[0001] The invention relates to a method of excavation for underground structures of variable
cross sectional area.
[0002] Depending on the circumstances at the respective purposes, the cross sectional area
of an underground structure is not always constant and will vary at some points, for
example in a subway system, underground shopping malls, underground water and sewer
lines or water reservoirs. In a subway system, for example, the cross sectional area
of the portion comprising the train tracks is narrow, whereas it is wider for the
station concourse and then narrows again for the tracks leaving the station on the
other side. This pattern is repeated over the length of a subway line. In a conventional
construction method used in such a case a shield excavator is employed for the train
tracks, whereas digging is used from the land surface down to the desired underground
level for the corresponding stations.
[0003] In such a conventional excavation method as set forth above, the following problems
arise:
a) In order to construct a station, a continuous wall is built around the perimeter.
Thereafter, the whole area is excavated and then protective plates must be laid over
the excavation in order to enable traffic to pass by. This type of provisional construction
entails enormous expenses.
b) For the station portion, a huge amount of land must be excavated and removed which
brings about severe limitations on construction in urban areas.
c) When such a large amount of land is excavated, traffic is obstructed and buried
facilities must be moved and/or protected. All these measures prolong the construction
period and are not very economical.
[0004] The object underlying the present invention is to resolve the problems arising with
conventional construction methods and to provide a method of excavation for underground
structures of variable cross sectional area by means of which the amount of land required
for excavation work is minimized in order to significantly reduce the time and expense
required for provisional construction work.
[0005] This object is solved in an advantageous and satisfying manner with the method according
to the invention as defined in the claims and set forth in the following specification.
The preamble of the independent claim corresponds to JP 02 210 189 A.
[0006] A shield excavator of large cross sectional area is used as a main machine, and another
shield excavator of smaller cross sectional area than the main machine is used as
an auxiliary machine. That portion of the underground structure having the large cross
section is excavated using the main machine with the auxiliary machine housed inside
thereof, whereas for that portion of the underground structure of small cross section,
the auxiliary machine is advanced out of the main machine and excavation proceeds
with the auxiliary machine only. In the latter case, the main machine is left on standby
at the next portion of the structure of large cross section, and when the auxiliary
machine reaches that point, it is re-inserted into the main machine; thereafter, excavation
proceeds again using the main machine with the auxiliary machine housed inside and
propelled jointly.
[0007] While the following description relates to the construction of a subway system using
the unique method, the invention is by no means restricted to application in a subway
system, but can be used to construct a large variety of constructions, including roadways,
water and sewer lines, water reservoirs, shopping malls and other underground structures.
Also, various shield excavators of differing shape in cross section have been developed
recently and are in practical use. Hence, it should be noted that the invention is
not restricted to underground structures having a circular cross section, but can
be applied to various other structures comprising elliptical, oval, rectangular, and
gourd-shaped cross sectional areas.
[0008] The invention will be explained in more detail below with reference to preferred
embodiments and accompanying drawings which are only for the purpose of illustration
without limiting the invention.
- Fig. 1
- a perspective and schematic view for explaining the concept of the method of excavation
according to the invention;
- Fig. 2
- a perspective view illustrating a relative movement between a main machine and an
auxiliary machine used in the method of excavation according to the invention;
- Fig. 3
- a sectional view of an excavation apparatus showing the main machine and the auxiliary
machine in combination:
- Fig. 4
- a sectional view illustrating a situation in which the auxiliary machine is withdrawn
from the main machine;
- Fig. 5
- a sectional view illustrating a situation in which the auxiliary machine is moved
into the main machine provided in a stand-by position;
- Fig. 6
- a perspective and schematic view showing a modified concept of the method of excavation
according to the invention; and
- Fig. 7 to Fig. 15
- various combinations of the main machine and the auxiliary machine using different
geometrical configurations.
[0009] In the method according to the invention as shown in Fig. 1, a shield excavator with
a cross sectional area virtually equal to the cross sectional area of a first portion
in an underground structure, for example the station portion of a subway line, is
used as a main machine 1.
[0010] The internal configuration of such a main machine 1 is virtually identical to that
of a conventional shield excavator. As shown in Fig. 3, a shield jack 13 takes the
reaction forces at a segment 14 assembled in the rear to propel the shield excavator
forward. Also, a cutter 12 for boring into the ground is installed on the front face
of the main machine 1.
