(11)EP 3 733 502 A1

(12)EUROPEAN PATENT APPLICATION
published in accordance with Art. 153(4) EPC

(43)Date of publication:
04.11.2020 Bulletin 2020/45

(21)Application number: 18906952.9

(22)Date of filing:  21.11.2018
(51)International Patent Classification (IPC): 
B63J 99/00(2009.01)
H02P 9/04(2006.01)
B63J 3/02(2006.01)
(86)International application number:
PCT/JP2018/043058
(87)International publication number:
WO 2019/163228 (29.08.2019 Gazette  2019/35)
(84)Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA ME
Designated Validation States:
KH MA MD TN

(30)Priority: 21.02.2018 JP 2018029088

(71)Applicant: Mitsubishi Shipbuilding Co., Ltd.
Yokohama-shi Kanagawa 220-8401 (JP)

(72)Inventors:
  • KUROIWA, Ryota
    Tokyo 108-8215 (JP)
  • YAMATO, Kuniaki
    Tokyo 108-8215 (JP)

(74)Representative: Henkel & Partner mbB 
Patentanwaltskanzlei, Rechtsanwaltskanzlei Maximiliansplatz 21
80333 München
80333 München (DE)

  


(54)POWER GENERATION SYSTEM FOR SHIPS


(57) This power generation system for ships comprises: a plurality of generators (11, 12, 13) that supply power to the interior of a ship; a secondary battery 14 which stores the power output from the plurality of generators (11, 12, 13) and supplies the stored power to the interior of the ship; and a control device 20 that supplies the power to the ship using the first generator 11 among the plurality of generators (11, 12, 13) and the secondary battery 14 during normal operation of the ship. The control device 20 charges the secondary battery 14 so as to enable output of power equivalent to that of the first generator 11 during inward/outward clearance of the ship.




Description

Technical Field



[0001] The present invention relates to a power generation system for ships.

Background Art



[0002] In a ship, such as a ferry, in order to supply power to inboard facilities, a plurality (for example, three) of generators are mounted in view of redundancy or needed maximum power, and each generator is operated such that an operation time becomes uniform. The maximum power is needed, for example, in a case where equipment, such as a bow thruster, is used during entry and departure. In this case, the three generators are operated under a high load. On the other hand, during normal sailing, power is supplied to the interior of the ship using two generators, and a remaining one generator is made on standby.

[0003] Normally, since the generator is designed such that fuel efficiency is good with a rated output, no problem occurs with fuel efficiency during entry and departure. However, since the rated power of the generator is set based on power needed during entry and departure, two generators are operated under a low load (for example, 60% of the rated output) during normal sailing, and there is a problem in that fuel efficiency is deteriorated. For this reason, in order to operate the generators under a high load to restrain deterioration of fuel efficiency even during normal sailing, it is desirable to use a generator having a small rated output and a secondary battery in combination.

[0004] PTL 1 discloses an electric motor system that includes a generator and a secondary battery, and can be operated with high efficiency even though requested torque and a requested rotation speed to a rotation output are changed.

Citation List


Patent Literature



[0005] [PTL 1] Japanese Unexamined Patent Application Publication No. 2003-189690

Summary of Invention


Technical Problem



[0006] However, in PTL 1, there is no description that deterioration of fuel efficiency is suppressed using the secondary battery. Accordingly, even though the electric motor system described in PTL 1 is applied to a ship, it is hard to suppress deterioration of the fuel efficiency of the generators during normal sailing of the ship.

[0007] Therefore, an object of the invention is to suppress deterioration of fuel efficiency of generators during normal sailing using a secondary battery in a ship.

Solution to Problem



[0008] A power generation system for ships of the invention includes a plurality of generators that supply power to the interior of a ship, a secondary battery that stores power output from the plurality of generators and supplies the stored power to the interior of the ship, and a control device that supplies power to the ship using a first generator among the plurality of generators and the secondary battery during normal sailing of the ship. The control device charges the secondary battery so as to enable output of power equivalent to that of the first generator during entry and departure of the ship.

[0009] With this structure, it is possible to provide power needed for the ship using a generator operated under a high load and the secondary battery. Accordingly, it is possible to improve the fuel efficiency of the generators.

[0010] It is preferable that the secondary battery has capacity equal to or greater than 90% and equal to or less than 120% of a rated power of the first generator.

