing unit 141, the request unit 143, the information acquisition unit 145, and the control unit 147 will be described in detail later.

[0047] The radio communication unit 110 may include an antenna and a radio frequency (RF) circuit, for example. The network communication unit 120 may include a network adapter or a network interface card, for example. The storage unit 130 may include a memory (e.g., a nonvolatile memory and/or a volatile memory), and/or a hard disk, for example. The processing unit 140 may include a baseband (BB) processor and/or other processors, for example.

<3.2. Configuration example of second base station>



[0048] Next, with reference to Fig. 5, an example of a configuration of the second base station 200 according to the first example embodiment will be described. Fig. 5 is a block diagram illustrating an example of a schematic configuration of the second base station 200 according to the first example embodiment. With reference to Fig. 5, the second base station 200 includes a radio communication unit 210, a network communication unit 220, a storage unit 230, and a processing unit 240.

[0049] The radio communication unit 210 transmits and receives a signal by radio. For example, the radio communication unit 210 receives a signal from a terminal apparatus and transmits a signal to the terminal apparatus.

[0050] The network communication unit 220 receives a signal from a backhaul, and transmits a signal to the backhaul.

[0051] The storage unit 230 temporarily or permanently stores a program, a parameter, and various data for an operation of the second base station 200.

[0052] The processing unit 240 provides various functions of the second base station 200. The processing unit 240 includes a communication processing unit 241 and a reporting unit 243. It is noted that the processing unit 240 may further include other constituent components other than these constituent components. That is, the processing unit 240 may perform an operation other than the operations of these constituent components.

[0053] Specific operations of the communication processing unit 241 and the reporting unit 243 will be described in detail later.

[0054] The radio communication unit 210 may include an antenna and a radio frequency (RF) circuit, for example. The network communication unit 220 may include a network adapter or a network interface card, for example. The storage unit 230 may include a memory (e.g., a nonvolatile memory and/or a volatile memory), and/or a hard disk, for example. The processing unit 240 may include a baseband (BB) processor and/or other processors, for example.

<3.3. Technical feature>



[0055] Next, with reference to Fig. 6 to Fig. 20, a technical feature according to the first example embodiment will be described.

(1) Dual connectivity (case of SCG bearer)



[0056] For example, the first base station 100 operates as a master base station in dual connectivity of the terminal apparatus 60, and the second base station 200 operates as a secondary base station in the dual connectivity of the terminal apparatus 60. In this case, the first base station 100 (communication processing unit 141) communicates with the terminal apparatus 60 over an MCG bearer for the dual connectivity of the terminal apparatus 60, and the second base station 200 (communication processing unit 241) communicates with the terminal apparatus 60 over an SCG bearer for the dual connectivity.

[0057] For example, the communication processing unit 141 and the communication processing unit 241 perform signal processing of a PDCP layer, an RLC layer, a MAC layer, and/or a physical layer.

[0058] It is noted that the MCG bearer is a bearer whose radio protocols are located in the master base station (first base station 100) to use resources of the master base station (first base station 100). Furthermore, the SCG bearer is a bearer whose radio protocols are located in the secondary base station (second base station 200) to use resources of the secondary base station (second base station 200).

(2) Report of activity-related information


(a) Request for report



[0059] The first base station 100 (request unit 143) requests the secondary base station (second base station 200), which communicates with the terminal apparatus 60 over the SCG bearer for the dual connectivity, to report activity-related information related to an activity of the terminal apparatus 60 in the SCG of the secondary base station.

[0060] For example, the first base station 100 (request unit 143) transmits a message for requesting a report of the activity-related information, to the secondary base station (second base station 200). For example, the message includes Report Characteristics, and the Report Characteristics indicates that the first base station 100 requests a feedback (i.e., a report of the activity-related information). For example, more strictly, Report Characteristics IE indicates that the first base station 100 requests a feedback from the second base station 200 when a condition provided in type information (e.g., Report Characteristics Type IE) described later is satisfied. The first base station 100 may include such Report Characteristics IE, into the message.

[0061] As an example, the first base station 100 (request unit 143) transmits an SENB ADDITION REQUEST message for requesting a report of the activity-related information, to the secondary base station (second base station 200). Alternatively, the first base station 100 (request unit 143) may transmit an SENB MODIFICATION REQUEST message for requesting a report of the activity-related information, to the secondary base station (second base station 200). By using such an existing message as described above, for example, it is possible to request a report in an existing procedure.

[0062] As another example, the first base station 100 (request unit 143) may transmit a UE-ASSOCIATED INFORMATION REQUEST message for requesting a report of the activity-related information, to the secondary base station. By using such a new message as described above, it is possible to request a report more flexibly (e.g., at a freer timing), for example.

[0063] As described above, the first base station 100 (request unit 143) requests the secondary base station (second base station 200) to report the activity-related information. As a result, the secondary base station (second base station 200) does not need to monitor and report, more than necessary, the activity of the terminal apparatus 60 in the SCG, for example. Therefore, it may be possible to suppress occurrence of an unnecessary operation in the case of the SCG bearer.

[0064] It is noted that, for example, the message for requesting a report of the activity-related information is a message dedicated to the terminal apparatus 60 (i.e., a message for each terminal apparatus). Alternatively, the message for requesting a report of the activity-related information may be a message common to a plurality of terminal apparatuses including the terminal apparatus 60. In this case, the message may include IDs of the plurality of terminal apparatuses. Each of the IDs may be a temporary ID (e.g., a Temporary Mobile Subscriber Identity (TMSI) or a Cell Radio Network Temporary Identifier (CRNTI)), or may be a permanent ID (e.g., an International Mobile Subscriber Identity (IMSI) or an International Mobile Equipment Identity (IMEI)).

(b) Reporting



[0065] The second base station 200 (reporting unit 243) reports the activity-related information to the master base station (first base station 100), which communicates with the terminal apparatus 60 on the MCG bearer of the dual connectivity, in response to a request from the master base station (first base station 100). Then, the first base station 100 (information acquisition unit 145) acquires the activity-related information reported by the secondary base station (second base station 200).

[0066] For example, when the Report Characteristics IE is included in a message (e.g., SENB ADDITION REQUEST, SENB MODIFICATION REQUEST, or UE-ASSOCIATED INFORMATION REQUEST) from the first base station 100, the second base station 200 may perform reporting (for example, when a condition indicated in type information described later (e.g., the Report Characteristics Type IE) is satisfied).

- Transmission of message



[0067] For example, the second base station 200 (reporting unit 243) transmits a message including the activity-related information to the master base station (first base station 100).

[0068] As an example, the second base station 200 (reporting unit 243) transmits an SENB MODIFICATION REQUIRED message including the activity-related information to the master base station (first base station 100). By using such an existing message as described above, for example, it is possible to perform reporting in an existing procedure.

[0069] As another example, the second base station 200 (reporting unit 243) may transmit a UE ASSOCIATED INFORMATION REPORT message including the activity-related information to the master base station (first base station 100). By using such a new message as described above, for example, it is possible to perform reporting more flexibly (e.g., at a freer timing).