[0011] Unlike conventional machines, however, the main machine 1 according to the invention
is provided with a hollow cavern 11 used merely to house an auxiliary machine 2, as
shown in Fig. 2. Accordingly, the hollow cavern 11 extends the full length of the
main machine 1 from the front end to the tail end, wherein its inner shape is identical
to the outer shape of the auxiliary machine 2. In other words, if the auxiliary machine
2 is cylindrical, then the hollow cavern 11 is a cylindrical space.
[0012] Moreover, the tube-shaped hollow cavern 11 in the main machine 1 opens at the front
face of the main machine 1. Accordingly, the cutter 12 provided at the front of the
main machine 1 is not a solid circular disk, rather its center is cut away to the
same dimension as the cross section of the hollow cavern 11 to form the ring cutter
12. Such a component is shown, for example, in Fig. 1 of the drawings.
[0013] A shield excavator with a cross sectional area of virtually the same small cross
sectional area of the underground structure, for example, the the track portion of
the subway line, is used as the auxiliary machine 2, as shown in Fig. 1. In other
words, the outer diameter of the auxiliary machine 2 is virtually equal to the cross
sectional area of this portion of small cross sectional area of the underground structure,
for example the track portion of the subway; at the same time, the outer diameter
of the auxiliary machine 2 is equal to the inner diameter of the hollow cavern 11
of the main machine 1.
[0014] The internal configuration of the auxiliary machine 2 is virtually identical to that
of a conventional shield excavator. As shown in Fig. 4, a shield jack 22 takes the
reaction forces at a segment 23 assembled in the rear to propel the shield excavator
forward. Also, a cutter 21 for boring into the ground is installed on the front face
of the excavator forming the auxiliary machine 2.
[0015] Contrary to the cutter 12 of the main machine 1, the cutter 21 of the auxiliary machine
2 is formed as a disk, in particular a circular disk. In such a construction, the
outer edge of the cutter 21 can interlock with the ring cutter 12 of the main machine
1 such that the two cutters 12 and 21 rotate as a monolithic unit.
[0016] It is appropriate that the auxiliary machine 2 uses its own jack 22, and a segment
23 of virtually the same dimension as the auxiliary machine 2 is assembled at the
rear of the machine. That jack 22 takes the reaction forces at this segment 23 when
the auxiliary machine 2 can move forwardly independently of the main machine 1.
[0017] As mentioned above, the diameter of a station portion of a subway is larger than
the diameter of the track portion; hence, the station portion is excavated by means
of the main machine 1 with the auxiliary machine 2 housed inside thereof and cooperating
therewith. For this purpose, the disk cutter 21 of the auxiliary machine 2 is interlocked
with the inner circumference of the ring cutter 12 of the main machine 1, and the
two cutters 12 and 21 rotate together as a monolithic unit.
[0018] The concept of the method according to the invention will be explained in more detail
with reference to Fig. 1 of the drawings. At those points where the cross sectional
area of the underground structure changes from the large cross sectional area to the
smaller cross sectional area and vice versa, a vertical shaft 3 is pre-built at the
respective end of the large cross sectional area portion, for example a station portion.
That is, when excavation of the station portion with the main machine 1 is completed,
it advances into the shaft 3. At this point, excavation shifts to the track portion
of smaller cross section. For this purpose, the operation of the main machine 1 is
stopped inside the shaft 3, and the auxiliary machine 2 is withdrawn from its hollow
cavern 11. This situation is shown in a diagrammatic manner in Fig. 2 and Fig. 3 and
Fig. 4 of the drawings.
[0019] As shown in the drawings, a group of segments to take the reaction force is required
to launch the auxiliary machine 2 out of the main machine 1. Hence, a reaction force
bearing block is set inside the main machine 1 within which the segments are assembled.
The jack presses against the segments to propel the auxiliary machine 2 forward. Thereafter,
only the auxiliary machine 2 is used to excavate the portion of smaller cross sectional
area, for example the track portion up to the next station.
