(19)
(11) EP 0 992 635 B2

(12) NEW EUROPEAN PATENT SPECIFICATION
After opposition procedure

(45) Date of publication and mentionof the opposition decision:
29.07.2009 Bulletin 2009/31

(45) Mention of the grant of the patent:
10.03.2004 Bulletin 2004/11

(21) Application number: 99119283.2

(22) Date of filing: 28.09.1999
(51) International Patent Classification (IPC): 
E03F 7/10(2006.01)
F04B 49/06(2006.01)
F04B 49/00(2006.01)
B08B 9/02(2006.01)

(54)

Equipment for suction and high pressure cleaning optimised by a logic unit

Von einer logischen Einheit optimierte Anlage zum Saug- und Hochdruckreinigen

Equipement de nettoyage à aspiration et à haute pression optimisé par une unité logique


(84) Designated Contracting States:
AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

(30) Priority: 05.10.1998 IT MI982133

(43) Date of publication of application:
12.04.2000 Bulletin 2000/15

(73) Proprietor: Jurop S.p.A.
33082 Azzano Decimo (Prov. of Pordenone) (IT)

(72) Inventor:
  • Santarossa, Danilo
    33082 Corva - Azzano Decimo (Pordenone) (IT)

(74) Representative: Gervasi, Gemma et al
Notarbartolo & Gervasi S.p.A. Corso di Porta Vittoria, 9
20122 Milano
20122 Milano (IT)


(56) References cited: : 
EP-A- 0 234 652
DE-A- 2 813 713
DE-C- 4 412 480
GB-A- 1 460 218
US-A- 4 322 868
EP-A- 0 616 087
DE-A- 19 541 950
FR-A- 2 454 002
US-A- 4 134 174
   
  • VDI VERLAG: UMWELT July 1995 - August 1995, pages 26 - 27
   


Description

Field of the invention.



[0001] The invention consists in an equipment for suction and high pressure cleaning, in which the revolution speed of the vacuum pump, that creates and maintains a set degree of vacuum inside the drained liquid collection tank, is independent of the revolution speed of the pressure pump that supplies water at high pressure for cleaning; moreover the number of revolutions of at least one of the pumps is independent of that of the engine which drives the pumps.

[0002] At least one of the pumps is connected to the engine by means of variable speed power transmissions, controlled by a logic unit which maintains the engine at the minimum number of revolutions necessary to supply the energy required by the pumps.

Prior art



[0003] Equipment for suction and high pressure cleaning are lorries equipped with a drained liquid collection tank and with a series of tools whose functions may be summed up in two:

firstly to suck away the liquid to be drained (using a vacuum pump in order to create and maintain a set degree of vacuum inside the collection tank), and

secondly to supply, by means of a pressure pump (preferably but not necessarily a piston pump), a set quantity of water at relatively high pressure (between 70 and 300 bar ca.) in order to clean pipelines, sewers, drains, etc.



[0004] The power needed to drive this tools and to obtain the above mentioned functions is supplied by the vehicle's engine, or alternatively by an auxiliary engine.

[0005] In currently known suction equipments the transfer of power from the engine (either the vehicle's or the auxiliary) to the vacuum and pressure pumps is made by means of either mechanical or hydraulic fixed ratio transmissions: hence a set number of revolutions of the engine corresponds to a set number of revolutions of the vacuum and pressure pumps.

[0006] The vacuum and pressure pumps' number of revolutions may be different from each other, but the number of revolutions ratio both between the pumps and between each pump and the engine remains constant: if for example, the number of revolutions of the engine is reduced by 50% the revolution speed of the pumps is also reduced by 50%.

[0007] The pumps may obviously be stopped independently of one another using hydraulic or mechanical systems not here described because already well known.

[0008] Fixed ratio transmissions involve numerous drawbacks, among which the following:
  • the engine, dimensioned for supplying the maximum power required by the two pumps, works at the same revolution speed even when only one of the pumps is in use, creating a net loss in efficiency.
  • if the job being undertaken necessitates the use of only one of the pumps at the maximum number of revolutions, the second pump is also unnecessarily compelled to work at the same speed: the excess energy absorbed by the second pump is dissipated in the form of heat, reducing the system's effective efficiency;
  • the person employed to operate the suction equipment, aware of being unable to do otherwise and accustomed to waste, usually maintains the equipment (and consequently the engine) at maximum revolution speed.
  • such behaviour by the employee causes an increase in running costs due to waste in fuel and lubricant, accelerates wear in all mobile mechanical parts (engine, pumps, transmissions, etc.) and involves an often relevant environmental impact, due to an excessive and unjustified emission of gas and noise.


[0009] The applicant has produced a suction equipment able to overcome such drawbacks because it is managed by a logic unit, which regulates both the number of revolutions of each pump (or at least of one of the pumps) and that of the engine, in order to satisfy the specific requirements of the moment.

Summary of the invention.



[0010] The subject of this invention is a suction equipment optimised by means of a logic unit, (comprising at least one drained liquid collection tank, a tank for cleaning water, a vacuum pump to create and maintain a set degree of vacuum inside the collection tank, a pressure pump to supply water at high pressure for cleaning and an engine to drive the two pumps) in which the revolution speed of the pressure pump is independent of that of the vacuum pump, and the revolution speed of at least one of the pumps is independent of that of the engine: at least one of the pumps is driven by the engine by means of variable speed power transmissions controlled by a logic unit, which maintains the engine at the minimum number of revolutions necessary in order to supply the total power required by the two pumps.

List of figures.



[0011] The invention will now be better explained in reference to an example, (to be considered only one possible embodiment) shown in the attached figures where:
  • figure 1 shows a schematic block diagram of a suction equipment according to the invention.
  • figure 2 shows a schematic flow diagram, illustrating the sequence of functional steps performed by the logic unit in order to manage the vacuum pump and the engine.
  • figure 3 shows a schematic flow diagram, illustrating the sequence of functional steps performed by the logic unit in order to manage the pressure pump and the engine.
  • figure 4 shows a schematic flow diagram, illustrating the sequence of functional steps performed by the logic unit in order to manage the engine if the pressure pump is directly driven by the engine.
  • figure 5 shows a schematic form of a flow diagram, illustrating the sequence of functional steps performed by the logic unit in order to manage the vacuum pump and the engine if the pressure pump is directly driven by the engine.
  • figure 6 shows a schematic flow diagram, illustrating the sequence of functional steps performed by the logic unit in order to manage the engine if the vacuum pump is directly driven by the engine.
  • figure 7 shows a schematic flow diagram, illustrating the sequence of functional steps performed by the logic unit in order to manage the pressure pump and the engine if the vacuum pump is directly driven by the engine.


[0012] In the enclosed figures, the same alphanumeric references are used to identify the same items.

Detailed description.



[0013] Figure 1 shows a block diagram representing a preferred embodiment of a suction equipment according to the invention, which is composed of at least, combined each other, a drained liquid collection tank C, a vacuum pump PV to create and maintain a set degree of vacuum inside the collection tank C, a pressure pump PP to supply at high pressure cleaning water (held in the appropriate section of the collection tank C, shown in figure 1 by a dotted line or alternatively in a separate tank) and an engine M to drive the two pumps (PP,PV). In figure 1 some elements have been omitted in order to simplify the block diagram, such as the suction boom, the high pressure gun, the valves, etc. normally found in suction equipment but not used by this invention.

[0014] In the suction equipment illustrated in figure 1 the engine M, the vacuum pump PV, and the pressure pump PP are managed by a logic unit UL which regulates the number of revolutions of the engine M, of the pressure pump PP and of the vacuum pump PV in order to satisfy the specific requirements of the moment.