[0011] With this structure, the secondary battery can be used in the same manner as the generators. Accordingly, it is possible to improve the fuel efficiency of the generators.

[0012] It is preferable that, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, and charges the secondary battery using a third generator among the plurality of generators.

[0013] With this structure, during normal sailing, it is possible to charge the secondary battery while operating the respective generators under a high load. Accordingly, it is possible to improve fuel efficiency.

[0014] It is preferable that, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, and charges the secondary battery using surplus power out of power supplied to the interior of the ship.

[0015] With this structure, during normal sailing, it is possible to charge the secondary battery while operating the respective generators under a high load. Accordingly, it is possible to improve fuel efficiency.

[0016] It is preferable that the power generation system further includes a shaft generator provided in a rotary shaft of propulsion equipment.

[0017] With this structure, it is possible to provide power needed for the ship using a generator operated under a high load, the secondary battery, and the shaft generator. Accordingly, it is possible to improve the fuel efficiency of the generators.

[0018] It is preferable that, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators and charges the secondary battery using a third generator among the plurality of generators and the shaft generator.

[0019] With this structure, during normal sailing, it is possible to charge the secondary battery while operating the respective generators under a high load. Accordingly, it is possible to improve the fuel efficiency of the generators.

[0020] It is preferable that, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and the shaft generator, and charges the secondary battery using a second generator among the plurality of generators.

[0021] With this structure, during normal sailing, it is possible to charge the secondary battery while operating the respective generators under a high load. Accordingly, it is possible to improve the fuel efficiency of the generators.

[0022] It is preferable that, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, charges the secondary battery using a third generator among the plurality of generators, and supplies power to the shaft generator using the secondary battery.

[0023] With this structure, during normal sailing, it is possible to charge the secondary battery while operating the respective generators under a high load, and to supply to power to the shaft generator using the secondary battery. Accordingly, it is possible to improve the fuel efficiency of the generators. Since it is possible to support rotation of a propeller using the secondary battery, it is possible to reduce fuel consumption of a main engine.

[0024] It is preferable that, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, and charges the secondary battery using surplus power out of power supplied to the interior of the ship and the shaft generator.

[0025] With this structure, during normal sailing, it is possible to charge the secondary battery while operating the respective generators under a high load. Accordingly, it is possible to improve the fuel efficiency of the generators.

[0026] It is preferable that, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, charges the secondary battery using surplus power out of power supplied to the interior of the ship, and supplies power to the shaft generator using the secondary battery.

[0027] With this structure, during normal sailing, it is possible to charge the secondary battery while operating the respective generators under a high load. Accordingly, it is possible to improve the fuel efficiency of the generators.

Brief Description of Drawings



[0028] 

Fig. 1 is a block diagram showing the configuration of a power generation system according to according to a first embodiment of the invention.

Fig. 2 is a flowchart showing an example of the operation of the power generation system according to the first embodiment of the invention during entry and departure.

Fig. 3 is a flowchart showing the operation of the power generation system according to the first embodiment of the invention during normal sailing of a ship.

Fig. 4 is a block diagram showing the configuration of a power generation system according to a modification example of the first embodiment of the invention.

Fig. 5 is a flowchart showing an example of the operation of the power generation system according to the modification example of the first embodiment of the invention during normal sailing of a ship.

Fig. 6 is a block diagram showing the configuration of a power generation system according to a second embodiment of the invention.

Fig. 7 is a flowchart showing an example of the operation of the power generation system of according to the second embodiment of the invention during normal sailing of a ship.

Fig. 8 is a flowchart showing an example of the operation of the power generation system according to the second embodiment of the invention during normal sailing of the ship.

Fig. 9 is a flowchart showing an example of the operation of the power generation system according to the second embodiment of the invention during normal sailing of the ship.

Fig. 10 is a block diagram showing the configuration of a power generation system according to a modification example of the second embodiment of the invention.

Fig. 11 is a flowchart showing an example of the operation of the power generation system according to the modification example of the second embodiment of the invention during normal sailing of a ship.

Fig. 12 is a flowchart showing an example of the operation of the power generation system according to the modification example of the second embodiment of the invention during normal sailing of the ship.


Description of Embodiments



[0029] A preferred embodiment of a power generation system for ships according to the invention will be described below in detail referring to the accompanying drawings. Note that the invention is not limited to the embodiment, and in a case where there are a plurality of embodiments, combinations of the embodiments still fall within the scope of the invention.