- Reporting timing



[0070] As a first example, the second base station 200 (the secondary base station) reports the activity-related information to the master base station (first base station 100) after the request of the report from the first base station 100 (the master base station). Such a report may be referred to as an on-demand report.

[0071] As a second example, the second base station 200 (the secondary base station) periodically reports the activity-related information to the master base station (first base station 100). Such a report may be referred to as a periodic report.

[0072] As a third example, the second base station 200 (the secondary base station) reports the activity-related information to the master base station (first base station 100), when detecting an inactivity of the terminal apparatus 60 in the SCG (e.g., if there is no data communication of the terminal apparatus 60 in the SCG until an inactivity timer of the terminal apparatus 60 expires). Such a report may be referred to as an event trigger report.

[0073] As described above, the second base station 200 (reporting unit 243) reports the activity-related information, and the first base station 100 (information acquisition unit 145) acquires the activity-related information. As a result, for example, the master base station (first base station 100) can know the activity of the terminal apparatus 60 in the SCG, and can determine, in consideration of the activity of the terminal apparatus 60 in both the MCG and the SCG, whether to release the secondary base station (second base station 200). Thus, for example, even when the terminal apparatus 60 is inactive in the SCG, the secondary base station may not be released if the terminal apparatus 60 is active in the MCG and therefore the secondary base station is still needed. Thus, occurrence of an unnecessary operation (e.g., a procedure for adding the secondary base station) may be suppressed.

(c) Activity-related information


- Content



[0074] For example, the activity-related information is information indicating whether the terminal apparatus 60 is active or inactive in an SCG. Alternatively, the activity-related information may simply be information indicating that the terminal apparatus 60 is inactive in an SCG.

[0075] For example, the activity-related information is User Inactivity Status. Specifically, for example, the User Inactivity Status is defined as shown in Fig. 6.

[0076] With such information, for example, the master base station (first base station 100) can know the activity of the terminal apparatus 60 even in the case of the SCG bearer.

- Generation



[0077] The second base station 200 (the secondary base station) monitors the activity of the terminal apparatus 60 in the SCG (e.g., data communication of the terminal apparatus 60 in the SCG). Then, the second base station 200 (the secondary base station) generates the activity-related information based on the monitoring result.

[0078]  For example, the second base station 200 (the secondary base station) monitors the activity of the terminal apparatus 60 in the SCG in response to a request for a report from the first base station 100 (the master base station). Specifically, for example, the second base station 200 may monitor the activity, when the Report Characteristics IE in a message from the first base station 100 includes the User Inactivity Status. Alternatively, the second base station 200 (the secondary base station) may voluntarily monitor the activity.

(d) Type information


- Provision of type information



[0079] For example, the first base station 100 (request unit 143) provides the secondary base station (second base station 200) with type information indicating a type of the report when requesting the secondary base station (second base station 200) to report the activity-related information.

[0080] For example, the type information indicates, as the type of the report, on demand, event trigger, or periodic.

[0081] For example, the type information is Report Characteristics Type. Specifically, for example, the Report Characteristics Type is defined as shown in Fig. 7 and includes "On Demand" IE, "Periodic" IE, and/or "Event Trigger" IE as an information element (IE). With such IEs, the Report Characteristics Type indicates the type of the report. Furthermore, for example, the "Periodic" IE is defined as shown in Fig. 8 and includes Report Periodicity Value as information indicating a period. Moreover, the "Event Trigger" IE is defined as shown in Fig. 9 and includes "User Inactivity" IE, "Arriving Data Rate" IE, and the like as information indicating an event of the report,. Thus, the type information may also indicate a report condition (in other words, the type information may also include information indicating the report condition).

- Reporting based on type information



[0082] For example, the second base station 200 (reporting unit 243) reports the activity-related information to the master base station (first base station 100) based on the type information provided by the master base station (first base station 100). More specifically, for example, the second base station 200 (reporting unit 243) reports the activity-related information to the master base station (first base station 100) in accordance with the type of the report indicated by the type information.

[0083] With provision of the type information and the reporting based on the type information, for example, the master base station (first base station 100) can acquire the activity-related information at a desired timing.

(e) behaviour-related information


- Provision of behaviour-related information



[0084] For example, the first base station 100 (request unit 143) provides the secondary base station (second base station 200) with behaviour-associated information associated with a behaviour of the terminal apparatus 60 when requesting the secondary base station (second base station 200) to report the activity-related information. For example, the behaviour-related information is Expected UE Behaviour. The behaviour-related information is information provided by the control entity 30 to the first base station 100.

[0085] Thus, for example, the secondary base station (second base station 200) having no interface with the control entity 30 (e.g., the MME) also can acquire the behaviour-related information.

[0086] For example, the first base station 100 determines a value of an inactivity timer based on the behaviour-related information (e.g., the Expected UE Behaviour) acquired from the control entity 30, and sets the inactivity timer to the determined value. Furthermore, the first base station 100 (request unit 143) may provide the second base station 200 with timer information indicating the value of the inactivity timer (e.g., a User Inactivity Timer IE). Thus, for example, the first base station 100 and the second base station 200 can monitor the activity of the terminal apparatus 60 by using the same timer value.

- Reporting based on behaviour-related information



[0087] For example, the second base station 200 (reporting unit 243) reports the activity-related information to the master base station (first base station 100) based on the behaviour-related information. More specifically, for example, the second base station 200 (reporting unit 243) sets the inactivity timer of the terminal apparatus 60 to an appropriate value based on the behaviour-related information. Then, the second base station 200 (reporting unit 243) reports the activity-related information to the master base station (first base station 100) when there is no data communication of the terminal apparatus 60 in the SCG until the inactivity timer expires (or when there is a small amount of data communication). It is noted that needless to say, the second base station 200 (reporting unit 243) may perform the on-demand report and/or the periodic report, together with such an event trigger report (or instead of such an event trigger report).

[0088] Thus, for example, the secondary base station (second base station 200) can perform a more appropriate reporting.

[0089] It is noted that the second base station 200 (reporting unit 243) may provide the first base station 100 with the timer information indicating the value of the inactivity timer (determined by the second base station 200) (e.g., the User Inactivity Timer IE).

(f) Flow of processing



[0090] With reference to Fig. 10 to Fig. 12, request and report processing according to the first example embodiment will be described.

(f-1) First example



[0091] Fig. 10 is a sequence diagram illustrating a first example of a schematic flow of the request and report processing according to the first example embodiment.

[0092] The first base station 100 that is the MeNB transmits an SENB ADDITION REQUEST message to the second base station 200 that is the SeNB (S301). The SENB ADDITION REQUEST message includes the Report Characteristics (i.e., information indicating the reporting of the activity-related information). Thus, the first base station 100 requests the second base station 200 to report the activity-related information. Furthermore, the SENB ADDITION REQUEST message further includes the Report Characteristics Type (i.e., the type information) and the Expected UE Behaviour (i.e., the behaviour-related information). Furthermore, the SENB ADDITION REQUEST message may include User Inactivity Timer (i.e., timer information).