[0015] In particular, the logic unit UL manages the pressure pump PP, the vacuum pump PV and the engine M so that the revolution speed of the pressure pump PP is independent of that of the vacuum pump PV and the revolution speed of the said pumps PP and PV is independent of the revolution speed of the engine M.

[0016] Without sorting from the scope of the invention it is possible to substitute the logic unit UL of figure 1, suitable to manage both the pumps (PP,PV) and the engine, with a pair of logic units, each of which manages one of the pumps (PP,PV) and possibly the engine M.

[0017] The pressure pump PP and the vacuum pump PV are driven by the engine M by means of variable speed power transmissions (TP, respectively TV, indicated in figure 1 with dotted lines) controlled by the logic unit UL, whose output speed may be varied continuously from zero to a maximum value.

[0018] This allows the pumps PP and PV to work independently of one another and at variable speed, so optimising their efficiency.

[0019] Furthermore the logic unit UL maintains the engine M at the minimum number of revolutions necessary to supply the power requested by the pumps PP and PV.

[0020] The working of the logic unit will be better described with reference to the flow diagrams shown in figures 2 and 3, to be considered only one possible example.

[0021] According to the embodiment shown in figure 1, each of the variable speed power transmissions (respectively TP and TV) includes an oil engine (respectively MP and MV) which is driven by a variable volume oil pump (respectively PVP and PW): the variable volume oil pump (respectively PVP and PW) is driven by the engine M, while the oil engine (respectively MP and MV) drives a pump (respectively PP and PV).

[0022] Without sorting from the scope of the invention it is moreover possible to substitute at least one of the variable speed power transmissions (TP,TV) described above, with other similar systems not described here as they are already well known.

[0023] In another possible embodiment of the invention, one of the two pumps (PP,PV) is directly driven by the engine M and the logic unit UL manages the engine M and the other pump by controlling the relative variable speed power transmissions (TP,TV), while the output speed of the variable speed transmissions to the pump directly driven by the engine M is maintained at a predetermined value, for example, by maintaining the variable speed power transmission's variable volume oil pump (PVP,PVV) at a predetermined value.

[0024] Always without sorting from the scope of the invention, the pump connected directly to the engine M could be driven by traditional mechanical coupling means instead of by the variable speed power transmissions (respectively TP and TV).

[0025] The operations performed by the logic unit if the pressure pump PP is directly driven by the engine M will be better explained with reference to the flow diagrams shown in figures 4 and 5 (to be considered only one possible example); figures 6 and 7 show flow diagrams illustrating the operations performed by the logic unit UL if, for example, the vacuum pump is directly driven by the engine M.

[0026] The pressure pump PP, the vacuum pump PV, the variable volume oil pumps PVP and PVV and the oil engines MP and MV are commercially sold apparatus well known by persons skilled in the art, and will not therefore be described here: to give only some possible examples, the pressure pump PP could be a PRATISSOLI model MS45 or a WOMA model 1503, the vacuum pump PV could be a JUROP model PR250 or a DEMAG model RFW250; the variable volume oil pump PVP could be a PARKER model PV130, the variable volume oil pump PW could be a PARKER model PV080, the oil engine MP could be a PARKER model F110 and the oil engine MV a PARKER model F080.

[0027] The logic unit UL regulates the revolution speed of the oil engine MV that drives the vacuum pump PV, respectively of the oil engine MP that drives the pressure pump PP by modifying (through commands CV and CP respectively) the delivery of the corresponding variable volume oil pump (respectively PVV and PVP) according to a given parameter.

[0028] For the vacuum pump PV this parameter is the difference between a predetermined value Vo (memorised into the logic unit UL and regulated as necessary) of degree of vacuum inside the collection tank C and the value (V) measured inside the collection tank by a first sensor SV; for the pressure pump PP this parameter is the difference between a predetermined value Po (memorised into the logic unit UL and regulated as necessary) of the delivery pressure of the pressure pump PP and the value (P) measured by a second sensor SP.

[0029] According to the power absorbed moment by moment by the pumps (PP,PV) and by their relative variable speed power transmissions (TP,TV), the logic unit UL modifies the running speed of the engine M in an usual way (using command CM) in order to bring it to the minimum number of revolutions necessary to produce the power required and modifies through commands (respectively CP and CV) dispatched to the variable speed power transmissions (respectively TP and TV) the ratio between the number of revolutions made by the engine M and that made by each of the pumps (PP,PV), in order to constantly maintain each pump (PP,PV) at the revolution speed necessary to the specific working condition, and the engine M at the minimum number of revolutions necessary to supply the power absorbed by the pumps (PP,PV) and their relative variable speed power transmissions (TP,TV).

[0030] Finally, in figure 1 block T is a schematic representation of the equipment's control panel including at least means to activate and deactivate the pressure and vacuum pumps (PP,PV) and possibly means to initialise the logic unit UL.

[0031] Figure 2 shows a schematic flow diagram, illustrating the sequence of steps schematically performed by the logic unit UL in order to manage the vacuum pump PV and the engine M.

[0032] Following an initialisation step, if any (step 1), the logic unit UL verifies (step 20) if the vacuum pump PV is activated: if the vacuum pump PV is not activated the logic unit UL verifies (step 21) if the pressure pump PP is activated.

[0033] If the pressure pump PP is activated the logic unit UL lowers to zero (step 22) the delivery CLV of the variable volume pump PVV using the command CV, and passes (reference P) to manage the engine M and the pressure pump PP (step 30; figure 3). Otherwise the logic unit UL lowers to zero (step 23) the delivery CLV of the variable volume pump PVV using the command CV, and brings the number of revolutions GM of the engine M to a predetermined minimum value GMmin, before returning to stand by condition (step 40).

[0034] As the response times of the mechanical parts utilised in suction equipment are in the order of several seconds, and in any case much greater than the milliseconds needed by the logic unit UL to carry out one or more functional steps, the fact that the logic unit UL, when it abandons the management procedure in progress (for example that of the vacuum pump PV), always returns to beginning of the management procedure for the engine M and for the other pump (the pressure pump PP) does not involve delays or pauses in the management of the engine M and/or of the two pumps (PV PP), and is not therefore detrimental to the efficiency of a suction equipment realised according to the invention.

[0035] If the vacuum pump PV is activated, the logic unit UL verifies (step 24) that the predetermined value of degree of vacuum Vo is greater than value V (measured by sensor SV) minus a first predetermined quantity K1, but lower than said value V plus a second predetermined quantity K2, and waits (step 25) for a time t6 before passing to manage the engine M and the pressure pump PP (step 30, figure 3). Otherwise the logic unit UL verifies (step 26) that the predetermined value of degree of vacuum Vo is not greater than said value V minus the first predetermined quantity K1, before verifying (step 27) if the predetermined degree of vacuum Vo is lower than the said value V plus the second predetermined quantity K2.