[0020] As indicated in Fig. 1 of the drawings, the main machine 1 from which the auxiliary
machine 2 has been withdrawn, remains inside the shaft 3 and is then pulled up to
the surface. Then, the main machine 1 is transported over land to the start of the
next portion of large cross sectional area, in particular the next station portion.
At that point, the main machine 1 is lowered down another pre-built shaft 3 where
it remains on standby until the arrival of the auxiliary machine 2. This situation
is shown, for example, in Fig. 5 of the drawings. The transport and standby action
is repeated in sequence for each of the shafts 3 provided along the underground construction.
[0021] In a first embodiment according to the invention, the main machine 1 is transported
in one piece as indicated in Fig. 1. However, the invention is not limited to such
a concept, rather the main machine needs not be transported in one piece. It can be
temporarily dismantled into several segments which are then carried to the next shaft
where the main machine 1 is re-assembled. This situation is shown, for example, in
Fig. 6 of the drawings.
[0022] In the meantime, the auxiliary machine 2 completes excavation of the portion of smaller
cross sectional area, for example the track portion, and arrives at the shaft 3 of
the next station, see Fig. 5 of the drawings. It is then inserted into the hollow
cavern 11 of the main machine 1 which has been on standby. At this point, the main
machine 1 and the auxiliary machine 2 become immediately a monolithic unit which is
used to excavate another station portion of larger diameter than the portion of the
tracks.
[0023] Such a configuration enables an immediate adjustment to a change in the cross section
area of the portion being excavated. When the combined apparatus comprising the main
machine 1 and the auxiliary machine 2 reaches the end of the station portion where
the cross sectional area is reduced again to that of the jack portion, the auxiliary
machine 2 is launched out of the main machine 1. These processes are then repeated
over the length of the whole underground construction, for example the subway line.
[0024] The above description has been made with respect to an example of the excavation
for a subway system having a circular cross section. However, as mentioned above,
the cross section needs not be circular. Rather, various types of non-cylindrical
shield excavators have already been developed and are in practical use, and the invention
and the apparatus according to the invention can readily be applied to such shields.
Also, while the above example relates to the excavation of the station and track portions
of a subway, the invention is by no means restricted to a subway. Rather, it can be
applied to the excavation of any other types of underground structures of variable
cross sectional area.
[0025] Hence, the main machine 1 and the auxiliary machine 2 can be used in various combinations
as explained hereinafter. The technology and devices used in excavating elliptical,
rectangular, oval, horseshoe-shaped and other tunnels of variable cross section employ
copy cutters, swing cutters, planet cutters and other cutters which are known as such
so that a detailed explanation is omitted here. Such combinations and configurations
will be explained shortly with reference to Fig. 7 to Fig. 15 of the drawings. In
this connection, the black portions identified by the reference signs 31 in Fig. 7
to Fig. 15 represent telescopic cutters.
[0026] Fig. 7 shows a constellation using a circular main machine 1 in which an auxiliary
machine 2 is housed having an elliptical shape in cross section.
[0027] Fig. 8 shows a constellation with an elliptical main machine 1 housing a circular
auxiliary machine 2.
[0028] In the constellation according to Fig. 9, the main machine 1 has a circular shape,
whereas the shape of the auxiliary machine 2 is rectangular.
[0029] Fig. 10 shows a configuration where the main machine 1 is of rectangular cross section,
whereas the auxiliary machine 2 housed therein has a circular shape.
[0030] Fig. 11 shows a configuration where the main machine 1 is of rectangular shape, wherein
an auxiliary machine 2 of rectangular shape is housed therein.
[0031] Fig. 12 shows a configuration where the main machine 1 has an elliptical shape, and
the auxiliary machine 2 housed therein has also an elliptical shape.
[0032] Fig. 13 shows a specific configuration where the main machine 1 is crescent-shaped,
whereas the auxiliary machine 2 is of circular shape.
[0033] Fig. 14 shows another specific configuration where the main machine 1 is of elliptical
shape, whereas two auxiliary machines 2 of cylindrical shape are housed therein.
[0034] Finally, Fig. 15 shows a configuration where the main machine 1 is of circular shape,
wherein the auxiliary machine 2 is also of circular shape but mounted in an excentric
manner.
