[0001] The present invention refers to equipment for stowing and handling rods for use in
drilling plants.
[0002] Generally, equipment for stowing and handling rods for use in drilling plants of
well-known types comprises a drilling tower; a driving head supported by the tower
itself; at least one container for the rods, and a control unit for moving the rods,
which is suitable for receiving the rods from the container, and is also suitable
for moving the rods themselves from a loading working position, in which the rods
are horizontally arranged, and a vertical screwing position, in which the rods are
vertically arranged do that they can be screwed onto the driving head.
[0003] As far as the kind of equipment for stowing and handling as described above is concerned,
the above mentioned lifting means comprises a beam for moving the rods which is frontally
mounted to the drilling tower in order that it may rotate around a horizontal rotating
axis, and a screwing device of the rods supported by the beam in order to block the
rods in relation to the beam itself.
[0004] The equipment described above suffers from certain drawbacks due to the time needed
to prepare the equipment itself, this relates in particular to the time necessary
to prepare the equipment for working condition, which is very long. Another drawback
results from the fact that it is practically impossible to regulate the height of
the rods in their vertical screwing working position unless the height of the entire
control unit for moving the rods is regulated. This means, furthermore, that it is
impossible to carry out screwing and/or unscrewing operations as far as the rods are
concerned with the driving head at a height near to the handling plane.
[0005] The aim of the present invention is to realise equipment for stowing and handling
rods for use in drilling plants, which does not only permit the resolution of the
drawbacks described above in a simple and economic fashion, but also results in greater
flexibility
[0006] According to the present invention equipment for the stowing and handling of rods
for use in drilling plants will be realised comprising a service well for removing
and placing individual rods, and a control unit for moving the rods suitable for moving
the rods from and to the service well itself, and comprising tiltable means which
can move between a flat working position and a raised working position in order to
arrange the rods on an upright of the said service well, the equipment being characterised
by the fact that the said tiltable means are preassembled tilting means which can
be laterally installed to the service well, and comprise a support beam which can
tilt around a rotating axis, and positioning means associated to the beam itself in
order to position each individual rod in a set-up working position at least along
the said upright.
[0007] The invention will now be described with reference to the attached drawings, which
illustrate a non-limiting embodiment of the equipment, in which:
- Figure 1
- illustrates a lateral elevation of a preferred embodiment of equipment for stowing
and handling according to the present invention in two different respective working
positions;
- Figure 2
- is a plan view, with some parts removed for reasons of clarity, of a detail of the
equipment shown in Figure 1;
- Figure 3
- is a lateral elevation of the equipment shown in Figure 1; and
- Figures 4 and 5
- illustrate the equipment shown in Figure 1 in another working condition.
[0008] With reference to Figures 1 and 2, the number 1 indicates a drilling plant, in its
entirety, which is suitable for excavating boreholes (not illustrated).
[0009] The drilling plant 1 comprises a drilling tower 3 and a driving head 4 for the screwing
of drilling rods 5 or casing pipes 5a (Figures 4 and 5), and a quadrilateral articulated
device, which is interposed between the tower 3 and the head 4, and is suitable not
only for permitting the head 4 to slide along the tower 3, but also for permitting
the movement of the head 4 itself from an operating working position, in which the
head 4 is arranged on an upright A of the above-mentioned borehole, and a handling
working position, in which the head 4 is arranged on an upright B of a service well
7 which is laterally arranged to the borehole itself.
[0010] The drilling plant 1 also comprises equipment 8 for stowing and handling the rods
5, which comprises in its turn a control unit 9 for moving the rods 5 themselves suitable
for moving the rods 5 from and towards the service well 7, and for maintaining the
rods 5 at a determined height in relation to the service well 7 itself, or for arranging
the rods 5 inside the service well 7 in such a way that an operator can arranged the
head 4 on the rod 5.