[0036] If the predetermined value of degree of vacuum Vo is greater than the said value V (measured by sensor SV) minus the first predetermined quantity K1, the logic unit UL verifies (step 28) that the delivery CLV of the variable volume pump PVV is lower than 100%, before increasing it using command CV by a predetermined quantity dc (step 29) and waiting (step 201) for a predetermined time t2, before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0037] Otherwise the logic unit UL verifies (step 202) that the number of revolutions GM of the engine M is lower than a predetermined maximum value GMmax, and that the number of revolutions GPVof the vacuum pump PV is lower than a predetermined maximum value GPVmax, before using command CM (step 203) to increase the number of revolutions GM of the engine M by a predetermined quantity dg, and waits (step 204) for a predetermined time t1, before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0038] If the number of revolutions GM of the engine M is not lower than the predetermined maximum value GMmax, and/or if the number of revolutions GPV of the vacuum pump PV is not lower than the predetermined maximum value GPVmax, the logic unit UL verifies (step 27) that the predetermined value Vo of degree of vacuum is not lower than value V (measured by sensor SV) plus the second predetermined quantity K2, before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0039] If the predetermined value Vo of degree of vacuum is lower than the said value V plus the second predetermined value K2, the logic unit UL verifies (step 205) that the number of revolutions GM of the engine M is not greater than the predetermined minimum number of revolutions GMmin, before using command CV to reduce (step 206) the delivery CLV of the variable volume pump PVV by the predetermined quantity dc and waits (step 207) for a predetermined time t3 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0040] If the number of revolutions GM of the engine M is greater than the predetermined minimum value GMmin, the logic unit UL verifies (step 208) that the pressure pump PP is activated and that the delivery CLP of the variable volume pump PVP is greater than 99%, before using command CV to reduce (step 209) the delivery CLV of the variable volume pump PVV by the predetermined quantity dc, and waits (step 210) for a predetermined time t5 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0041] Otherwise the logic unit UL uses the command CM (step 211) to reduce the number of revolutions GM of the engine M by the predetermined quantity dg, and waits (step 212) for a predetermined time t4, before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0042] Preferably but not necessarily:

the first predetermined quantity K1 is of about 0.01 bar (and in any case between 0 and 0.08 bar, about), the second predetermined quantity K2 is of about 0.08 bar (and in any case between 0 and 0.3 bar, about);

the waiting times t1 and t2 are of about 0.4 seconds (and in any case between 0 and 60 seconds, about), the waiting times t3, t4 and t5 are of about 0.3 seconds (and in any case between 0 and 60 seconds, about), and waiting time t6 is of about 0.5 seconds (and in any case between 0 and 60 seconds, about).

the maximum number of revolutions, GPVmax, of the vacuum pump PV is of about 1100 rpm. (and in any case between 500 and 5000 rpm., about).



[0043] Furthermore:

the minimum number of revolutions GMmin of the engine M is of about 650 rpm. (and in any case between 100 and 1500 rpm., about), the maximum number of revolutions GMmax of the engine M is of about 1050 rpm. (and in any case between 500 and 4000 rpm., about), the increasing/decreasing step dg of the number of revolutions GM of the engine M is of about 30 rpm. (and in any case between 1 and 250 rpm., about).

the increasing/decreasing step dc of the delivery (respectively CLV and CLP) of each of the variable volume pumps (respectively PVV and PVP) is of about 2% (and in any case between 0.1% and 50%, about).



[0044] Figure 3 shows a schematic flow diagram, illustrating the sequence of functional steps carried out by the logic unit UL in order to manage the pressure pump PP and the engine M.

[0045] Following an initialisation step, if any (step 1), the logic unit UL verifies (step 30) if the pressure pump PP is activated: if the pump PP is not activated the logic unit UL verifies (step 31) if the vacuum pump PV is activated.

[0046] If the vacuum pump PV is activated, the logic unit UL uses the command CP for lowering to zero (step 32) the delivery CLP of the variable volume pump PVP, and passes (reference V) to manage the engine M and the vacuum pump PV (step 20, figure 2). Otherwise the logic unit UL uses the command CP for lowering to zero (step 33) the delivery CLP of the variable volume pump PVP and brings (using command CM) the number of revolutions GM of the engine M to a predetermined minimum value GMmin, before returning to stand by condition (step 40).

[0047] If the pressure pump PP is activated, the logic unit UL verifies (step 34) that the predetermined value Po of the delivery pressure of the pump PP is greater than the value P (measured by sensor SP) minus a third predetermined quantity K3, but lower than said value P plus a fourth predetermined quantity K4, and waits (step 35) for a time t12, before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0048] Otherwise the logic unit UL verifies (step 36) that the predetermined value Po of the delivery pressure of the pressure pump PP, is not greater than the said value P minus the third predetermined quantity K3, before verifying (step 37) if the predetermined value Po of the delivery pressure of the pump PP is lower than said value P plus the fourth predetermined quantity K4.

[0049] If the predetermined value Po of delivery pressure of the pump PP is greater than said value P (measured by sensor SP) minus the third predetermined quantity K3, the logic unit UL verifies (step 38) that the delivery CLP of the variable volume pump PVP is lower than 100%, before using command CP to increase it (step 39) by the predetermined quantity dc and waits (step 301) for a predetermined time t8, before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0050] Otherwise the logic unit UL verifies (step 302) that the number of revolutions GM of the engine M is lower than the predetermined maximum value GMmax, and that the number of revolutions GPP of the pressure pump PP is lower than the predetermined maximum value GPPmax, before using command CM to increase (step 303) the number of revolutions GM of the engine M by the predetermined quantity dg, and waits (step 304) for a predetermined time t7, before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0051] If the number of revolutions GM of the engine M is not lower than the predetermined maximum value GMmax, and/or the number of revolutions GPP of the pressure pump PP is not lower than the predetermined maximum value GPPmax, the logic unit UL verifies (step 37) that the predetermined value Po of the delivery pressure of the pump PP is not lower than the value P (measured by sensor SP) plus the fourth predetermined quantity K4 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0052] If the predetermined value Po of the delivery pressure of the pressure pump PP is lower than said value P plus the fourth predetermined value K4, the logic unit UL verifies (step 305) that the number of revolutions GM of the engine M is not greater than the predetermined minimum value GMmin, before using command CP (step 306) to reduce the delivery CLP of the variable volume pump PVP by the predetermined quantity dc and waits (step 307) for a predetermined time t9, before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0053] If the number of revolutions GM of the engine M is greater than the predetermined minimum value GMmin, the logic unit UL verifies (step 38) that the vacuum pump PV is activated, and that the delivery CLV of the variable volume pump PVV is greater than 99%, before using command CP (step 309) to reduce the delivery CLP of the variable volume pump PVP by the predetermined quantity dc and waits (step 310) for a predetermined time t11, before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0054] Otherwise the logic unit UL uses command CM (step 311) to reduce the number of revolutions GM of the engine M by the predetermined quantity dg and waits for a predetermined time t10 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0055] Preferably but not necessarily:

the third predetermined quantity K3 is of about 5 bar (and in any case between 0 and 50 bar, about) and the fourth predetermined quantity K4 is of about 12 bar (and in any case between 0 and 50 bar, about);

waiting times t7 and t8 are of about 0.8 seconds (and in any case between 0 and 60 seconds, about);

waiting times t9, t10 and t11 are of about 0.4 seconds (and in any case between 0 and 60 seconds, about) and waiting time t12 is of about 0.5 seconds (and in any case between 0 and 60 seconds, about);

the maximum number of revolutions GPPmax of the pressure pump PP is of about 1450 rpm. and in any case between 400 and 2500 rpm., about.



[0056] Furthermore:

the minimum number of revolutions GMmin of the engine M is of about 650 rpm. (and in any case between 100 and 1500 rpm., about), the maximum number of revolutions GMmax of the engine M is of about 1050 rpm. (and in any case between 500 and 400_rpm., about) and the increasing/decreasing step dg of the number of revolutions GM of the engine M is of about 30 rpm. (and in any case between 1 and 250 rpm.,about);

increasing/decreasing step dc of the delivery (respectively CLV and CLP) of each of the variable volume pumps (respectively PW and PVP) isof about 2% and in any case between 0.1% and 50%, about.



[0057] Figure 4 shows a schematic flow diagram, illustrating the sequence of functional steps carried out by the logic unit UL to manage the engine M if the pressure pump PP is directly driven by the engine M; in this flow diagram (obtained from that of figure 3 by omitting the functional steps with which the logic unit UL verifies or modifies the delivery CLP of the variable volume pump PVP), the functional steps shall be identified using the same references used in figure 3.