[0035] With the method according to the invention, various advantages can be achieved when
excavating the ground for an underground structure of variable cross section.
a) Excavation for an underground structure for which the cross section changes repeatedly
from a first shape to another shape can be performed using one main machine 1 and
one auxiliary machine 2 which can be housed one inside of the other. Therefore, excavation
can be carried out in an extremely economical manner.
b) Excavation in such a case requires only a narrow vertical shaft 3 to be built at
those points where the cross section changes from the large cross section to the smaller
cross section and vice versa. This eliminates the need of digging the portions of
large cross sectional area from the surface to underground. Therefore, the method
according to the invention are particularly suitable for urban centers where land
usage is highly limited.
c) The main machine 1 can be left on standby at the shaft 3 where the auxiliary machine
2 will arrive. When the auxiliary machine 2 has arrived, it can readily be housed
inside the hollow cavern 11 of the main machine 1, and immediately thereafter excavation
can proceed with the main machine 1 and the auxiliary machine 2 interlocked with each
other as a monolithic unit. In other words, interlocking of the main machine 1 and
the auxiliary machine 2 or the separation of the main machine 1 from the auxiliary
machine 2 can readily be performed, requiring no special operation and no huge space,
which results in a good efficiency.
d) Excavation of the large cross section tunnel can start immediately after the auxiliary
machine 2 has been inserted into the main machine 1 which is on standby. On the other
hand, excavation of the small cross section tunnel can start just by removing the
auxiliary machine 2 from the main machine 1. This efficiency is possible because of
a configuration in which the main machine 1 is on standby waiting for the arrival
of the auxiliary machine 2. In any case, excavation proceeds by inserting the auxiliary
machine 2 into or withdrawing it from the main machine 1. Due to this rapid change
in operating cross section, the method according to the invention are outstanding
over conventional techniques.
1. A method of excavation for underground structures of variable cross sectional area,
in which
- a shield excavator of large cross sectional area is used as a main machine (1);
and
- another shield excavator of smaller cross sectional area than the main machine (1)
is used as an auxiliary machine (2) ;
wherein that portion of the underground structure of large cross section is excavated
using the main machine (1) with the auxiliary machine (2) housed inside and operating
jointly, whereas for that portion of the underground structure of small cross section,
the auxiliary machine (2) is advanced out of the main machine (1) and excavation proceeds
with the auxiliary machine (2) only;
characterized in that the main machine (1) is positioned on standby at the starting point of the next portion
of the structure of large cross section, while the auxiliary machine (2) proceeds,
and
in that when the auxiliary machine (2) reaches this starting point of the next portion, it
is re-inserted into the main machine (1), whereupon excavation proceeds again using
the main machine (1) with the auxiliary machine (2) housed inside.
2. The method according to claim 1,
wherein a vertical shaft (3) is built at the starting point of the respective next
portion of the structure of large cross section,
and wherein the main machine (1) without the auxiliary machine (2) is left on standby
at the corresponding shaft (3).
3. The method according to claim 1 or 2,
wherein the main machine (1) without the auxiliary machine (2) is disassembled and
transported to the site of the next portion of the structure of large cross section,
where it is re-assembled and left on standby at a corresponding shaft (3).
4. The method according to any of claims 1 to 3,
wherein a shield excavator of a cross sectional area virtually equal to the cross
sectional area of a station portion of a subway system is used as the main machine
(1),
wherein another shield excavator of a cross sectional area virtually equal to the
track portion of the subway system is used as an auxiliary machine (2).
1. Aushubverfahren für unterirdische Konstruktionen mit variabler Querschnittsfläche,
wobei
- eine Schildaushubmachine mit großer Querschnittsfläche als Hauptmaschine (1) verwendet
wird; und
- eine weitere Schildaushubmaschine mit kleinerer Querschnittsfläche als die Hauptmaschine
(1) als Zusatzmaschine (2) verwendet wird;
wobei der Bereich der unterirdischen Konstruktion mit großem Querschnitt unter Verwendung
der Hauptmaschine (1) ausgehoben wird, wobei sich die Zusatzmaschine (2) im Inneren
befindet und gemeinsam damit arbeitet, während für den Bereich der unterirdischen
Konstruktion mit kleinem Querschnitt die Zusatzmaschine (2) aus der Hauptmaschine
(1) ausgefahren und der Aushub nur mit der Zusatzmaschine (2) fortgesetzt wird;
dadurch gekennzeichnet,
daß die Hauptmaschine (1) am Startpunkt des nächsten Bereichs der Konstruktion mit großem
Querschnitt in Warteposition positioniert wird, während die Zusatzmaschine (2) in
der Zwischenzeit weiterarbeitet,
und
daß dann, wenn die Zusatzmaschine (2) diesen Startpunkt des nächsten Bereichs erreicht,
sie wieder in die Hauptmaschine (1) eingefahren wird, woraufhin der Aushub wiederum
unter Verwendung der Hauptmaschine (1) mit der darin aufgenommenen Zusatzmaschine
(2) fortgesetzt wird.