[0030] The configuration of a power generation system according to a first embodiment of the invention will be described in connection with Fig. 1. Fig. 1 is a block diagram showing the configuration of the power generation system according to the first embodiment of the invention.

[0031] As shown in Fig. 1, a power generation system 1 includes a main generator 10 and a control device 20. The main generator 10 has a first generator 11, a second generator 12, a third generator 13, and a secondary battery 14. Although the power generation system 1 has three generators, this is for illustration, and is not intended to limit the invention. The power generation system 1 may have more generators.

[0032] The first generator 11, the second generator 12, and the third generator 13 are generators that are provided in the interior of a ship. The first generator 11, the second generator 12, and the third generator 13 supply power to respective facilities that are provided in the interior of the ship. It is preferable that the first generator 11, the second generator 12, and the third generator 13 have the same rated power. In this case, the rated output of each of the first generator 11, the second generator 12, and the third generator 13 is, for example, 1000 kW. Note that the rated output of each of the first generator 11, the second generator 12, and the third generator 13 may be set according to power needed during entry and departure of the ship.

[0033] The secondary battery 14 is provided in the interior of the ship and supplies power to respective facilities that are provided in the interior of the ship. The secondary battery 14 supplies, for example, power, which is insufficient for power supplied to the interior or the ship using one generator operated under a high load (for example, 90%) out of power needed in the interior of the ship, to the interior of the ship. The secondary battery 14 is charged using the first generator 11, the second generator 12, and the third generator 13. The rated power of the secondary battery 14 is, for example, 1500 kW in a case where the rated power of each of the first generator 11, the second generator 12, and the third generator 13 is 1000 kW. That is, the secondary battery 14 is a comparatively large-capacity secondary battery, and can output power as much as each of the first generator 11, the second generator 12, and third generator 13. Specifically, it is preferable that the secondary battery 14 can output power equal to or greater than 90% and equal to or less than 120% of the rated output of each of the generators. An upper limit of the capacity of the secondary battery 14 is decided in view of the cycle characteristic of the secondary battery 14. For example, the upper limit of the capacity of the secondary battery 14 is decided such that power equal to or greater than 90% of the rated power of the third generator 13 can be output from the first generator 11 even though the capacity of the secondary battery 14 is deteriorated to 80%. For this reason, the secondary battery 14 can be used instead of the first generator 11, the second generator 12, and the third generator 13.

[0034] The control device 20 controls the first generator 11, the second generator 12, the third generator 13, and the secondary battery 14. Specifically, the control device 20 expands and executes a program stored in a storage device (not shown), thereby controlling the first generator 11, the second generator 12, the third generator 13, and the secondary battery 14. The control device 20 can be implemented by an electronic circuit including a central processing unit (CPU), or the like.

[0035] Next, the operation of the power generation system 1 shown in Fig. 1 will be described referring to Figs. 2 and 3. Fig. 2 is a flowchart showing the operation of the power generation system 1 during entry and departure of the ship. Fig. 3 is a flowchart showing the operation of the power generation system 1 during normal sailing of the ship. In the following description, although an example where power needed during entry and departure of the ship is 4500 kW, and power needed during normal sailing is 1800 kW will be described, the invention is not limited thereto.

[0036] First, the operation of the power generation system 1 during entry and departure of the ship will be described in connection with Fig. 2. The control device 20 operates the first generator 11, the second generator 12, and the third generator 13 (Step S101). Here, the control device 20 operates the first generator 11, the second generator 12, and the third generator 13 with the rated output. It is assumed that the rated power of each of the first generator 11, the second generator 12, and the third generator 13 is 1000 kW. That is, the control device 20 makes the first generator 11, the second generator 12, and the third generator 13 output power of 3000 kW. Then, the control device 20 progresses to Step S102.

[0037] The control device 20 operates the secondary battery 14 (Step S102). Here, the secondary battery 14 is charged so as to enable output of power as much as each of the first generator 11, the second generator 12, and the third generator 13 during normal sailing. Specifically, the control device 20 makes the secondary battery 14 output power of 1500 kW. Then, the control device 20 progresses to Step S103.

[0038] The control device 20 supplies power of 4500 kW to the interior of the ship using the first generator 11, the second generator 12, the third generator 13, and the secondary battery 14 (Step S103).