[0058] Following an initialisation step (step 1), during which the logic unit UL acquires the predetermined value of output speed of the variable speed power transmissions TP (if present), for example by acquiring a predetermined value of delivery for the variable volume oil pump PVP, the logic unit UL verifies (step 30) if the pressure pump PP is activated: if the pressure pump PP is not activated the logic unit UL verifies (step 31) if the vacuum pump PV is activated.

[0059] If the vacuum pump PV is activated, the logic unit UL passes (reference V) to manage the engine M and the vacuum pump PV (step 20, figure 2). Otherwise the logic unit UL (using command CM, step 313) brings the number of revolutions GM of the engine M to the predetermined minimum value GMmin, before returning to stand by condition (step 40).

[0060] If the pressure pump PP is activated the logic unit UL verifies (step 34) that the predetermined value Po of the delivery pressure of the pump PP is greater than value P (measured by sensor SP) minus a third predetermined quantity K3, but lower than said value P plus a fourth predetermined quantity K4 and waits (step 35) for a predetermined time t12 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0061] Otherwise the logic unit UL verifies (step 36) that the predetermined value of delivery pressure Po of the pump PP is not greater than the said value P minus the third predetermined quantity K3 before verifying (step 37) if the predetermined value of delivery pressure Po of the pump PP is lower than said value P plus the fourth predetermined quantity K4.

[0062] If the predetermined value of delivery pressure Po of the pump PP is greater than the said value P (measured by sensor SP) minus the third predetermined quantity K3, the logic unit UL verifies (step 302) that the number of revolutions of the engine M is lower than the predetermined maximum value GMmax, and that the number of revolutions GPP of the pressure pump PP is lower than the predetermined maximum value GPPmax before using command CM (step 303) to increase the number of revolutions GM of the engine M by the predetermined quantity dg and waits (step 304) for a predetermined time t7 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0063] If the number of revolutions GM of the engine M is not lower than the predetermined maximum value GMmax, and/or the number of revolutions GPP of the pressure pump PP is not lower than the predetermined maximum value GPPmax, the logic unit UL verifies (step 37) that the predetermined value of delivery pressure Po of the pressure pump PP is not lower than value P (measured by sensor SP) plus the fourth predetermined quantity K4 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0064] If the predetermined value of delivery pressure Po of the pump PP is lower than said value P plus the fourth predetermined quantity K4, the logic unit UL verifies (step 305) that the number of revolutions GM of the engine M is not greater than the predetermined minimum value GMmin and waits (step 307) for a predetermined time t9 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0065] If the number of revolutions GM of the engine M is greater than the predetermined minimum value GMmin, the logic unit UL verifies (step 308) that the vacuum pump PV is activated and that the delivery CLV of the variable delivery pump PVV is greater than 99% and waits (step 310) for a predetermined time t11 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0066] Otherwise the logic unit UL uses command CM (step 311) to reduce the number of revolutions GM of the engine M by the predetermined quantity dg and waits (step 312) for a predetermined time t10 before passing to manage the engine M and the vacuum pump PV (step 20, figure 2).

[0067] Preferably but not necessarily, the third and fourth predetermined quantities (K3, K4), the waiting times (t7, t9, t12), the maximum number of revolutions GPPmax of the pressure pump PP, the minimum number of revolutions (GMmin) and the maximum (GMmax) one of the engine M and the increasing/decreasing step dg of the number of revolutions GM of the engine M correspond to those previously indicated with reference to figure 3.

[0068] Figure 5 shows a schematic flow diagram, illustrating the sequence of functional steps carried out by the logic unit UL to manage the vacuum pump PV and the engine M if the pressure pump PP is directly driven by the engine M.

[0069] This flow diagram differs from that shown in figure 2 exclusively in that the logic unit UL, having verified (step 205) that the number of revolutions GM of the engine M is greater than the predetermined minimum value GMmin, passes to verify (step 213) that the pressure pump PP is activated before using command CV (step 209) to reduce the delivery CLV of the variable volume pump PW by the predetermined quantity dc or, alternatively, before using command CM (step 211) to reduce the number of revolutions GM of the engine M by the predetermined quantity dg.

[0070] Preferably but not necessarily, the first and second predetermined quantities (K1, K2), the waiting times (t1-t6), the maximum number of revolutions (GPVmax) of the vacuum pump PV, the minimum number of revolutions (GMmin) and the maximum (GMmax) one of the engine M, the increasing/decreasing step dg of the number of revolutions GM of the engine M and the increasing/decreasing dc of the delivery CLV of the variable volume pump PW correspond to those previously indicated with reference to figure 2.

[0071] Figure 6 shows a schematic flow diagram, illustrating the sequence of functional steps carried out by the logic unit UL to manage the engine M if the vacuum pump PV is directly driven by the engine M; in this flow diagram (obtained from that of figure 2 by omitting the functional steps with which the logic unit UL verifies or modifies the delivery CLV of the variable volume pump PW), the functional steps shall be identified using the same references as in figure 2.

[0072] Following an initialisation step (step 1), in which the logic unit UL acquires the predetermined value of output speed for the variable speed transmissions TV (if present), for example by acquiring a predetermined value of the delivery CLV of the variable volume oil pump PVV, the logic unit UL verifies (step 20) if the vacuum pump PV is activated: if the vacuum pump PV is not activated the logic unit UL verifies (step 21) if the pressure pump PP is activated.

[0073] If the pressure pump PP is activated, the logic unit UL (step 22) passes (reference P) to manage the engine M and the pressure pump PP (step 30, figure 3), otherwise (using command CM, step 213) it brings the number of revolutions GM of the engine M to a predetermined minimum value GMmin before returning to stand by condition (step 40).

[0074] If the vacuum pump PV is activated, the logic unit UL verifies (step 24) that the predetermined value of degree of vacuum Vo is greater than value V (measured by sensor SV) minus the first predetermined quantity K1, but lower than said value V plus a second predetermined quantity K2 and waits (step 25) for a time t6 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0075] Otherwise the logic unit UL verifies (step 26) that the predetermined value of degree of vacuum Vo is not greater than said value V minus the first predetermined quantity K1 before verifying (step 27) if the predetermined value of degree of vacuum Vo is lower than value V (measured by sensor SV) plus the second predetermined quantity K2.

[0076] If the predetermined value of degree of vacuum Vo is greater than the said value V (measured by sensor SV) minus the first predetermined quantity K1, the logic unit UL verifies (step 202) that the number of revolutions GM of the engine M is lower than a predetermined maximum value GMmax, and that the number of revolutions GPV of the vacuum pump PV is lower than a maximum value GPVmax, before using command CM to increase (step 203) the number of revolutions GM of the engine M by a predetermined quantity dg and waits (step 204) for a predetermined time t1 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0077] If the number of revolutions GM of the engine M is not lower than the predetermined maximum value GMmax, and/or if the number of revolutions GPV of the vacuum pump PV is not lower than the predetermined maximum value GPVmax, the logic unit UL verifies (step 27) that the predetermined value of degree of vacuum Vo is not lower than value V (measured by sensor SV) plus the second predetermined quantity K2 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0078] If the predetermined value of degree of vacuum Vo is lower than said value V plus the second predetermined quantity K2, the logic unit UL verifies (step 205) that the number of revolutions GM of the engine M is not greater than the predetermined minimum value GMmin and waits (step 207) for a predetermined time t3 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0079] If the number of revolutions GM of the engine M is greater than the predetermined minimum value GMmin, the logic unit UL verifies (step 208) that the pressure pump PP is activated and that the delivery CLP of the variable volume pump PVP is greater than 99% and waits (step 210) for a predetermined time t5 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0080] Otherwise the logic unit UL uses command CM (step 211) to reduce the number of revolutions GM of the engine M by the predetermined quantity dg and waits (step 212) for a predetermined time t4 before passing to manage the engine M and the pressure pump PP (step 30, figure 3).

