Description | Claims | Drawing |
US7890200B | [0008] [0086] [0086] [0086] |
US20080234939A | [0029] |
Optimization of Oil Production Based on a Capacitance Model of Production and Injection Rates | [0005] [0104] |
The Use of Capacitance-resistivity Models for Rapid Estimation of Waterflood Performance and Optimization | [0005] [0096] [0104] |
Estimation of Interwell Connectivity in the Case of Fluctuating Bottomhole Pressures | [0005] |