[0039] Next, the operation of the power generation system 1 during normal sailing of the ship will be described in connection with Fig. 3.

[0040] First, the control device 20 operates the first generator 11 (Step S201). Here, the control device 20 operates, for example, the first generator 11 under a high load (for example, 90% of the rated output), and makes the second generator 12 and the third generator 13 on standby. Specifically, in a case where the rated power of the first generator is 1000 kW, the control device 20 makes the first generator 11 output power of 900 kW. Then, the control device 20 progresses to Step S202.

[0041] The control device 20 operates the secondary battery 14 (Step S202). Here, the control device 20 makes power needed in the interior of the ship be output. For example, since power needed in the interior of the ship is 1800 kW, and the first generator 11 outputs power of 900 kW, the control device 20 makes the secondary battery 14 output insufficient power of 900 kW. Then, the control device 20 progresses to Step S203.

[0042] The control device 20 supplies power of 1800 kW to the interior of the ship using the first generator 11 and the secondary battery 14 (Step S203). Then, the control device 20 progresses to Step S204.

[0043] Next, the control device 20 confirms an amount of charge of the secondary battery 14 (Step S204). Then, the control device 20 progresses to Step S205.

[0044] In a case where the secondary battery 14 does not need charging (in Step S205, "No"), the control device 20 returns to Step S203. That is, in a case where the amount of charge of the secondary battery 14 is sufficient, power is continued to be supplied to the interior of the ship using the first generator 11 and the secondary battery 14. On the other hand, in a case where the secondary battery 14 needs charging (in Step S205, "Yes"), the control device 20 progresses to Step S206. A case where the secondary battery 14 needs charging means, for example, a case where power equivalent to that of each of the generators cannot be output during entry and departure.

[0045] The control device 20 stops the secondary battery (Step S206). Then, the control device 20 progresses to Step S207.

[0046]  The control device 20 operates the second generator 12 and the third generator 13 (Step S207). Here, the control device 20 operates the second generator 12 and the third generator 13 under a high load (for example, 90% of the rated power). Specifically, in a case where the rated power of each of the second generator 12 and the third generator 13 is 1000 kW, the control device 20 makes the second generator 12 and the third generator 13 output power of 900 kW. That is, the control device 20 operates the three generators of the first generator 11, the second generator 12, and the third generator 13 under a high load. Then, the control device 20 progresses to Step S208.

[0047] The control device 20 supplies power of 1800 kW needed in the interior of the ship using the first generator 11 and the second generator 12 (Step S208). Then, the control device 20 progresses to Step S209.

[0048] The control device 20 charges the secondary battery 14 using the third generator 13 (Step S209). Here, the control device 20 charges the secondary battery 14 using the third generator 13 such that the ship can secure power needed during entry and departure. Specifically, in a case where the rated power of each of the first generator 11, the second generator 12, and the third generator 13 is 1000 kW, the secondary battery 14 is charged so as to enable output of power of 1500 kW. Since the first generator 11, the second generator 12, and the third generator 13 have the same rated output, the first generator 11, the second generator 12, and the third generator 13 are operated in a rotating manner such that an operation rate becomes the same.

[0049] Next, a modification example of the power generation system 1 according to the first embodiment will be described referring to Fig. 4. Fig. 4 is a block diagram showing the configuration of a power generation system 1A according to a modification example of the first embodiment.

[0050] As shown in Fig. 4, the power generation system 1A includes a main generator 10A and a control device 20. The main generator 10A has a first generator 11, a second generator 12, and a secondary battery 14. That is, the power generation system 1A is different from the power generation system 1 in that power is supplied to a ship using the two generators and the secondary battery. In this case, it is assumed that the rated output of each of the first generator 11 and the second generator 12 is 1500 kW in a case where power needed during entry and departure of the ship is 4500 kW.

[0051]  Next, the operation of the power generation system 1A shown in Fig. 4 will be described referring to Fig. 5. Fig. 5 is a flowchart showing the operation of the power generation system 1A during normal sailing of the ship. The operation during entry and departure is the same as in the power generation system 1, and thus, description thereof will not be repeated. In the following description, an example where power needed during entry and departure of the ship is 4500 kW, and power needed during normal sailing is 1800 kW will be described.