[0081] Preferably but not necessarily the values of the first and second predetermined quantities (K1, K2), the waiting times (t1, t3-t6), the maximum number of revolutions GPVmax of the vacuum pump PV, the minimum number of revolutions (GMmin) and the maximum one (GMmax) of the engine M, the increasing/decreasing step dg of the number of revolutions GM of the engine M and the increasing/decreasing step dc of the delivery CLV of the variable volume pump PW correspond to those previously indicated with reference to figure 2.

[0082] Figure 7 shows a schematic flow diagram, illustrating the sequence of functional steps carried out by the logic unit UL in order to manage the pressure pump PP and the engine M, if the vacuum pump PV is directly driven by the engine M.

[0083] This flow diagram differs from that shown in figure 3 exclusively because the logic unit UL, having verified (step 305) that the number of revolutions GM of the engine M is greater than the predetermined minimum value GMmin, passes to verify (step 314) that the pressure pump PP is activated before using command CP (step 309) to reduce the delivery CLP of the variable volume pump PVP by the predetermined quantity dc. Or otherwise, the logic unit UL uses command CP (step 313) to reduce the number of revolutions GM of the engine M by the predetermined quantity dg.

[0084] Preferably but not necessarily the values for the third and fourth predetermined quantities (K3, K4), the waiting times (t7-t12), the maximum number of revolutions (GPPmax) of the pressure pump PP, the minimum number of revolutions (GMmin) and the maximum one (GMmax) of the engine M and the increasing/decreasing step dg of the number of revolutions GM of the engine M, correspond to those previously indicated in reference to figure 3.

[0085] Without sorting from the scope of the invention, the logic unit UL could be used moreover to manage suction equipment comprising only one pump (normally the vacuum pump) by carrying out one of the sequences of functional steps illustrated in the previous figures, in which the missing pump (respectively PP or PV) is considered by the logic unit UL to be permanently deactivated.

[0086] Always without sorting from the scope of the invention as defined by the appended claims, the suction and high pressure cleaning equipment here presented may be modified and upgraded by a technician, according to the techniques in every day use and their natural evolution.


Claims

1. A suction and high pressure cleaning equipment optimised by a logic unit, comprising the logic unit (UL)
at least one drained liquid collection tank,
a tank for cleaning water,
a vacuum pump to create and maintain a set degree of vacuum inside the collection tank,
a pressure pump to supply water at high pressure for cleaning, and
an engine to drive the two pumps,
the revolution speed of the pressure pump (PP) being independent of that of the vacuum pump (PV), and the revolution speed of at least one of the pumps (PP, PV) being independent of that of the engine (M),
at least one of the pumps (PP, PV) being driven by the engine (M) through variable speed power transmission means (TP, TV) suitable to continuously vary their output speeds, controlled by the logic unit (UL) which maintains the engine (M) at the minimum number of revolutions necessary to supply the power required by the pumps (PP, PV).
 
2. Suction equipment as in claim 1, characterized in that said variable speed power transmission means (TP, TV) are suitable to continuously vary their output speeds between 0 and a maximum value.
 
3. Suction equipment as in claim 2, characterized in that each of the variable speed power transmission means (TP, TV) includes an oil engine (respectively MP and MV), in use, powered by a variable volume oil pump (respectively PVP and PVV) which are in their turn driven by the engine (M).
 
4. Suction equipment as in claim 3, characterized in that the logic unit (UL), in use, regulates the revolution speed of the oil engine (MV) that powers the vacuum pump (PV) and that of the oil engine (MP) which powers the pressure pump (PP) by modifying the delivery of the corresponding variable volume oil pump (respectively PVV and PVP).
 
5. Suction equipment as in claim 4, characterized in that the logic unit (UL), in use, modifies the delivery of the variable volume oil pump (PW) according to the difference between a predetermined value (Vo) of degree of vacuum inside the collection tank (C) and the value (V) of degree of vacuum measured inside tank (C) by a first sensor (SV).
 
6. Suction equipment as in claim 4, characterized in that the logic unit (UL), in use, modifies the delivery of the variable volume oil pump (PVP) according to the difference between a predetermined value (Po) of delivery pressure of the pressure pump (PP) and the value (P) of the delivery pressure measured by a second sensor (SP).
 
7. Suction equipment as in claim 3, characterized in that the logic unit (UL), in use, manages the engine (M) and the vacuum pump (PV) through the following sequence of functional steps:

■ following an initialisation step, if any, to verify if the vacuum pump (PV) is activated: if the vacuum pump (PV) is not activated to verify if the pressure pump (PP) is activated,

■ if the pressure pump (PP) is activated, to lower to zero the delivery (CLV) of the variable volume oil pump (PW) relative to the variable speed power transmission means (TV) which drive the vacuum pump (PV) before passing to manage the engine (M) and the pressure pump (PP); otherwise to lower to zero the delivery (CLV) of the variable volume pump (PVV) relative to the variable speed power transmission means (TV) which drive the vacuum pump (PV) and to bring the number of revolutions (GM) of the engine (M) to a predetermined minimum value (GMmin), before returning to stand by condition;

■ if the vacuum pump (PV) is activated, to verify that the predetermined value of degree of vacuum (Vo) is greater than value (V) measured by a first sensor (SV), minus a first predetermined quantity (K1), but lower than said value (V) plus a second predetermined quantity (K2) and to wait for a time t6 before passing to manage the engine (M) and the pressure pump (PP); otherwise to verify that the predetermined value of degree of vacuum (Vo) is not greater than the said value (V) minus the first predetermined quantity (K1), before verifying if the predetermined value (Vo) of degree of vacuum is lower than said value (V) plus the second predetermined quantity (K2);

■ if the predetermined value of degree of vacuum (Vo) is greater than the said value (V) minus the first predetermined quantity (K1), to verify that the delivery (CLV) of the variable volume pump (PVV) relative to the variable speed power transmissions (TV) which drive the vacuum pump (PV) is lower than 100%, before increasing it by a predetermined quantity (dc), waiting for a predetermined time t2, and passing to manage the engine (M) and the pressure pump (PP); otherwise to verify that the number of revolutions (GM) of the engine (M) is lower than a predetermined maximum volume (GMmax), and that the number of revolutions (GPV) of the vacuum pump (PV) is lower than a predetermined maximum value (GPVmax) before increasing the number of revolutions (GM) of the engine (M) by a predetermined quantity dg, waiting for a predetermined time t1 and passing to manage the engine (M) and the pressure pump (PP);

■ if the number of revolutions (GM) of the engine (M) is not lower than the predetermined maximum value (GMmax) and/or if the number of revolutions (GPV) of the vacuum pump (PV) is not lower than the predetermined maximum value (GPVmax), to verify that the predetermined value of the degree of vacuum (Vo) is not lower than said value (V) plus the second predetermined quantity (K2) before passing to manage the engine (M) and the pressure pump (PP);

■ if the predetermined value of degree of vacuum (Vo) is lower than said predetermined value (V) plus the second predetermined quantity (K2), to verify that the number of revolutions (GM) of the engine (M) is not greater than the predetermined minimum value (GMmin) before reducing by the predetermined quantity dc the delivery (CLV) of the variable volume pump (PW) relative to the variable speed power transmission means (TV) which drive the vacuum pump (PV), waiting for a predetermined time t3 and passing to manage the engine (M) and the pressure pump (PP);

■ if the number of revolutions (GM) of the engine (M) is greater than the predetermined minimum value (GMmin), to verify that the pressure pump (PP) is activated and that the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the pressure pump (PP) is greater than 99% before reducing by the predetermined quantity dc the delivery (CLV) of the variable volume pump (PW) relative to the variable speed power transmission means (TV) which drive the vacuum pump (PV), waiting for a predetermined time t5 and passing to manage the engine (M) and the pressure pump (PP); otherwise to reduce the number of revolutions (GM) of the engine (M) by the predetermined value dg and waiting for a predetermined time t4 before passing to manage the engine (M) and the pressure pump (PP).