[0011] The equipment 8 also comprises two stowing stations S1 and S2 for stowing the rods
arranged opposite the control unit 9 for housing the provisioning semitrailer 10 of
the rods 5, and an unloading device 11 which is suitable for moving the rods 5 themselves
from the provisioning semitrailer 10 to the control unit 9. As an alternative to the
provisioning semitrailer 10, the equipment 8 can comprise two so-called "pipe racks"
(noted but not illustrated), which can be arranged in the stations S1 and S2 in order
to supply the control unit 9 with the rods 5.
[0012] The control unit 9 for moving the rods is a pre-assembled control unit, which can
be transported using the usual means of transport, and can be installed laterally
to the service well 7 between the two stations S1 and S2, and comprising a platform
12 presenting a main longitudinal axis C which is arranged incidentally and transversally
to the uprights A and B, and a tiltable loader 13 which is rotatably mounted in relation
to the platform 12 itself in order to rotate around a tilting axis D which is arranged
transversally to the axis C, and is defined by a connecting hinge 14 of the loader
13 to the platform 12.
[0013] The loader 13 comprises a support beam 15 which is hinged to a base of the hinge
14, a carriage 16 which is slidingly mounted along the beam 15, two brackets 17 and
18 which define a longitudinal seat 19 parallel to the beam 15 itself, and a telescopic
actuator device 20 connected to the beam 15 and to the platform 12 in order to rotate
the beam 15 and the seat 19 between a flat working position, in which the seat 19
is arranged parallel to the C axis in order to receive a relative rod 5, and a raised
working position, in which the seat 19 is arranged parallel to the B axis in order
to arrange the rod 5 itself onto the upright B of the service well 7.
[0014] The carriage 16 is part of a positioning device 21, which is suitable for positioning
the rods 5 in a set-up working position in order to permit the withdrawal of the driving
head 4, and comprises, for each of the brackets 17 and 18, a pair of clamps 22 which
can move from and towards the seat 19 in order to clamp onto a rod 5 arranged in the
seat 19 itself. In particular, the bracket 18 is a mobile bracket supported by the
carriage 16, while the bracket 17 is a fixed bracket which is directly supported by
the beam 15, and the respective clamps 22 present a clamping movement onto the seat
19 in order to prevent the rod 5 escaping from the seat 19 itself, and to permit the
rod 5 to slide along the C axis by means of rollers (noted but not illustrated) on
a axis which is transverse to the C axis itself.
[0015] Finally, the control unit 9 comprises a stabilising and levelling device 23 which
is suitable for stabilising and levelling the platform 12 in both a longitudinal and
a transverse direction, which in its turn comprises four hydraulic hammers 24 arranged
in correspondence to the respective corners of the platform 12 itself, and an adjusting
screw 25 which is placed in front of the hinge 14.
[0016] The device 23 is suitable for co-operating with the unloading device 11 in order
to permit a rod 5 to be coupled to the seat 19, said rod 5 having been unloaded from
the provisioning semitrailer 10 by means of the unloading device 11 itself.
[0017] As can be better seen in the illustration shown in Figure 3, the unloading device
11 comprises, for each of the brackets 17 and 18, two telescopic vertical pipes 26
arranged opposite the respective brackets 17, 18, and a pipe 27, which is supported
by the relative pipes 26. The device 11 is provided with two blocking elements 28
arranged at the respective opposite ends in order to block in a waiting position the
rods 5 provided from the stations S1, S2, and is also provided with two further blocking
elements 29 arranged centrally to the pipe 27 itself in order to position a rod 5
onto the upright of the seat 19. The pipes 27 are moved synchronously in relation
to each other by means of activating the relative hydraulic or pneumatic pipes 26,
and they are tilted from and towards the stations S1 and S2 of the pipes 26 themselves
in order to assist the movement of the rods 5 from and towards the elements 29.