[0052] The control device 20 operates the first generator 11 (Step S301). Here, the control device 20 operates, for example, the first generator 11 under a high load (for example, 90% of the rated power), and makes the second generator 12 on standby. Specifically, in a case where the rated power of the first generator is 1500 kW, the control device 20 makes the first generator 11 output power of 1350 kW. Then, the control device 20 progresses to Step S302.

[0053] The control device 20 operates the secondary battery 14 (Step S302). Here, the control device 20 makes power needed in the interior of the ship be output. For example, since power needed in the interior of the ship is 1800 kW, and the first generator 11 outputs power of 1350 kW, the control device 20 makes the secondary battery 14 output insufficient power of 450 kW. Then, the control device 20 progresses to Step S303.

[0054] The control device 20 supplies power of 1800 kW to the interior of the ship using the first generator 11 and the secondary battery 14 (Step S303). Then, the control device 20 progresses to Step S304.

[0055] Next, the control device 20 confirms an amount of charge of the secondary battery 14(Step S304). Then, the control device 20 progresses to Step S305.

[0056] In a case where the secondary battery 14 does not need charging (in Step S305, "No"), the control device 20 returns to Step S303. On the other hand, in a case where the secondary battery 14 needs charging (in Step S305, "Yes"), the control device 20 progresses to Step S306.

[0057] The control device 20 stops the secondary battery 14 (Step S306). Then, the control device 20 progresses to Step S307.

[0058] The control device 20 operates the second generator 12 (Step S307). Here, the control device 20 operates, for example, the second generator 12 under a high load (for example, 90% of the rated power). Specifically, in a case where the rated power of the second generator 12 is 1500 kW, the control device 20 makes the second generator 12 output power of 1350 kW. That is, the control device 20 operates the first generator 11 and the second generator 12 under a high load. Then, the control device 20 progresses to Step S308.

[0059] The control device 20 supplies power of 1800 kW needed in the interior of the ship using the first generator 11 and the second generator 12 (Step S308). Then, the control device 20 progresses to Step S309.

[0060] The control device 20 charges the secondary battery 14 using the first generator 11 and the second generator 12 (Step S309). Here, the secondary battery 14 is charged using surplus power out of power supplied from the first generator 11 and the second generator 12 to the interior of the ship such that the ship can secure power needed during entry and departure. Specifically, since power needed in the interior of the ship is 1800 kW, and the first generator 11 and the second generator 12 output power of 2700 kW in total, the control device 20 charges the secondary battery 14 using surplus power of 900 kW.

[0061] As described above, in the embodiment, since the use of the secondary battery enables reduction in the rated output of each of the generators compared to the related art, during normal sailing, it is possible to constantly operate the respective generators under a high load. Accordingly, in the embodiment, it is possible to suppress deterioration of the fuel efficiency of the power generation system during normal sailing of the ship.

[0062] In the embodiment, although the main engine is powered by a diesel engine, the main engine may be powered electrically. In a case where the main engine is powered through electric drive, a plurality of generators are further mounted, whereby the embodiment can be applied. With this, even though the main engine is electrically driven, it is possible to operate the respective generators under a high load while providing power using the secondary battery. Accordingly, even though the main engine is electrically driven, it is possible to suppress deterioration of fuel efficiency.

[0063] A power generation system 1B according to a second embodiment of the invention will be described in connection with Fig. 6. Fig. 6 is a block diagram showing the configuration of the power generation system 1B according to the second embodiment of the invention.

[0064] As shown in Fig. 6, the power generation system 1B includes a main generator 10, a control device 20, a shaft generator 30, and a propeller 40.

[0065] The shaft generator 30 is a rotary generator provided in a rotary shaft of propulsion equipment. Specifically, the shaft generator 30 generates power using rotation of a shaft for transmitting power of a main engine to the propeller 40. The shaft generator 30 supplies generated power to the interior of the ship or charges the secondary battery 14 using generated power during normal sailing of the ship. The shaft generator 30 does not normally supply power to the interior of the ship and does not charge the secondary battery 14 during entry and departure. In a case where power to be supplied to the interior of the ship is insufficient, or the like, the shaft generator 30 may supply power to the interior of the ship.

[0066] Next, the operation of the power generation system 1B shown in Fig. 6 will be described referring to Fig. 7. Fig. 7 is a flowchart showing the operation of the power generation system 1B during normal sailing of the ship. The operation shown in Fig. 7 is an operation to supply power to the interior of the ship using the first generator 11 and the second generator 12, and to charge the secondary battery 14 using the third generator 13 and the shaft generator 30 in a case where the secondary battery 14 needs charging. The operation during entry and departure is the same as in the power generation system 1, and thus, description thereof will not be repeated. In the following description, an example where power needed during entry and departure of the ship is 4500 kW, and power needed during normal sailing is 1800 kW will be described.