[0093] Then, the second base station 200 transmits an SENB ADDITION REQUEST ACKNOWLEDGMENT message to the first base station 100 (S303). The SENB ADDITION REQUEST ACKNOWLEDGMENT message may include the User Inactivity Timer (i.e., the timer information indicating the value of the inactivity timer determined by the second base station 200).

[0094] Thereafter, a reconfiguration (S305-S309) for adding the SeNB (i.e., the second base station 200) and a random access procedure (S311) are performed. Furthermore, if necessary, a data forwarding (S313, S315) and/or a path update procedure (S320) are performed.

[0095] The second base station 200 transmits an SENB MODIFICATION REQUIRED message to the first base station 100 (S331). The SENB MODIFICATION REQUIRED message includes the User Inactivity Status (i.e., the activity-related information). Thus, the second base station 200 reports the activity-related information to the first base station 100. It is noted that needless to say, the second base station 200 monitors the activity of the terminal apparatus 60 in the SCG, and generates the activity-related information based on the monitoring result. The SENB MODIFICATION REQUIRED message may further include the User Inactivity Timer (i.e., the timer information indicating the value of the inactivity timer determined by the second base station 200).

[0096] The first base station 100 receives the SENB MODIFICATION REQUIRED message and acquires the User Inactivity Status (i.e., the activity-related information). The first base station 100 may then transmit an SENB MODIFICATION CONFIRM message to the second base station 200.

[0097] It is noted that when receiving the SENB MODIFICATION REQUIRED message including a User Inactivity Status IE (i.e., the activity-related information), the first base station 100 may use the message to determine and perform any particular operation. For example, in response to the reception of the SENB MODIFICATION REQUIRED message, the first base station 100 may perform a reconfiguration for an efficient operation in the dual connectivity related to the terminal apparatus 60 (UE).

(f-2) Second example



[0098] Fig. 11 is a sequence diagram illustrating a second example of the schematic flow of the request and report processing according to the first example embodiment.

[0099] The first base station 100 that is the MeNB transmits an SENB MODIFICATION REQUEST message to the second base station 200 that is the SeNB (S341). The SENB MODIFICATION REQUEST message includes the Report Characteristics (i.e., the information indicating the reporting of the activity-related information). Thus, the first base station 100 requests the second base station 200 to report the activity-related information related to the activity. Furthermore, the SENB MODIFICATION REQUEST message further includes the Report Characteristics Type (i.e., the type information) and the Expected UE Behaviour (i.e., the behaviour-related information). Furthermore, the SENB MODIFICATION REQUEST message may include the User Inactivity Timer (i.e., the timer information).

[0100] Then, the second base station 200 transmits an SENB MODIFICATION REQUEST ACKNOWLEDGMENT message to the first base station 100 (S343). The SENB MODIFICATION REQUEST ACKNOWLEDGMENT message may include the User Inactivity Timer (i.e., the timer information indicating the value of the inactivity timer determined by the second base station 200).

[0101] Thereafter, a reconfiguration (S345-S349) and a random access procedure (S351) related to the SeNB (i.e., the second base station 200) are performed. Furthermore, if necessary, a data forwarding (S353, S355) and/or a path update procedure (S360) are performed.

[0102] The second base station 200 transmits an SENB MODIFICATION REQUIRED message to the first base station 100 (S371). The SENB MODIFICATION REQUIRED message includes the User Inactivity Status (i.e., the activity-related information). Thus, the second base station 200 reports the activity-related information to the first base station 100. It is noted that needless to say, the second base station 200 monitors the activity of the terminal apparatus 60 in the SCG, and generates the activity-related information based on the monitoring result. The SENB MODIFICATION REQUIRED message may further include the User Inactivity Timer (i.e., the timer information indicating the value of the inactivity timer determined by the second base station 200).

[0103] The first base station 100 receives the SENB MODIFICATION REQUIRED message and acquires the User Inactivity Status (i.e., the activity-related information). The first base station 100 may then transmit an SENB MODIFICATION CONFIRM message to the second base station 200.

[0104] It is noted that when receiving the SENB MODIFICATION REQUIRED message including the User Inactivity Status IE (i.e., the activity-related information), the first base station 100 may use the message to determine and perform any particular operation. For example, in response to the reception of the SENB MODIFICATION REQUIRED message, the first base station 100 may perform a reconfiguration for an efficient operation in the dual connectivity related to the terminal apparatus 60 (UE).

(f-3) Third example



[0105] Fig. 12 is a sequence diagram illustrating a third example of the schematic flow of the request and report processing according to the first example embodiment. This procedure uses a UE-associated signalling.

[0106] The first base station 100 that is the MeNB transmits a UE ASSOCIATED INFORMATION REQUEST message to the second base station 200 that is the SeNB (S381). The UE ASSOCIATED INFORMATION REQUEST message includes the Report Characteristics (i.e., the information indicating the reporting of the activity-related information). Thus, the first base station 100 requests the second base station 200 to report the activity-related information related to the activity. Furthermore, the UE ASSOCIATED INFORMATION REQUEST message further includes the Report Characteristics Type (i.e., the type information) and the Expected UE Behaviour (i.e., the behaviour-related information). Furthermore, the UE ASSOCIATED INFORMATION REQUEST message may include the User Inactivity Timer (i.e., the timer information).

[0107] In response to the reception of the UE ASSOCIATED INFORMATION REQUEST message, the second base station 200 may perform measurement as requested by the first base station 100. Furthermore, the second base station 200 transmits a UE ASSOCIATED INFORMATION RESPONSE message to the first base station 100 (S383). The UE ASSOCIATED INFORMATION RESPONSE message may include the User Inactivity Timer (i.e., the timer information indicating the value of the inactivity timer determined by the second base station 200).

[0108] Thereafter, the second base station 200 transmits a UE ASSOCIATED INFORMATION REPORT message to the first base station 100 (S385). The UE ASSOCIATED INFORMATION REPORT message includes the User Inactivity Status (i.e., the activity-related information). Thus, the second base station 200 reports the activity-related information to the first base station 100. Needless to say, the second base station 200 monitors the activity of the terminal apparatus 60 in the SCG, and generates the activity-related information based on the monitoring result. The UE ASSOCIATED INFORMATION REPORT message may further include the User Inactivity Timer (i.e., the timer information indicating the value of the inactivity timer determined by the second base station 200).

[0109] The first base station 100 receives the UE ASSOCIATED INFORMATION REPORT message and acquires the User Inactivity Status (i.e., the activity-related information).

[0110] It is noted that when receiving the UE ASSOCIATED INFORMATION REPORT message including the User Inactivity Status IE (i.e., the activity-related information), the first base station 100 may use the message to determine any particular operation. For example, in response to the reception of the UE ASSOCIATED INFORMATION REPORT message, the first base station 100 may perform a reconfiguration for an efficient operation in the dual connectivity related to the terminal apparatus 60 (UE).