 
8. Suction equipment as in claim 7, in which the pressure pump (PP), in use, is directly driven by the engine (M), characterized in that, in use, the logic unit (UL) carries out the following sequence of functional steps: to verify that the number of revolutions (GM) of the engine (M) is greater than the predetermined minimum value (GMmin) and to verify that the pressure pump (PP) is activated before reducing by the predetermined quantity dc the delivery (CLV) of the variable volume pump (PW) relative to the variable speed power transmission means (TV) which drive the vacuum pump (PV), waiting for a predetermined time t5 and passing to manage the engine (M) and the pressure pump (PP); otherwise to reduce the number of revolutions (GM) of the engine (M) by the predetermined quantity dg, and waiting for a predetermined time t4, before passing to manage the engine (M) and the pressure pump (PP).
 
9. Suction equipment as in claim 7, in which the vacuum pump (PV), in use, is directly driven by the engine (M), characterized in that the logic unit (UL), in use, manages the engine (M) through the following sequence of functional steps:

■ following a initialisation step, if any, to verify if the vacuum pump (PV) is activated: if the vacuum pump (PV) is not activated, to verify if the pressure pump (PP) is activated;

■ if the pressure pump (PP) is activated, to pass to manage the engine (M) and the pressure pump (PP), otherwise to bring the number of revolutions (GM) of the engine (M) to a predetermined minimum volume (GMmin) before returning to stand by condition;

■ if the vacuum pump (PV) is activated, to verify that the predetermined value of degree of vacuum (Vo) is greater than value (V) measured by a first sensor (SV) minus a first predetermined quantity (K1), but lower than said value (V) plus a second predetermined quantity (K2) and wait for a predetermined time t6 before passing to manage the engine (M) and the pressure pump (PP); otherwise, to verify that the predetermined value of the degree of vacuum (Vo) is not greater than the said value (V) minus the first predetermined quantity (K1), to verify that the predetermined value of degree of vacuum (Vo) is not lower than said value (V) plus the second predetermined quantity (K2) and to pass to manage the engine (M) and the pressure pump (PP);

■ if the predetermined value of degree of vacuum (Vo) is greater than the said value (V) minus the first predetermined quantity (K1), to verify that the number of revolutions (GM) of the engine (M) is lower than a predetermined maximum value (GMmax) and that the number of revolutions (GPV) of the vacuum pump (PV) is lower than a predetermined maximum value (GPVmax), to increase by a predetermined quantity dg the number of revolutions (GM) of the engine (M), to wait for a predetermined time t1 and to pass to manage the engine (M) and the pressure pump (PP);

■ if the number of revolutions (GM) of the engine (M) is not lower than the predetermined maximum value (GMmax) and/or if the number of revolutions (GPV) of the vacuum pump (PV) is not lower than the predetermined maximum value (GPVmax), to verify that the predetermined value of degree of vacuum (Vo) is not lower than said value (V) plus the second predetermined quantity (K2) before passing on to manage the engine (M) and the pressure pump (PP);

■ if the predetermined value of degree of vacuum (Vo) is lower than said value (V) plus the second predetermined quantity (K2), to verify that the number of revolutions (GM) of the engine (M) is not greater than the predetermined minimum value (GMmin) before waiting for a predetermined time t3 and passing to manage the engine (M) and the pressure pump (PP);

■ if the number of revolutions (GM) of the engine (M) is greater than the predetermined minimum value (GMmin), to verify that the pressure pump (PP) is activated and that the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the pressure pump (PP) is greater than 99% before waiting for a predetermined time t5 and passing to manage the engine (M) and the pressure pump (PP); otherwise to reduce the number of revolutions (GM) of the engine (M) by the predetermined quantity dg and waiting for a predetermined time t4 before passing to manage the engine (M) and the pressure pump (PP).


 
10. Suction equipment as in claims 7,8 or 9, characterized in that the first and second predetermined quantities (K1,K2) are between 0 and 0,3 bar, about, the waiting times (t1-t6) are between 0 and 60 seconds, about, and the maximum number of revolutions (GPVmax) of the vacuum pump (PV) is between 500 and 5000 rpm, about.
 
11. Suction equipment as in claim 10, characterized in that the first predetermined quantity (K1) is of about 0.01 bar, the second predetermined quantity (K2) is of about 0.08 bar, waiting times t1 and t2 are of about 0.4 seconds, waiting times t3,t4,t5 are of about 0.3 seconds, waiting time t6 is of about 0.5 seconds and the maximum number of revolutions (GPVmax) of the vacuum pump (PV) is of about 1100 rpm. ca.
 
12. Suction equipment as in claim 3, characterized in that the logic unit (UL), in use, manages the engine (M) and the pressure pump (PP) through the following sequence of functional steps:

■ following an initialisation step, if any, to verify that the pressure pump (PP) is activated: if the pressure pump (PP) is not activated, to verify if the vacuum pump (PV) is activated;

■ if the vacuum pump (PV) is activated, to lower to zero the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the pressure pump (PP) and to pass to manage the engine (M) and the vacuum pump (PV); otherwise to lower to zero the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the pressure pump (PP) and bringing the number of revolutions (GM) of the engine (M) to a predetermined minimum value (GMmin) before returning to stand by condition;

■ if the pressure pump (PP) is activated, to verify that the predetermined value of delivery pressure (Po) of the pressure pump (PP) is greater than value (P) measured by second sensor (SP) minus a third predetermined quantity (K3), but lower than said value (P) plus a fourth predetermined quantity (K4), and wait for a predetermined time t12 before passing to manage the engine (M) and the vacuum pump (PV); otherwise, to verify that the predetermined value (Po) of delivery pressure of the pressure pump (PP) is not greater than the said value (P) minus the third predetermined quantity (K3) before verifying that the predetermined value of delivery pressure (Po) of the pressure pump (PP) is lower than said value (P) plus the fourth predetermined quantity (K4);

■ if the predetermined value of delivery pressure (Po) of the pressure pump (PP) is greater than the said value (P) minus the third predetermined quantity (K3), to verify that the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the vacuum pump (PV) is lower than 100% before increasing it by a predetermined quantity (dc), waiting for a predetermined time t8 and passing to manage the engine (M) and the vacuum pump (PV); otherwise, to verify that the number of revolutions (GM) of the engine (M) is lower than the predetermined maximum value (GMmax), and that the number of revolutions (GPP) of the pressure pump (PP) is lower than a predetermined maximum value (GPPmax) before increasing by a predetermined quantity dg the number of revolutions (GM) of the engine (M), waiting for a predetermined time t7 and passing to manage the engine (M) and the vacuum pump (PV);

■ if the number of revolutions (GM) of the engine (M) is not lower than the predetermined maximum value (GMmax), and/or if the number of revolutions (GPP) of the pressure pump (PP) is not lower than the predetermined maximum value (GPPmax), to verify that the predetermined value (Po) of delivery pressure of the pressure pump (PP) is not lower than said value (P) plus the fourth predetermined quantity (K4) before passing to manage the engine (M) and the vacuum pump (PV);

■ if the said value (Po) of delivery pressure of the pressure pump (PP) is lower than said value (P) plus the fourth predetermined quantity (K4), to verify that the number of revolutions (GM) of the engine (M) is not greater than the predetermined minimum value (GMmin) before reducing by the predetermined quantity dc the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the pressure pump (PP) and wait for a predetermined time t9 before passing to manage the engine (M) and the vacuum pump (PV);

■ if the number of revolutions (GM) of the engine (M) is greater than the predetermined minimum value (GMmin), to verify that the vacuum pump (PV) is activated and that the delivery (CLV) of the variable volume pump (PW) relative to the variable speed power transmission means (TV) which drive the vacuum pump (PV) is greater than 99%, before reducing by the predetermined quantity dc the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the pressure pump (PP), and wait for a predetermined time t11 before passing to manage the engine (M) and the vacuum pump (PV); otherwise, to reduce the number of revolutions (GM) of the engine (M) by the predetermined quantity dg and wait for a predetermined time t10 before passing to manage the engine (M) and the vacuum pump (PV).