[0067] First, the control device 20 operates the first generator 11 (Step S401). Here, the control device 20 operates, for example, the first generator 11 under a high load (for example, 90% of the rated output), and makes the second generator 12 and the third generator 13 on standby. Then, the control device 20 progresses to Step S402.

[0068] The control device 20 operates the secondary battery 14 (Step S402). Here, the control device 20 makes power needed in the interior of the ship be output. Then, the control device 20 progresses to Step S403.

[0069] The control device 20 supplies power of 1800 kW to the interior of the ship using the first generator 11 and the secondary battery 14 (Step S403). Here, the control device 20 may supply power to the interior of the ship using the shaft generator 30. Then, the control device 20 progresses to Step S404.

[0070] Next, the control device 20 confirms an amount of charge of the secondary battery 14 (Step S404). Then, the control device 20 progresses to Step S405.

[0071] In a case where the secondary battery 14 does not need charging (in Step S405, "No"), the control device 20 returns to Step S403. On the other hand, in a case where the secondary battery 14 needs charging (in Step S405, "Yes"), the control device 20 progresses to Step S406. A case where the secondary battery 14 needs charging means, for example, a case where power equivalent to that of each of the generators cannot be output during entry and departure.

[0072] The control device 20 stops the secondary battery (Step S406). Then, the control device 20 progresses to Step S407.

[0073] The control device 20 operates the second generator 12, the third generator 13, and the shaft generator 30 (Step S407) . Here, the control device 20 makes the second generator 12 output power needed in the interior of the ship. Then, the control device 20 progresses to Step S408.

[0074] The control device 20 supplies power of 1800 kW needed in the interior of the ship using the first generator 11 and the second generator 12 (Step S408). Then, the control device 20 progresses to Step S409.

[0075] The control device 20 charges the secondary battery 14 using the third generator 13 and the shaft generator 30 (Step S409). Here, the control device 20 charges the secondary battery 14 using the third generator 13 and the shaft generator 30 such that the ship can secure power needed during entry and departure. In a case where the secondary battery 14 can be sufficiently charged only using the third generator 13 or the shaft generator 30, the control device 20 may operate only one of the third generator 13 and the shaft generator 30 in Step S407.

[0076] Next, an operation of the power generation system 1B shown in Fig. 6 different from Fig. 7 will be described referring to Fig. 8. Fig. 8 is a flowchart showing an operation of the power generation system 1B different from Fig. 7 during normal sailing of the ship. Specifically, the operation shown in Fig. 8 is an operation to supply power to the interior of the ship using the first generator 11 and the shaft generator 30 and charge the secondary battery 14 using the second generator 12 in a case where the secondary battery 14 needs charging.

[0077] Steps S501 to S506 are the same as Steps S401 to S406 shown in Fig. 7, and thus, description thereof will not be repeated.

[0078] The control device 20 operates the second generator 12 and the shaft generator 30 (Step S507). Here, the control device 20 makes the shaft generator 30 output power needed in the interior of the ship. For example, since power needed in the interior of the ship is 1800 kW, and the first generator 11 outputs power of 900 kW, the control device 20 makes shaft generator 30 output insufficient power of 900 kW. In the processing of Fig. 8, the third generator 13 is brought into a standby state.

[0079] The control device 20 supplies power of 1800 kW needed in the interior of the ship using the first generator 11 and the shaft generator 30 (Step S508). Then, the control device 20 progresses to Step S509.

[0080]  The control device 20 charges the secondary battery 14 using the second generator 12 (Step S509). Here, the control device 20 charges the secondary battery 14 using the second generator 12 such that the ship can secure power needed during entry and departure. Specifically, in a case where the rated power of each of the first generator 11, the second generator 12, and the third generator 13 is 1000 kW, the secondary battery 14 is charged so as to enable output of power of 1500 kW.