- Unsuccessful operation



[0111] If it is not possible to start, in the second base station 200, the measurement requested as indicated in the Report Characteristics IE, the second base station 200 may transmit a UE ASSOCIATED INFORMATION FAILURE message (instead of the UE ASSOCIATED INFORMATION RESPONSE message). The message may include Cause IE to which an appropriate value is set.

[0112] Furthermore, if the second base station 200 cannot achieve a combination of the measurements requested as indicated in the Report Characteristics IE and the Report Characteristics Type IE, the second base station 200 may use the UE ASSOCIATED INFORMATION FAILURE message to reject the UE ASSOCIATED INFORMATION REQUEST. The message may include Cause IE to which an appropriate value is set.

[0113] The Cause IE may include Radio Network Layer Cause IE, and the Radio Network Layer Cause IE may be set to Requested Report Characteristic not Supported. The Requested Report Characteristic not Supported may mean that the requested Report Characteristics are not supported by a transmission node.

[0114] For example, if the second base station 200 fails to start the requested measurement, the UE ASSOCIATED INFORMATION FAILURE message is transmitted, for UE-associated information, to the first base station 100 by the second base station 200.

(g) Information included in message


(g-1) Request message



[0115] The SENB ADDITION REQUEST, the SENB MODIFICATION REQUEST, and the UE ASSOCIATED INFORMATION REQUEST described with reference to Fig. 10 to Fig. 12 are messages for requesting a report of the activity-related information, and include an information element (IE) as shown in Fig. 13, for example. That is, these messages include the Report Characteristics, the Report Characteristics Type, the Expected UE Behaviour (i.e., the behaviour-related information), and the User Inactivity Timer (i.e., the timer information).

[0116] The User Inactivity Timer has a value of any one of 0 to 255. It is noted that the User Inactivity Timer may mean Infinite or that the timer is not activated, when the value is a specific value (as an example, 0 or 255). The timer not being activated is equivalent to not monitoring the activity of the terminal apparatus 60.

[0117] It is noted that an example of Fig. 13 is an example of ENUMERATED where the Report Characteristics can designate only one object (e.g., the User Inactivity). Alternatively, the Report Characteristics may be, instead of the ENUMERATED, BITSTRING capable of designating a plurality of objects (e.g., the User Inactivity, and an Arriving data rate) as shown in Fig. 14. In this case, Report Characteristic Info may include the Report Characteristic type and the Expected UE Behaviour for each of the plurality of objects. With the use of the BITSTRING, for example, it is possible to request, by only one IE, a plurality of objects (e.g., the User Inactivity, and the Arriving data rate). As a result, the number of IEs may decrease.

[0118] As an example, the UE ASSOCIATED INFORMATION REQUEST message includes an information element (IE) as shown in Fig. 15. That is, the UE ASSOCIATED INFORMATION REQUEST further includes a Message Type, an MeNB UE X2AP ID, and an SeNB UE X2AP ID. It is noted that the Report Characteristics in the UE ASSOCIATED INFORMATION REQUEST message may be the BITSTRING as shown in Fig. 14, instead of the ENUMERATED.

[0119] It is noted that as described above, the first base station 100 can request, from the second base station 200, not only the report of the User Inactivity of the terminal apparatus 60, but also, for example, the report of the Arriving data rate of the terminal apparatus 60. Thus, for example, the first base station 100 can perform control not only on the data rate of the terminal apparatus 60 in the MCG but also on the data rate of the terminal apparatus 60 in the SCG. In particular, this is effective when an upper limit of the data rate of the terminal apparatus 60 is defined (by contract or the like).

(g-2) Report message



[0120] The SENB MODIFICATION REQUIRED and the UE ASSOCIATED INFORMATION REPORT described with reference to Fig. 10 to Fig. 12 are messages including the activity-related information, and for example, include an information element (IE) as shown in Fig. 16. That is, these messages include the User Inactivity Status (i.e., the activity-related information) and the User Inactivity Timer (i.e., the timer information).

[0121] As an example, the UE ASSOCIATED INFORMATION REPORT includes an information element (IE) as shown in Fig. 17. That is, the UE ASSOCIATED INFORMATION REPORT further includes the Message Type, the MeNB UE X2AP ID, and the SeNB UE X2AP ID.

(g-3) Response message (success)



[0122] The SENB ADDITION REQUEST ACKNOWLEDGMENT, the SENB MODIFICATION REQUEST ACKNOWLEDGEMENT, and the UE ASSOCIATED INFORMATION RESPONSE described with reference to Fig. 10 to Fig. 12 are messages including the timer information, and for example, include an information element as shown in Fig. 18. That is, these messages include the User Inactivity Timer (i.e., the timer information). It is noted that similarly, the SENB MODIFICATION REQUIRED message may also be a message including the timer information, and for example, may include the information element (IE) as shown in Fig. 18.

[0123] As an example, the UE ASSOCIATED INFORMATION RESPONSE includes an information element (IE) as shown in Fig. 19. That is, the UE ASSOCIATED INFORMATION RESPONSE further includes the Message Type, the MeNB UE X2AP ID, and the SeNB UE X2AP ID.

(g-4) Response message (failure)



[0124] As described above, instead of the UE ASSOCIATED INFORMATION RESPONSE described with reference to Fig. 12, the UE ASSOCIATED INFORMATION FAILURE message may be transmitted by the second base station 200. The UE ASSOCIATED INFORMATION FAILURE message includes, for example, an information element (IE) as shown in Fig. 20.

(3) Operation based on activity-related information



[0125] For example, in response to the report of the activity-related information by the second base station 200, a reconfiguration for an efficient operation in the dual connectivity related to the terminal apparatus 60 (UE) may be performed.

[0126] More specifically, for example, when a report message from the second base station 200 includes the User Inactivity Status IE (i.e., the activity-related information), the first base station 100 may perform the reconfiguration for an efficient operation in the dual connectivity related to the terminal apparatus 60 (UE).

(a) Release of secondary base station



[0127] For example, the first base station 100 (control unit 147) determines, based on the activity-related information, whether to release the secondary base station (second base station 200). As a result, for example, even in a case of the SCG bearer, control related to the activity of the terminal apparatus 60 is concentrated on the master base station.

[0128] Furthermore, for example, the first base station 100 (control unit 147) determines, further based on other activity-related information related to the activity of the terminal apparatus 60 in the MCG, whether to release the secondary base station (second base station 200). As a result, for example, even when the terminal apparatus 60 is inactive in the SCG, the secondary base station may not be released if the terminal apparatus 60 is active in the MCG and therefore the secondary base station is still needed. Thus, occurrence of an unnecessary operation (e.g., a procedure for adding the secondary base station) may be suppressed.

[0129]  For example, the first base station 100 (control unit 147) determines not to release the secondary base station (second base station 200) and maintains, without releasing, the secondary base station (second base station 200). Alternatively, the first base station 100 (control unit 147) determines to release the secondary base station (second base station 200) and releases the secondary base station (second base station 200) through an SeNB release procedure.