2. Verfahren nach Anspruch 1,
wobei ein vertikaler Schacht (3) am Startpunkt des jeweiligen nächsten Bereichs der
Konstruktion mit großem Querschnitt gebaut wird,
und wobei die Hauptmaschine (1) ohne die Zusatzmaschine (2) in dem entsprechenden
Schacht (3) in Warteposition zurückgelassen wird.
3. Verfahren nach Anspruch 1 oder 2,
wobei die Hauptmaschine (1) ohne die Zusatzmaschine (2) demontiert und zum Ort des
nächsten Bereichs der Konstruktion mit großem Querschnitt transportiert wird, wo sie
wieder zusammengebaut und in einem entsprechenden Schacht (3) in Warteposition zurückgelassen
wird.
4. Verfahren nach einem der Ansprüche 1 bis 3,
wobei eine Schildaushubmaschine mit einer Querschnittsfläche, die praktisch gleich
der Querschnittsfläche eines Haltestellenbereichs eines U-Bahnsystems ist, als Hauptmaschine
(1) verwendet wird,
wobei eine weitere Schildaushubmaschine mit einer Querschnittsfläche, die praktisch
gleich dem Gleisbereich des U-Bahnsystems ist, als Zusatzmaschine (2) verwendet wird.
1. Procédé d'excavation de structures souterraines d'une surface variable en section
transversale, dans lequel
- un excavateur à bouclier d'une grande surface en section transversale est utilisé
comme machine principale (1) ; et
- un autre excavateur à bouclier d'une surface plus petite en section transversale
que la machine principale (1) est utilisé comme machine auxiliaire (2) ;
où cette portion de la structure souterraine d'une grande section transversale
est creusée en utilisant la machine principale (1), la machine auxiliaire (2) étant
logée à l'intérieur et fonctionnant conjointement, tandis que pour la portion de la
structure souterraine d'une petite section transversale, la machine auxiliaire (2)
est sortie de la machine principale (1), et l'excavation progresse avec la machine
auxiliaire (2) seulement ;
caractérisé en ce que la machine principale (1) est mise dans une position d'attente au point de départ
de la prochaine portion de la structure d'une grande section transversale, tandis
que la machine auxiliaire (2) avance,
et
en ce que, lorsque la machine auxiliaire (2) atteint ce point de départ de la prochaine portion,
elle est réinsérée dans la machine principale (1), à la suite de quoi l'excavation
progresse de nouveau en utilisant la machine principale (1), la machine auxiliaire
(2) étant logée à l'intérieur.
2. Procédé selon la revendication 1, où un arbre vertical (3) est construit au point
de départ de la prochaine portion respective de la structure d'une grande section
transversale,
et où la machine principale (1) sans la machine auxiliaire (2) est laissée en attente
à l'arbre correspondant (3) .
3. Procédé selon la revendication 1 ou 2, dans lequel la machine principale (1) sans
la machine auxiliaire (2) est démontée et transportée au site de la prochaine portion
de la structure d'une grande section transversale, où elle est de nouveau assemblée
et mise en attente à un arbre correspondant (3) .
4. Procédé selon l'une des revendications 1 à 3, dans lequel un excavateur à bouclier
d'une zone en section transversale virtuellement égale à la zone en section transversale
d'une portion de station d'un système de chemin de fer souterrain est utilisé comme
machine principale (1), où un autre excavateur à bouclier d'une zone en section transversale
virtuellement égale à la portion de voie du système de chemin de fer souterrain est
utilisée comme machine auxiliaire (2).