[0081] Next, an operation of the power generation system 1B shown in Fig. 6 different from Figs. 7 and 8 will be described referring to Fig. 9. Fig. 9 is a flowchart showing an operation of the power generation system 1B during normal sailing of the ship different from Figs. 7 and 8. Specifically, the operation shown in Fig. 9 is an operation to supply power to the interior of the ship using the first generator 11 and the second generator 12, to charge the secondary battery 14 using the third generator 13, and to support the rotation of the propeller 40 using the secondary battery 14.

[0082] Steps S601 to S605 are the same as Steps S401 to S405 shown in Fig. 7, and thus, description thereof will not be repeated.

[0083] The control device 20 operates the second generator 12 and the third generator 13 (Step S606). Here, the control device 20 operates the second generator 12 and the third generator 13 under a high load (for example, 90% of the rated power). Specifically, in a case where the rated power of each of the second generator 12 and the third generator 13 is 1000 kW, the control device 20 makes the second generator 12 and the third generator 13 output power of 900 kW. That is, the control device 20 operates the three generators of the first generator 11, the second generator 12, and the third generator 13 under a high load. Then, the control device 20 progresses to Step S607.

[0084] The control device 20 supplies power of 1800 kW needed in the interior of the ship using the first generator 11 and the second generator 12 (Step S607). Then, the control device 20 progresses to Step S608.

[0085] The control device 20 charges the secondary battery 14 using the third generator 13 (Step S608). Here, the control device 20 charges the secondary battery 14 to such an extent as to support the rotation of the propeller 40. Here, in a case the secondary battery 14 is charged with power sufficient for supporting the shaft generator 30, the control device 20 may skip Step S608. Then, the control device 20 progresses to Step S609.

[0086] The control device 20 supplies power to the shaft generator 30 using the secondary battery 14 (Step S609). With this, power is supplied from the shaft generator 30 to rotational power of the propeller 40, and the rotation of the propeller 40 is supported.

[0087] Next, a modification example of the power generation system 1B according to the second embodiment will be described referring to Fig. 10. Fig. 10 is a block diagram showing the configuration of a power generation system 1C according to a modification example of the second embodiment.

[0088] As shown in Fig. 10, the power generation system 1C includes a main generator 10A, a control device 20, a shaft generator 30, and a propeller 40. The main generator 10A has a first generator 11, a second generator 12, and a secondary battery 14. That is, the power generation system 1C is different from the power generation system 1B in that power is supplied to the ship using the two generators and the secondary battery. In a case where the secondary battery 14 needs charging, an operation to supply power to the interior of the ship using the first generator 11 and the shaft generator 30 and to charge the secondary battery 14 using the second generator 12 is the same as the operation shown in Fig. 8 excluding that the third generator 13 is made on standby, and thus, description thereof will not be repeated.

[0089] The operation of the power generation system 1C shown in Fig. 10 will be described referring to Fig. 11. Fig. 11 is a flowchart showing the operation of the power generation system 1C during normal sailing of the ship.

[0090] Steps S701 to S706 are the same as Steps S301 to S306 shown in Fig. 5, and thus, description thereof will not be repeated.

[0091] The control device 20 operates the second generator 12 and the shaft generator 30 (Step S707). Here, the control device 20 operates, for example, the second generator 12 under a high load (for example, 90% of the rated power) . Specifically, in a case where the rated power of the second generator 12 is 1500 kW, the control device 20 makes the second generator 12 output power of 1350 kW. That is, the control device 20 operates the first generator 11 and the second generator 12 under a high load. The control device 20 operates the shaft generator 30 so as to enable charging of the secondary battery 14. Then, the control device 20 progresses to Step S708.

[0092] The control device 20 supplies power of 1800 kW needed in the interior of the ship using the first generator 11 and the second generator 12 (Step S708). Then, the control device 20 progresses to Step S709.

[0093] The control device 20 charges the secondary battery 14 using the first generator 11, the second generator 12, and the shaft generator 30 (Step S709). Here, the secondary battery 14 is charged using surplus power out of power supplied from the first generator 11 and the second generator 12 to the interior of the ship and power output from the shaft generator 30 such that the ship can secure power needed during entry and departure. Specifically, since power needed in the interior of the ship is 1800 kW, and the first generator 11 and the second generator 12 output power of 2700 kW in total, the control device 20 charges the secondary battery 14 using surplus power of 900 kW. In a case where the secondary battery can be sufficiently charge using the first generator 11 and the second generator 12, the control device 20 may not operate the shaft generator 30 in Step S707.