[0130] As an example, when the UE is inactive, the first base station 100 may start a release procedure (e.g., the SeNB Release Procedure) for the second base station 200.

(b) Release of terminal apparatus



[0131] The first base station 100 (control unit 147) may determine, based on the activity-related information (and other activity-related information related to the activity of the terminal apparatus 60 in the MCG), whether to release the terminal apparatus 60. Then, the first base station 100 (control unit 147) may request the control entity 30 to release the terminal apparatus 60, when determining to release the terminal apparatus 60. For example, when the terminal apparatus 60 is inactive in the SCG, (i.e., the activity-related information indicates that the terminal apparatus 60 is inactive in the SCG) and when the terminal apparatus 60 is inactive also in the MCG (i.e., the other activity-related information indicates that the terminal apparatus 60 is inactive in the MCG), the first base station 100 (control unit 147) requests the control entity 30 to release the terminal apparatus 60.

(c) Addition of bearer



[0132] The first base station 100 (control unit 147) may determine, based on the activity-related information, whether to further add a bearer related to the terminal apparatus 60 and the secondary base station (second base station 200). Then, the first base station 100 (control unit 147) determines to further add the bearer, and the bearer may be further added. The bearer may be a bearer between the gateway 40 and the terminal apparatus 60 (e.g., an E-RAB between the S-GW and the UE). Furthermore, the first base station 100 (control unit 147) may add the bearer through an SeNB Modification procedure.

<3.4. First modification>



[0133] Next, a first modification of the first example embodiment will be described.

[0134]  In the example described above, the second base station 200 (reporting unit 243) transmits the SENB MODIFICATION REQUIRED message or the UE ASSOCIATED INFORMATION REPORT message including the User Inactivity Status (i.e., the activity-related information), to the first base station 100. As a result, the second base station 200 (reporting unit 243) reports the activity-related information to the first base station 100.

[0135] Meanwhile, in the first modification of the first example embodiment, the second base station 200 (reporting unit 243) may transmit, to the first base station 100, an SENB RELEASE REQUIRED message including the Radio Network Layer Cause indicating the User Inactivity (i.e., the activity-associated information). As a result, the second base station 200 (reporting unit 243) may report the activity-related information to the first base station 100.

<3.5. Second modification>



[0136] Next, with reference to Fig. 21 and Fig. 22, a second modification of the first example embodiment will be described.

(1) Overview



[0137] In the second modification of the first example embodiment, a handover of the terminal apparatus 60 between master base stations is performed, and the secondary base station is maintained even after the handover. In such a case, information provided by the master base station to the secondary base station at the time of requesting the report of the activity-related information is transmitted from a source master base station to a target master base station. The information includes, for example, the Report Characteristics, the Report Characteristics Type, and the User Inactivity Timer. As a result, for example, even after the handover of the master base station, it may become easy to continue to report the activity-related information.

(2) Handover



[0138] Fig. 21 is an explanatory diagram for explaining an example of a handover according to the second modification of the first example embodiment. With reference to Fig. 21, first base stations 100A and 100B, the second base station 200, and the terminal apparatus 60 are illustrated. In this example, the terminal apparatus 60 has communicated with the first base station 100A and the second base station 200 in the dual connectivity, but the terminal apparatus 60 moves from a coverage area 10A to a coverage area 10B and a handover of the terminal apparatus 60 from the first base station 100A to the first base station 100B is performed. It is noted that the terminal apparatus 60 remains within a coverage area 20.

(3) Flow of processing



[0139] Fig. 22 is a sequence diagram illustrating an example of a schematic flow of handover processing according to the second modification of the first example embodiment.

[0140] The first base station 100A, which is the MeNB and a source eNB of the handover, transmits a HANDOVER REQUEST message to the first base station 100B which is a target eNB of the handover (S401). The HANDOVER REQUEST message includes the Report Characteristics (i.e., the information indicating the reporting of the activity-related information) and the Report Characteristics Type (i.e., the type information).

[0141] Thereafter, processing for the handover of the terminal apparatus 60 from the first base station 100A to the first base station 100B is performed (S403-437).

<< 4. Second example embodiment >>



[0142] Subsequently, with reference to Fig. 23 to Fig. 25, a second example embodiment of the present invention will be described.

<4.1. Configuration example of first base station>



[0143] First, with reference to Fig. 23, an example of a configuration of the first base station 100 according to the second example embodiment will be described. Fig. 23 is a block diagram illustrating an example of a schematic configuration of the first base station 100 according to the second example embodiment. With reference to Fig. 23, the first base station 100 includes a communication processing unit 151, a request unit 153, and an information acquisition unit 155.

[0144] Specific operations of the communication processing unit 151, the request unit 153, and the information acquisition unit 155 will be described in detail later.

[0145] The communication processing unit 151, the request unit 153, and the information acquisition unit 155 may be implemented by way of a baseband (BB) processor and/or other processors or the like.

<4.2. Configuration example of second base station>



[0146] First, with reference to Fig. 24, an example of a configuration of the second base station 200 according to the second example embodiment will be described. Fig. 24 is a block diagram illustrating an example of a schematic configuration of the second base station 200 according to the second example embodiment. With reference to Fig. 24, the second base station 200 includes a communication processing unit 251 and a reporting unit 253.

[0147] Specific operations of the communication processing unit 251 and the reporting unit 253 will be described in detail later.

[0148] The communication processing unit 251 and the reporting unit 253 may be implemented by way of a baseband (BB) processor and/or other processors or the like.

<4.3. Technical feature>



[0149] Next, with reference to Fig. 25, a technical feature according to the second example embodiment will be described.

(1) Dual connectivity (case of SCG bearer)



[0150] For example, the first base station 100 operates as a master base station in dual connectivity of the terminal apparatus 60, and the second base station 200 operates as a secondary base station in the dual connectivity of the terminal apparatus 60. In this case, the first base station 100 (communication processing unit 151) communicates with the terminal apparatus 60 over the MCG bearer for dual connectivity of the terminal apparatus 60, and the second base station 200 (communication processing unit 251) communicates with the terminal apparatus 60 over the SCG bearer for the dual connectivity.

[0151] For example, the communication processing unit 151 and the communication processing unit 251 perform signal processing of a PDCP layer, an RLC layer, a MAC layer, and/or a physical layer.

[0152] It is noted that the MCG bearer is a bearer whose radio protocols are located in the master base station (first base station 100) to use resources of the master base station (first base station 100). Furthermore, the SCG bearer is a bearer whose radio protocols are located in the secondary base station (second base station 200) to use resources of the secondary base station (second base station 200).

(2) Report of activity-related information


(a) Request for report



[0153] The first base station 100 (request unit 153) requests the secondary base station (second base station 200), which communicates with the terminal apparatus 60 over the SCG bearer for the dual connectivity, to report activity-related information related to the activity of the terminal apparatus 60 in the SCG of the secondary base station.