[0018] The unloading device 11 also comprises four stabilisers 30 for each provisioning
semitrailer 10 itself in order to permit levelling in a longitudinal direction and
tilting in a transverse direction in such a way as to assist the sliding of the rods
5 loaded onto the provisioning semitrailers 10 itself towards the elements 29. In
the previously mentioned case, in which the provisioning semitrailer 10 is replaced
with "pipe racks", the device 11 comprises a tilting device of a well-known type,
which is not illustrated, suitable for assisting the sliding of the rods 5 loaded
onto the "pipe rack" itself towards the elements 29.
[0019] Figures 4 and 5 refer to the situation in which casing pipes 5a, as well as rods
5, have to be moved, and illustrate an unloading device lls which comprises, for each
station S1 and S2, two telescopic vertical pipes 26s and two horizontal pipes 27s
installed on each provisioning semitrailers 10. The head 4 for the rods 5 is replaced
by a head 4a for the pipes 5a, and it can be seen from the illustration in Figure
4 that there are many advantages as a result of being able to work on the heads 4
and 4a at a height equal to the handling height when faced with the necessity of hooking
the rods 5 and the pipes 5a.
[0020] In use, the platform 12 is taken to the excavation site by means of normal, well-known
types of means of transport, and once the platform 12 has been laterally positioned
to the service well 7 with the relative C axis orientated transversally to the uprights
A and B, the two stations S1 and S2 are engaged by one or two provisioning semitrailer
10, which, as illustrated in Figure 2, move and/or stow the drilling rods 5 or, alternatively,
casing pipes of a well-known type which are not illustrated.
[0021] At this point, the unloading device 11 positions the pipes 27 at a height which substantially
corresponds to the height of the upper edge of the side panel of one of the two provisioning
semitrailer 10, while the stabilisers 30, after having levelled each provisioning
semitrailer 10, tilt the provisioning semitrailer 10 itself from the side of the control
unit 9 in order to send the relative rods 5 to abut against the blocking elements
28. Once the rod 5 is positioned against the element 28, the pipes 27 are tilted to
permit the rod 5 itself to slide towards the elements 28: thus, the elements 29 are
disengaged from the rod 5, which rolls towards the elements 28 themselves and is blocked
by coming into contact with the elements 28 themselves, and when the rod 5 is positioned
on the upright of the C axis, which is to say directly above the seat 19, the pipes
27 are lowered to a point where the rod 5 itself can be inserted inside the seat 19.
[0022] At this point, the clamps 22 block the rod 5 in the seat 19 in such a way as to prevent
any movement of the rod 5 itself in relation to the seat 19 itself, and, subsequently,
the telescopic actuator device 20 rotates the beam 15 around the hinge 14 in such
a way as to arrange the rod 5 itself in its set-up position, which corresponds to
a position in which a lower end 31 of the rod 5 itself remains substantially outside
the service well7, which an upper end 32 of the rod 5 is directly screwed onto the
head 4.
[0023] Once the rod 5 has been withdrawn from the head 4, the clamps 22 free the rod 5 itself,
and, while the quadrilateral articulated device 6 moves the head 4 and the rod 5 onto
the upright A, the device 21 moves the seat 19 back to its flat working position.
[0024] The operations which have just been described are carried out in the same way, but
in reverse order, when a rod 5 has to be unloaded from the head 4 in order to be stowed
again in the station S1 or S2.
[0025] Instead, in the case that it is necessary to arrange the end 32 inside the service
well 7 in order to position the upper end 31 of the rod 5 itself at a determined height
that will permit the drilling plant operators to carry out ordinary operations related
to hooking the rods 5 to the elevators (not illustrated) below the head 4, the carriage
16 is made to slide together with the relative bracket 18 in relation to the beam
15, while the rod 5, which is firmly blocked by the clamp 22 of the bracket 17, slides
inside the bracket 17 by means of the above-mentioned rollers (noted but not illustrated)
on an axis transverse to the C axis.
