(19)
(11)EP 3 916 165 A3

(12)EUROPEAN PATENT APPLICATION

(88)Date of publication A3:
16.02.2022 Bulletin 2022/07

(43)Date of publication A2:
01.12.2021 Bulletin 2021/48

(21)Application number: 21172468.7

(22)Date of filing:  06.05.2021
(51)International Patent Classification (IPC): 
E03C 1/04(2006.01)
E03C 1/06(2006.01)
(52)Cooperative Patent Classification (CPC):
E03C 1/06; E03C 1/066; E03C 1/0408; E03C 1/0409; E03C 2001/0414
(84)Designated Contracting States:
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR
Designated Extension States:
BA ME
Designated Validation States:
KH MA MD TN

(30)Priority: 08.05.2020 US 202063021717 P
03.05.2021 US 202117306413

(71)Applicant: Kohler Co.
Kohler, WI 53044 (US)

(72)Inventor:
  • CHUNG, Chanseol
    Milwaukee, WI Wisconsin 53202 (US)

(74)Representative: Barker Brettell LLP 
100 Hagley Road Edgbaston
Birmingham B16 8QQ
Birmingham B16 8QQ (GB)

  


(54)ARTICULATING SHOWER ASSEMBLY


(57) An articulating shower assembly (100) is provided. The articulating shower assembly (100) includes a linkage assembly (120) operable between a first position and a second position. A spray head (110) is coupled to the linkage assembly (120) and is operable between the first position and the second position. A handle is pivotally coupled to the linkage assembly (120) such that the linkage assembly (120) is configured to transition between the first position and the second position in response to a force applied to the handle.







Search report















Search report