[0154] For example, the first base station 100 (request unit 153) transmits, to the secondary base station (second base station 200), a message for requesting a report of the activity-related information. For example, the message includes the Report Characteristics, and the Report Characteristics indicates the reporting of the activity-related information.

[0155] As described above, the first base station 100 (request unit 153) requests the secondary base station (second base station 200) to report the activity-related information. As a result, the secondary base station (second base station 200) does not need to monitor and report, more than necessary, the activity of the terminal apparatus 60 in the SCG, for example. Therefore, it may be possible to suppress occurrence of an unnecessary operation in the case of the SCG bearer.

(b) Reporting



[0156] The second base station 200 (reporting unit 253) reports the activity-associated information to the master base station (first base station 100), which communicates with the terminal apparatus 60 on the MCG bearer of the dual connectivity, in response to a request from the master base station (first base station 100). Then, the first base station 100 (information acquisition unit 155) acquires the activity-related information reported by the secondary base station (second base station 200).

- Transmission of message



[0157] For example, the second base station 200 (reporting unit 253) transmits a message including the activity-related information to the master base station (first base station 100).

- Reporting timing



[0158] As a first example, the second base station 200 (the secondary base station) reports the activity-associated information to the master base station (first base station 100) after the request of the report from the first base station 100 (the master base station).

[0159] As a second example, the second base station 200 (the secondary base station) periodically reports the activity-related information to the master base station (first base station 100).

[0160] As a third example, the second base station 200 (the secondary base station) reports the activity-related information to the master base station (first base station 100) when detecting an inactivity of the terminal apparatus 60 in the SCG (e.g., if there is no data communication of the terminal apparatus 60 in the SCG until an inactivity timer of the terminal apparatus 60 expires).

[0161] As described above, the second base station 200 (reporting unit 253) reports the activity-related information, and the first base station 100 (information acquisition unit 155) acquires the activity-related information. As a result, for example, the master base station (first base station 100) can know the activity of the terminal apparatus 60 in the SCG, and can determine, in consideration of the activity of the terminal apparatus 60 in both the MCG and the SCG, whether to release the secondary base station (second base station 200). Thus, for example, even when the terminal apparatus 60 is inactive in the SCG, the secondary base station may not be released if the terminal apparatus 60 is active in the MCG and therefore the secondary base station is still needed. Thus, occurrence of an unnecessary operation (e.g., a procedure for adding the secondary base station) may be suppressed.

(c) Activity-related information


- Content



[0162] For example, the activity-related information is information indicating whether the terminal apparatus 60 is active or inactive in an SCG. Alternatively, the activity-related information may simply be information indicating that the terminal apparatus 60 is inactive in an SCG.

[0163]  For example, the activity-related information is the User Inactivity Status. Specifically, for example, the User Inactivity Status is defined as shown in Fig. 6.

[0164] With such information, for example, the master base station (first base station 100) can know the activity of the terminal apparatus 60 even in the case of the SCG bearer.

- Generation



[0165] The second base station 200 (the secondary base station) monitors the activity of the terminal apparatus 60 in the SCG (e.g., data communication of the terminal apparatus 60 in the SCG). Then, the second base station 200 (the secondary base station) generates the activity-related information based on the monitoring result.

[0166] For example, the second base station 200 (the secondary base station) starts monitoring the activity of the terminal apparatus 60 in the SCG in response to a request for a report from the first base station 100 (the master base station). Alternatively, the second base station 200 (the secondary base station) may voluntarily start the monitoring.

(d) Flow of processing



[0167] With reference to Fig. 25, request and report processing according to the second example embodiment will be described. Fig. 25 is a sequence diagram illustrating an example of a schematic flow of the request and report processing according to the second example embodiment.

[0168] The first base station 100 (request unit 153) that is the master base station requests the second base station 200 that is the secondary base station to report the activity-related information related to the activity of the terminal apparatus 60 in the SCG of the second base station 200 (S501).

[0169] The second base station 200 (reporting unit 253) reports the activity-related information to the first base station 100 in response to the request from the first base station 100 (S503). Then, the first base station 100 (information acquiring unit 155) acquires the activity-related information reported by the second base station 200.

[0170]  The present invention is not limited to the example embodiments described above, and it is possible to carry out the implementation by modifying in various forms within the scope of the appended claims.

[0171] For example, each step in the processing described herein may not necessarily be performed in chronological manner according to the order described in the sequence diagram. For example, each step in the processing may be performed in an order different from the order described as a sequence diagram, or may be performed in parallel.

[0172] Furthermore, a module (e.g., a base station apparatus or a module for the base station apparatus) including the constituent components (e.g., the communication processing unit, the request unit, the information acquisition unit, the control unit, and/or the reporting unit) of the base station described herein may be provided. Furthermore, a method including the processing of the constituent components may be provided, and a program for causing a processor to execute the processing of the constituent components may be provided. Furthermore, a recording medium which records therein the program may be provided.

[Reference sign list]



[0173] 
1
System
10, 20
Coverage area
30
Control entity
40
Gateway
50
Network
60
Terminal apparatus
100
First base station
141, 151
Communication processing unit
143, 153
request unit
145, 155
Information acquisition unit
147
Control unit
200
Second base station
241, 251
Communication processing unit
243, 255
Reporting unit



Claims

1. A base station (100) which communicates with a terminal apparatus (60) over a Master Cell Group, MCG, bearer for dual connectivity comprising:

a transmitter configured to transmit a first message to a secondary base station (200) which is configured to communicate with the terminal apparatus (60) over a Secondary Cell Group, SCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE, and an information element which indicates a request for the secondary base station (200) to report activity-related information related to an activity of the terminal apparatus (60) in a Secondary Cell Group, SCG, of the secondary base station (200); and

a receiver configured to receive the activity-related information transmitted by the secondary base station (200),

wherein the first message is transmitted and a second message is received in a first procedure, the second message being an acknowledge message which corresponds to the first message,

wherein the activity-related information included in a third message is received in a second procedure, and

wherein the activity-related information indicates whether the terminal apparatus (60) is inactive or not.


 
2. The base station according to claim 1, wherein the activity-related information is transmitted when an inactivity of the terminal apparatus (60) is detected.
 
3. The base station according to one of claims 1 to 2, wherein the first message is at least one of a modification request message or an addition request message.
 
4. A secondary base station (200) which communicates with a terminal apparatus (60) over a Secondary Cell Group, SCG, bearer for dual connectivity comprising:

a receiver configured to receive a first message from a master base station (100) which is configured to communicate with the terminal apparatus (60) over a Master Cell Group, MCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE, and an information element which indicates a request to report activity-related information related to an activity of the terminal apparatus (60) in a Secondary Cell Group, SCG, of the secondary base station (200); and

a transmitter configured to transmit the activity-related information related to the master base station (100),

wherein the first message is received and a second message is transmitted in a first procedure, the second message being an acknowledge message which corresponds to the first message,

wherein the activity-related information included in a third message is received in a second procedure, and

wherein the activity-related information indicates whether the terminal apparatus (60) is inactive or not.