[0026] Obviously, the positioning height of the rods 5 along the C axis, whether this relates
to drilling rods or casing pipes, can be freely regulated by simply moving the carriage
16 in relation to the beam 15, and by maintaining the rod itself firmly inside the
bracket 18.
[0027] It is obvious from the above description that the opportunity of arriving at an excavation
site with equipment 8 which is already assembled means that a considerable amount
of time can be saved in terms of installation and that, furthermore, the opportunity
of filling the two stations S1 and S2 with normal provisioning semitrailer 10 permits
the availability of containers with a substantially infinite capacity as the empty
provisioning semitrailer 10 can be replaced as and when necessary with full provisioning
semitrailer 10, and also permits major flexibility in terms of the overall functioning
of the equipment 8.
[0028] Furthermore, given that the position of each rod 5 is substantially controlled starting
from the provisioning semitrailers until it reaches its set-up position it is practically
impossible for the rod 5 itself to move accidentally and create a danger to the operators
working on the drilling plant 1.
1. Equipment (8) for stowing and handling rods (5) for drilling plants (1) comprising
a service well (7) for lifting and placing the individual rods (5), and a control
unit (9) for moving the rods (5) suitable for moving the rods (9) from and towards
the service well (7) itself, and comprising tilting means (13) which can move between
a flat working position and a raised working position in order to arrange the rods
(5) on an upright (B) of the said service well (7), the equipment (8) being characterised
by the fact that the said tilting means (13) are pre-assembled tiling means (13) which
can be installed laterally to the service well (7), and comprise a support beam (15)
which tilts around an axis of rotation (D), and positioning means (21) associated
with the beam (15) itself in order to position each rod (5) in a set-up working position
at least along the said upright (B).
2. Equipment according to Claim 1, characterised by the fact that the said tilting means
(13) comprise a platform (12) which can be installed laterally to the said service
well (7), and a horizontal connecting hinge (14) between the platform (12) and the
said support beam (15), the hinge (14) extending along the said axis of rotation (D).
3. Equipment according to Claim 1 or 2, characterised by the fact that said positioning
means (21) comprise blocking means (22) for blocking said rods (5) to said tilting
means (13), and sliding means (16) which are slidingly supported along said support
beam (15) in order to regulate, at least along the said upright (B), the said set-up
working position.
4. Equipment according to Claim 3, characterised by the fact that said blocking means
(22) comprise a housing seat (19( for one of the said rods (5), the seat (19) being
partially supported by said sliding means (16), and at least one clamping pincer (22)
which can close onto a relative rod (5), and comprising a mobile clamp (22) which
can move from and towards the said seat (19).
5. Equipment according to Claim 3, characterised by the fact that the said blocking means
(22) comprise a housing seat (19) for one of the said rods (5), the seat (19) being
partially supported by said sliding means (16); and two camping pincers (22) which
can close onto one of the relative said rods (5), and each comprising a respective
mobile clamp which can move from and towards said seat (19).
6. Equipment according to Claim 5, characterised by the fact that a first clamping pincer
(22) of the said two clamping pincers (22) is integral to the said sliding means (16),
and a second clamping pincer (22) of the said two clamping pincers (22) is integral
to said support beam (15).
7. Equipment according to any of the preceding Claims, characterised by the fact of comprising
at least one service station (S1, S2) arranged laterally to said tilting means (13)
and suitable for housing provisioning means (10) of the said rods (5).
8. Equipment according to Claim 7, characterised by the fact of comprising two service
stations (S1, S2) arranged opposite said tilting means (13).
9. Equipment according to Claim 8, characterised by the fact of comprising unloading
means (11) for unloading the rods (5) from each service station (S1, S2); the unloading
means comprising two cross pipes (27) arranged above said seat (19), and tilting means
(26) for synchronously tilting the cross pipes (27) themselves.
10. Equipment according to any of the preceding Claims, characterised by the fact of comprising
a driving head (4) which is mobile parallel to itself from and towards the said service
well (7).