 
13. Suction equipment as in claim 12 in which the pressure pump (PP), in use, is directly driven by the engine (M), characterized in that the logic unit (UL), in use, manages the engine (M) through the following sequence of functional steps:

■ following an initialisation step, if any, to verify if the pressure pump (PP) is activated: if the pressure pump (PP) is not activated, to verify if the vacuum pump (PV) is activated;

■ if the vacuum pump (PV) is activated, to pass to manage the engine (M) and the vacuum pump (PV); otherwise, to bring the number of revolutions (GM) of the engine (M) to the predetermined minimum value (GMmin) before returning to stand by condition;

■ if the pressure pump (PP) is activated, to verify that the predetermined value (Po) of delivery pressure of the pressure pump (PP) is greater than the value (P) measured by a second sensor (SP) minus a third predetermined quantity (K3), but lower than said value (P) plus a fourth predetermined quantity (K4) and wait for a predetermined time t12 before passing to manage the engine (M) and the vacuum pump (PV); otherwise, to verify that the predetermined value (Po) of delivery pressure of the pressure pump (PP) is not greater than the said value (P) minus the third predetermined quantity (K3) before verifying if the predetermined value (Po) of delivery pressure of the pressure pump (PP) is lower than the said value (P) plus the fourth predetermined quantity (K4);

■ if the predetermined value (Po) of delivery pressure of the pressure pump (PP) is greater than the said value (P) minus the third predetermined quantity (K3), to verify that the number of revolutions (GM) of the engine (M) is lower than the predetermined maximum value (GMmax) and that the number of revolutions (GPP) of the pressure pump (PP) is lower than the predetermined maximum value (GPPmax) before increasing the number of revolutions (GM) of the engine (M) by a predetermined quantity dg and wait for a predetermined time t7 before passing to manage the engine (M) and the vacuum pump (PV);

■ if the number of revolutions (GM) of the engine (M) is not lower than the predetermined maximum value (GMmax) and/or if the number of revolutions (GPP) of the pressure pump (PP) is not lower than the predetermined maximum value (GPPmax), to verify that the predetermined value (Po) of delivery pressure of the pressure pump (PP) is not lower than said value (V) plus the fourth predetermined quantity (K4) before passing to manage the engine (M) and the vacuum pump (PV);

■ if the predetermined value (Po) of delivery pressure of the pressure pump (PP) is lower than said value (P) plus the fourth predetermined quantity (K4), to verify that the number of revolutions (GM) of the engine (M) is not greater than the predetermined minimum value (GMmin) before waiting for a predetermined time t9 and passing to manage the engine (M) and the vacuum pump (PV);

■ if the number of revolutions (GM) of the engine (M) is greater than the predetermined minimum value (GMmin), to verify that the vacuum pump (PV) is activated and that the delivery (CLV) of the variable volume pump (PW) relative to the variable speed power transmission means (TV) which drive the vacuum pump (PV) is greater than 99%, before waiting for a predetermined time t11 and passing to manage the engine (M) and the vacuum pump (PV); otherwise, to reduce the number of revolutions (GM) of the engine (M) by the predetermined quantity dg and wait for a predetermined time t10 before passing to manage the engine (M) and the vacuum pump (PV).


 
14. Suction equipment as in claim 12, in which the vacuum pump (PV), in use, is directly driven by the engine (M), characterized in that the logic unit (UL), in use, carries out the following sequence of functional steps: to verify that the number of revolutions (GM) of the engine (M) is greater than the predetermined minimum value (GMmin), to verify that the vacuum pump (PV) is activated, to reduce by the predetermined quantity dc the delivery (CLP) of the variable volume pump (PVP) relative to the variable speed power transmission means (TP) which drive the pressure pump (PP) and to wait for a predetermined time t11 before passing to manage the engine (M) and the pressure pump (PP); otherwise, to reduce the number of revolutions (GM) of the engine (M) by the predetermined quantity dg and to wait for a predetermined time t10 before passing to manage the engine (M) and the pressure pump (PP).
 
15. Suction equipment as in claims 12, 13 or 14, characterized in that the third and fourth predetermined quantities (K3, K4) are between 0 and 50 bar about, the waiting times (t7-t12) are between 0 and 60 seconds about and the maximum number of revolutions (GPPmax) of the pressure pump (PP) is between 400 and 2500 rpm. about.
 
16. Suction equipment as in claim 15, characterized in that the third predetermined quantity (K3) is of about 5 bar, the fourth predetermined quantity (K4) is of about 12 bar, the waiting times t7 and t8 are of about 0.8 seconds, the waiting times t9, t10 and t11 are of about 0.4 seconds, the waiting time t12 is of about 0.5 seconds and the maximum number of revolutions (GPPmax) of the pressure pump (PP) is of about 1450 rpm.
 
17. Suction equipment as in claim 9 or 13, characterized in that, in use, during the initialisation step the logic unit (UL) acquires a predetermined value of output speed of the variable speed power transmission means (respectively TV and TP) which drive respectively the vacuum pump (PV) and the pressure pump (PP).
 
18. Suction equipment as in claim 17, characterized in that, in use, during the initialisation step the logic unit (UL) acquires a predetermined value of delivery (respectively CLV and CLP) of the variable volume oil pump (respectively PPV and PVP) relative to the variable speed power transmission means (respectively TV and TP) which drive respectively the vacuum pump (PV) and the pressure pump (PP).
 
19. Suction equipment as in claims 7 to 9 or from 13 to 15, characterized in that the minimum number of revolutions (GMmin) of the engine (M) is between 100 and 1500 rpm. about, the maximum number of revolutions (GMmax) of the engine (M) is between 500 and 4000 rpm. about, the increasing/decreasing step dg of the number of revolutions (GM) of the engine (M) is between 1 and 250 rpm. about and the increasing/decreasing step dc of the delivery (respectively CLV and CLP) of each of the variable volume pumps (respectively PVV and PVP) is between 0.1 % and 50% about.
 
20. Suction equipment as in claim 19, characterised in that the minimum number of revolutions (GMmin) of the engine (M) is of about 650 rpm., the maximum number of revolutions (GMmax) of the engine (M) is of about 1050 rpm., the increasing/decreasing step dg of the number of revolutions (GM) of the engine (M) is of about 30 rpm. and the increasing/decreasing step dc of the delivery (respectively CLV and CLP) of each of the variable volume pumps (respectively PVV and PVP) is of about 2%.
 


Ansprüche

1. Saug- und Hochdruckreinigungsanlage, die durch eine logische Einheit optimiert ist und die umfasst:

die logische Einheit (UL),

wenigstens einen Behälter zum Sammeln der abgelassenen Flüssigkeit,

einen Behälter für Reinigungswasser,

eine Vakuumpumpe, die in dem Sammelbehälter einen Nennunterdruckgrad erzeugt und aufrechterhält,

eine Druckpumpe, die mit Hochdruck Wasser zur Reinigung zuführt und

einen Motor, der die zwei Pumpen antreibt,

wobei die Umdrehungsgeschwindigkeit der Druckpumpe (PP) unabhängig von der der Vakuumpumpe (PV) ist und die Umdrehungsgeschwindigkeit wenigstens einer der Pumpen (PP, PV) unabhängig von der des Motors (M) ist, wenigstens eine der Pumpen (PP, PV) durch den Motor (M) über Kraftübertragungsmitel (TP, TV) mit veränderlicher Geschwindigkeit angetrieben wird, die geeignet sind, ihre Abtriebgeschwindigkeiten, gesteuert durch die logische Einheit (UL), kontinuierlich zu ändern, wobei die logische Einheit (UL) den Motor (M) bei der minimalen Drehzahl hält, die erforderlich ist, um die von den Pumpen (PP, PV) geforderte Leistung zu liefern.
 