 
5. The base station (200) according to claim 4, wherein the activity-related information is transmitted when an inactivity of the terminal apparatus (60) is detected.
 
6. The base station (200) according to one of claims 4 to 5, wherein the first message is at least one of a modification request message or an addition request message.
 
7. A method for a base station (100), comprising:

communicating with a terminal apparatus (60) over a Master Cell Group, MCG, bearer for dual connectivity;

transmitting a first message to a secondary base station (200) which communicates with the terminal apparatus (60) over a Secondary Cell Group, SCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE, and an information element which indicates a request for the secondary base station (200) to report activity-related information related to an activity of the terminal apparatus (60) in a Secondary Cell Group, SCG, of the secondary base station (200); and

receiving the activity-related information transmitted by the secondary base station (200),

wherein the first message is transmitted and a second message is received in a first procedure, the second message being an acknowledge message which corresponds to the first message,

wherein the activity-related information included in a third message is received in a second procedure, and

wherein, the activity-related information indicates whether the terminal apparatus (60) is inactive or not.


 
8. A method for a secondary base station (200), comprising:

communicating with a terminal apparatus (60) over a Secondary Cell Group, SCG, bearer for dual connectivity;

receiving a first message from a master base station (100) which communicates with the terminal apparatus over a Master Cell Group, MCG, bearer for the dual connectivity, the first message including an inactivity timer, an Expected UE Behaviour IE and an information element which indicates a request to report activity-related information related to an activity of the terminal apparatus in a Secondary Cell Group, SCG, of the secondary base station; and

transmitting the activity-related information to the master base station,

wherein the first message is received and a second message is transmitted in a first procedure, the second message being an acknowledge message which corresponds to the first message,

wherein the activity-related information included in a third message is received in a second procedure, and

wherein, the activity-related information indicates whether the terminal apparatus (60) is inactive or not.


 


Ansprüche

1. Basisstation (100), die mit einem Endgerät (60) über einen MCG-, Master-Zellengruppe, Träger für Doppelkonnektivität kommuniziert, mit:

einem Sender, der dafür konfiguriert ist, eine erste Nachricht an eine sekundäre Basisstation (200) zu übertragen, die dafür konfiguriert ist, mit dem Endgerät (60) über einen SCG-, sekundäre Zellengruppe, Träger für die Doppelkonnektivität zu kommunizieren, wobei die erste Nachricht einen Inaktivitätszeitnehmer, ein Informationselement, IE, für ein erwartetes UE-Verhalten und ein Informationselement enthält, das eine Anforderung für die sekundäre Basisstation (200) anzeigt, aktivitätsbezogene Information zu melden, die mit einer Aktivität des Endgeräts (60) in einer sekundären Zellengruppe, SCG, der sekundären Basisstation (200) in Beziehung steht; und

einem Empfänger, der dafür konfiguriert ist, die durch die sekundäre Basisstation (200) übertragene aktivitätsbezogene Information zu empfangen,

wobei die erste Nachricht in einer ersten Prozedur übertragen wird und eine zweite Nachricht in der ersten Prozedur empfangen wird, wobei die zweite Nachricht eine der ersten Nachricht entsprechende Bestätigungsnachricht ist,

wobei die in einer dritten Nachricht enthaltene aktivitätsbezogene Information in einer zweiten Prozedur empfangen wird, und

wobei die aktivitätsbezogene Information anzeigt, ob das Endgerät (60) inaktiv ist oder nicht.


 
2. Basisstation nach Anspruch 1, wobei die aktivitätsbezogene Information übertragen wird, wenn eine Inaktivität des Endgeräts (60) erfasst wird.
 
3. Basisstation nach Anspruch 1 oder 2, wobei die erste Nachricht eine Modifizierungsanforderungsnachricht und/oder eine Hinzufügungsanforderungsnachricht ist.
 
4. Sekundäre Basisstation (200), die mit einem Endgerät (60) über einen SCG-, sekundäre Zellengruppe, Träger für Doppelkonnektivität kommuniziert, mit:

einem Empfänger, der dafür konfiguriert ist, eine erste Nachricht von einer Master-Basisstation (100) zu empfangen, die dafür konfiguriert ist, mit dem Endgerät (60) über einen MCG-, Master-Zellengruppe, Träger für die Doppelkonnektivität zu kommunizieren, wobei die erste Nachricht einen Inaktivitätszeitnehmer, ein Informationselement, IE, für ein erwartetes UE-Verhalten und ein Informationselement enthält, das eine Anforderung zum Melden aktivitätsbezogener Information anzeigt, die mit einer Aktivität des Endgeräts (60) in einer sekundären Zellengruppe, SCG, der sekundären Basisstation (200) in Beziehung steht; und

einem Sender, der dafür konfiguriert ist, die mit der Master-Basisstation (100) in Beziehung stehende aktivitätsbezogene Information zu übertragen,

wobei die erste Nachricht in einer ersten Prozedur empfangen wird und eine zweite Nachricht in der ersten Prozedur übertragen wird, wobei die zweite Nachricht eine der ersten Nachricht entsprechende Bestätigungsnachricht ist,

wobei die in einer dritten Nachricht enthaltene aktivitätsbezogene Information in einer zweiten Prozedur empfangen wird, und

wobei die aktivitätsbezogene Information anzeigt, ob das Endgerät (60) inaktiv ist oder nicht.


 
5. Basisstation (200) nach Anspruch 4, wobei die aktivitätsbezogene Information übertragen wird, wenn eine Inaktivität des Endgeräts (60) erfasst wird.
 
6. Basisstation (200) nach Anspruch 4 oder 5, wobei die erste Nachricht eine Modifizierungsanforderungsnachricht und/oder eine Hinzufügungsanforderungsnachricht ist.
 
7. Verfahren für eine Basisstation (100), mit den Schritten:

Kommunizieren mit einem Endgerät (60) über einen MCG-, Master-Zellengruppe, Träger für Doppelkonnektivität;

Übertragen einer ersten Nachricht an eine sekundäre Basisstation (200), die mit dem Endgerät (60) über einen SCG-, sekundäre Zellengruppe, Träger für die Doppelkonnektivität kommuniziert, wobei die erste Nachricht einen Inaktivitätszeitnehmer, ein Informationselement, IE, für ein erwartetes UE-Verhalten und ein Informationselement enthält, das eine Anforderung für die sekundäre Basisstation (200) anzeigt, aktivitätsbezogene Information zu melden, die mit einer Aktivität des Endgeräts (60) in einer sekundären Zellengruppe, SCG, der sekundären Basisstation (200) in Beziehung steht; und

Empfangen der durch die sekundäre Basisstation (200) übertragenen aktivitätsbezogenen Information,

wobei die erste Nachricht in einer ersten Prozedur übertragen wird und eine zweite Nachricht in der ersten Prozedur empfangen wird, wobei die zweite Nachricht eine der ersten Nachricht entsprechende Bestätigungsnachricht ist,

wobei die in einer dritten Nachricht enthaltene aktivitätsbezogene Information in einer zweiten Prozedur empfangen wird, und

wobei die aktivitätsbezogene Information anzeigt, ob das Endgerät (60) inaktiv ist oder nicht.