[0094]  Next, an operation of the power generation system 1C shown in Fig. 10 different from Fig. 11 will be described referring to Fig. 12.

[0095] Steps S801 to S805 are the same as Steps S301 to S305 shown in Fig. 5, and thus, description thereof will not be repeated.

[0096] The control device 20 operates the second generator 12 (Step S806). Here, the control device 20 operates, for example, the second generator 12 under a high load (for example, 90% of the rated power). Specifically, in a case where the rated power of the second generator 12 is 1500 kW, the control device 20 makes the second generator 12 output power of 1350 kW. That is, the control device 20 operates the first generator 11 and the second generator 12 under a high load. Then, the control device 20 progresses to Step S807.

[0097] The control device 20 supplies power of 1800 kW needed in the interior of the ship using the first generator 11 and the second generator 12 (Step S807). Then, the control device 20 progresses to Step S808.

[0098] The control device 20 charges the secondary battery 14 using the first generator 11 and the second generator 12 (Step S808). Here, the secondary battery 14 is charged using surplus power out of power supplied from the first generator 11 and the second generator 12 to the interior of the ship such that the ship can secure needed during entry and departure. Specifically, since power needed in the interior of the ship is 1800 kW, and the first generator 11 and the second generator 12 output power of 2700 kW in total, the control device 20 charges the secondary battery 14 using surplus power of 900 kW. Then, the control device 20 progresses to Step S809.

[0099] The control device 20 supplies power to the shaft generator 30 using the secondary battery 14 (Step S809). The control device 20 may skip Step S809.

[0100] As described above, in the embodiment, since the use of the secondary battery enables reduction in the rated output of each of the generators compared to the related art, during normal sailing, it is possible to constantly operate the respective generators under a high load. Accordingly, in the embodiment, it is possible to suppress deterioration of the fuel efficiency of the power generation system during normal sailing of the ship.

[0101]  In the embodiment, during normal sailing, it is possible to supply power to the interior of the ship or to charge the secondary battery using the respective generators and the shaft generator. In the embodiment, it is possible to further suppress deterioration of the fuel efficiency of the power generation system during normal sailing of the ship. In the embodiment, it is possible to reduce the fuel consumption of the main engine.

Reference Signs List



[0102] 
1, 1A, 1B, 1C:
power generation system
10, 10A:
main generator
11:
first generator
12:
second generator
13:
third generator
14:
secondary battery
30:
shaft generator
40:
propeller



Claims

1. A power generation system for ships comprising;
a plurality of generators that supply power to an interior of a ship;
a secondary battery that stores power output from the plurality of generators and supplies the stored power to the interior of the ship; and
a control device that, during normal sailing of the ship, supplies power to the interior of the ship using a first generator among the plurality of generators and the secondary battery, and charges the secondary battery so as to enable output power equivalent to that of the first generator during entry and departure.
 
2. The power generation system for ships according to claim 1,
wherein the secondary battery has capacity equal to or greater than 90% and equal to or less than 120% of a rated power of the first generator.
 
3. The power generation system for ships according to claim 1 or 2,
wherein, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, and charges the secondary battery using a third generator among the plurality of generators.
 
4. The power generation system for ships according to claim 1 or 2,
wherein, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, and charges the secondary battery using surplus power out of power supplied to the interior of the ship.
 
5. The power generation system for ships according to claim 1 or 2, further comprising:
a shaft generator provided in a rotary shaft of propulsion equipment of the ship.
 
6. The power generation system for ships according to claim 5,
wherein, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators and charges the secondary battery using a third generator among the plurality of generators and the shaft generator.
 
7. The power generation system for ships according to claim 5,
wherein, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and the shaft generator, and charges the secondary battery using a second generator among the plurality of generators.
 
8. The power generation system for ships according to claim 5,
wherein, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, charges the secondary battery using a third generator among the plurality of generators, and supplies power to the shaft generator using the secondary battery.
 
9. The power generation system for ships according to claim 5,
wherein, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, and charges the secondary battery using surplus power out of power supplied to the interior of the ship and the shaft generator.
 
10. The power generation system for ships according to claim 5,
wherein, during normal sailing of the ship, the control device supplies power to the interior of the ship using the first generator and a second generator among the plurality of generators, charges the secondary battery using surplus power out of power supplied to the interior of the ship, and supplies power to the shaft generator using the secondary battery.
 




Drawing








































Search report