 
8. Verfahren für eine sekundäre Basisstation (200), mit den Schritten:

Kommunizieren mit einem Endgerät (60) über einen SCG-, sekundäre Zellengruppe, Träger für Doppelkonnektivität;

Empfangen einer ersten Nachricht von einer Master-Basisstation (100), die mit dem Endgerät über einen MCG-, Master-Zellengruppe, Träger für die Doppelkonnektivität kommuniziert, wobei die erste Nachricht einen Inaktivitätszeitnehmer, ein Informationselement, IE, für ein erwartetes UE-Verhalten und ein Informationselement enthält, das eine Anforderung anzeigt, aktivitätsbezogene Information zu melden, die mit einer Aktivität des Endgeräts in einer sekundären Zellengruppe, SCG, der sekundären Basisstation in Beziehung steht; und

Übertragen der aktivitätsbezogenen Information an die Master-Basisstation,

wobei die erste Nachricht in einer ersten Prozedur empfangen wird und eine zweite Nachricht in der ersten Prozedur übertragen wird, wobei die zweite Nachricht eine der ersten Nachricht entsprechende Bestätigungsnachricht ist,

wobei die in einer dritten Nachricht enthaltene aktivitätsbezogene Information in einer zweiten Prozedur empfangen wird, und

wobei die aktivitätsbezogene Information anzeigt, ob das Endgerät (60) inaktiv ist oder nicht.


 


Revendications

1. Station de base (100) qui communique avec un dispositif terminal (60) sur un support de groupe de cellules maître, MCG, pour une double connectivité comprenant :

un transmetteur configuré pour transmettre un premier message à une station de base secondaire (200) qui est configurée pour communiquer avec le dispositif terminal (60) sur un support de groupe de cellules secondaires, SCG, pour la double connectivité, le premier message comprenant un minuteur d'inactivité, un IE de comportement d'UE attendu, et un élément d'information qui indique une demande à la station de base secondaire (200) de rapporter des informations liées à l'activité liées à une activité du dispositif terminal (60) dans un groupe de cellules secondaires, SCG, de la station de base secondaire (200) ; et

un récepteur configuré pour recevoir les informations liées à l'activité transmises par la station de base secondaire (200),

dans laquelle le premier message est transmis et un deuxième message est reçu dans une première procédure, le deuxième message étant un message d'accusé de réception qui correspond au premier message,

dans laquelle les informations liées à l'activité comprises dans un troisième message sont reçues dans une deuxième procédure, et

dans laquelle les informations liées à l'activité indiquent si le dispositif terminal (60) est inactif ou non.


 
2. Station de base selon la revendication 1, dans laquelle les informations liées à l'activité sont transmises lorsqu'une inactivité du dispositif terminal (60) est détectée.
 
3. Station de base selon l'une quelconque des revendications 1 et 2, dans laquelle le premier message est au moins l'un parmi un message de demande de modification et un message de demande d'ajout.
 
4. Station de base secondaire (200) qui communique avec un dispositif terminal (60) sur un support de groupe de cellules secondaires, SCG, pour une double connectivité comprenant :

un récepteur configuré pour recevoir un premier message à partir d'une station de base maîtresse (100) qui est configurée pour communiquer avec le dispositif terminal (60) sur un support de groupe de cellules maître, MCG, pour la double connectivité, le premier message comprenant un minuteur d'inactivité, un IE de comportement d'UE attendu, et un élément d'informations qui indique une demande de rapporter des informations liées à l'activité liées à une activité du dispositif terminal (60) dans un groupe de cellules secondaires, SCG, de la station de base secondaire (200) ; et

un transmetteur configuré pour transmettre les informations liées à l'activité liées à la station de base maître (100),

dans laquelle le premier message est reçu et un deuxième message est transmis dans une première procédure, le deuxième message étant un message d'accusé de réception qui correspond au premier message,

dans laquelle les informations liées à l'activité comprises dans un troisième message sont reçues dans une deuxième procédure, et

dans laquelle les informations liées à l'activité indiquent si le dispositif terminal (60) est inactif ou non.


 
5. Station de base (200) selon la revendication 4, dans laquelle les informations liées à l'activité sont transmises lorsqu'une inactivité du dispositif terminal (60) est détectée.
 
6. Station de base (200) selon l'une des revendications 4 à 5, dans laquelle le premier message est au moins l'un parmi un message de demande de modification et un message de demande d'ajout.
 
7. Procédé pour une station de base (100), comprenant :

la communication avec un dispositif terminal (60) sur un support de groupe de cellules maître, MCG, pour une double connectivité ;

la transmission d'un premier message à une station de base secondaire (200) qui communique avec le dispositif terminal (60) sur un support de groupe de cellules secondaires, SCG, pour la double connectivité, le premier message comprenant un minuteur d'inactivité, un IE de comportement d'UE attendu, et un élément d'informations qui indique une demande à la station de base secondaire (200) de rapporter des informations liées à l'activité liées à une activité du dispositif terminal (60) dans un groupe de cellules secondaires, SCG, de la station de base secondaire (200) ; et

la réception des informations liées à l'activité transmises par la station de base secondaire (200),

dans lequel le premier message est transmis et un deuxième message est reçu dans une première procédure, le deuxième message étant un message d'accusé de réception qui correspond au premier message,

dans lequel les informations liées à l'activité comprises dans un troisième message sont reçues dans une deuxième procédure, et

dans lequel, les informations liées à l'activité indiquent si le dispositif terminal (60) est inactif ou non.


 
8. Procédé pour une station de base secondaire (200), comprenant :

la communication avec un dispositif terminal (60) sur un support de groupe de cellules secondaires, SCG, pour une double connectivité ;

la réception d'un premier message à partir d'une station de base maîtresse (100) qui communique avec le dispositif terminal sur un support de groupe de cellules maître, MCG, pour la double connectivité, le premier message comprenant un minuteur d'inactivité, un IE de comportement d'UE attendu et un élément d'informations qui indique une demande de rapporter des informations liées à l'activité liées à une activité du dispositif terminal dans un groupe de cellules secondaires, SCG, de la station de base secondaire ; et

la transmission des informations liées à l'activité à la station de base maîtresse,

dans lequel le premier message est reçu et un deuxième message est transmis dans une première procédure, le deuxième message étant un message d'accusé de réception qui correspond au premier message,

dans lequel les informations liées à l'activité comprises dans un troisième message sont reçues dans une deuxième procédure, et

dans lequel, les informations liées à l'activité indiquent si le dispositif terminal (60) est inactif ou non.


 




Drawing


















































Cited references

REFERENCES CITED IN THE DESCRIPTION



This list of references cited by the applicant is for the reader's convenience only. It does not form part of the European patent document. Even though great care has been taken in compiling the references, errors or omissions cannot be excluded and the EPO disclaims all liability in this regard.

Non-patent literature cited in the description