2. Sauganlage gemäß Anspruch 1, dadurch gekennzeichnet, dass die Kraftübertragungsmitel (TP, TV) mit veränderlicher Geschwindigkeit geeignet sind, ihre Abtriebgeschwindigkeiten zwischen 0 und einem Maximalwert kontinuierlich zu ändern.
 
3. Sauganlage gemäß Anspruch 2, dadurch gekennzeichnet, dass jedes der Kraftübertragungsmittel (TP, TV) mit veränderlicher Geschwindigkeit einen Ölmotor (MP bzw. MV) enthält, der im Gebrauch durch eine Ölpumpe (PVP und PVV) mit veränderlichen Volumen angetrieben wird, wobei die Ölpumpen (PVP bzw. PVV) mit veränderlichem Volumen ihrerseits durch den Motor (M) angetrieben werden.
 
4. Sauganlage gemäß Anspruch 3, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch die Umdrehungsgeschwindigkeit des Ölmotors (MV), der die Vakuumpumpe (PV) antreibt, und die Umdrehungsgeschwindigkeit des Ölmotors (MP), der die Druckpumpe (PP) antreibt, reguliert, indem sie die Abgabe der entsprechenden Ölpumpe (PVV bzw. PVP) mit veränderlichem Volumen ändert.
 
5. Sauganlage nach Anspruch 4, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch die Abgabe der Ölpumpe (PVV) mit veränderlichern Volumen gemäß der Differenz zwischen einem vorgegebenen Wert (Vo) des Unterdruckgrads in dem Sammelbehälter (C) und dem durch einen ersten Sensor (SV) gemessenen Wert (V) des Unterdruckgrads in dem Behälter (C) ändert.
 
6. Sauganlage gemäß Anspruch 4, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch die Abgabe der Ölpumpe (PVP) mit veränderlichem Volumen gemäß der Differenz zwischen einem vorgegebenen Wert (Po) des Abgabedrucks der Druckpumpe (PP) und dem durch einen zweiten Sensor (SP) gemessenen Wert (P) des Abgabedrucks ändert.
 
7. Sauganlage gemäß Anspruch 3, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch das Management des Motors (M) und der Vakuumpumpe (PV) über folgenden Ablauf von Funktionsschritten durchführt:

- nach einem initialisierungsschritt, wenn überhaupt, Überprüfen, ob die Vakuumpumpe (PV) aktiviert ist: falls die Vakuumpumpe (PV) nicht aktiviert ist, Überprüfen, ob die Druckpumpe (PP) aktiviert ist,

- falls die Druckpumpe (PP) aktiviert ist, Verringern der Abgabe (CLV) der Ölpumpe (PVV) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, bis auf null, vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Verringern der Abgabe (CLV) der Pumpe (PVV) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, bis auf null und Bringen der Drehzahl (GM) des Motors (M) auf einen vorgegebenen Minimalwert (GMmin) vor der Rückkehr in den Bereitschaftszustand;

- falls die Vakuumpumpe (PV) aktiviert ist, Überprüfen, dass der vorgegebene Wert des Unterdruckgrads (Vo) größer als der durch einen ersten Sensor (SV) gemessene Wert (V) minus einer ersten vorgegebenen Größe (K1), aber kleiner als der Wert (V) plus einer zweiten vorgegebenen Größe (K2) ist, und Warten während einer Zeitdauer t6 vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Überprüfen, dass der vorgegebene Wert des Unterdruckgrads (Vo) nicht größer als der genannte Wert (V) minus der ersten vorgegebenen Größe (K1) ist, vor dem Überprüfen, ob der vorgegebene Wert (Vo) des Unterdruckgrads kleiner als der Wert (V) plus der zweiten vorgegebenen Größe (K2) ist;

- falls der vorgegebene Wert des Unterdruckgrads (Vo) größer als der Wert (V) minus der ersten vorgegebenen Größe (K1) Ist, Überprüfen, dass die Abgabe (CLV) der Pumpe (PVV) mit veränderlichem Volumen bezüglich der Kraftübertragungen (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, kleiner als 100% ist, vor deren Erhöhen um eine vorgegebene Größe (dc), Warten während einer vorgegebenen Zeitdauer t2 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Überprüfen, dass die Drehzahl (GM) des Motors (M) kleiner als ein vorgegebener Maximalpegel (GMmax) ist und dass die Drehzahl (GPV) der Vakuumpumpe (PV) kleiner als ein vorgegebener Maximalwert (GPVmax) ist, vor dem Erhöhen der Drehzahl (GM) des Motors (M) um eine vorgegebene Größe dg, Warten während einer vorgegebenen Zeitdauer t1 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP);

- falls die Drehzahl (GM) des Motors (M) nicht kleiner als der vorgegebene Maximalwert (GMmax) ist und/oder falls die Drehzahl (GPV) der Vakuumpumpe (PV) nicht kleiner als der vorgegebene Maximalwert (GPVmax) ist, Überprüfen, dass der vorgegebene Wert des Unterdruckgrads (Vo) nicht kleiner als der Wert (V) plus der zweiten vorgegebenen Größe (K2) ist, vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP);

- falls der vorgegebene Wert des Unterdruckgrads (Vo) kleiner als der vorgegebene Wert (V) plus der zweiten vorgegebenen Größe (K2) ist, Überprüfen, dass die Drehzahl (GM) des Motors (M) nicht größer als der vorgegebene Minimalwert (GMmin) ist, vor dem Verringern der Abgabe (CLV) der Pumpe (PVV) mit veränderlichem Volumen um die vorgegebene Größe dc bezüglich der Kraftübertragungsmittel (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, Warten während einer vorgegebenen zeitdauer t3 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP);

- falls die Drehzahl (GM) des Motors (M) größer als der vorgegebene Minimalwert (GMmin) ist, Überprüfen, dass die Druckpumpe (PP) aktiviert ist und dass die Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit, die die Druckpumpe (PP) antreiben, größer als 99 % ist, vor dem Verringern der Abgabe (CLV) der Pumpe (PVV) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, um eine vorgegebene Größe dc, Warten während einer vorgegebenen Zeitdauer t5 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Verringern der Drehzahl (GM) des Motors (M) um einen vorgegebenen Wert dg und Warten während einer vorgegebenen Zeitdauer t4 vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP).


 
8. Sauganlage gemäß Anspruch 7, in der die Druckpumpe (PP) im Gebrauch direkt durch den Motor (M) angetrieben wird, dadurch gekennzeichnet; dass die logische Einheit (UL) im Gebrauch den folgenden Ablauf von Funktionsschritten ausführt: Überprüfen, dass die Drehzahl (GM) des Motors (M) größer als der vorgegebene Minimalwert (GMmin) ist, und Überprüfen, dass die Druckpumpe (PP) aktiviert ist vor dem Verringern der Abgabe (CLV) der Pumpe (PVV) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, um die vorgegebene Größe dc, Warten während einer vorgegebenen Zeit t5 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Verringern der Drehzahl (GM) des Motors (M) um eine vorgegebene Größe dg und Warten während einer vorgegebenen Zeitdauer t4 vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP).
 
9. Sauganlage gemäß Anspruch 7, in der die Vakuumpumpe (PV) im Gebrauch direkt durch den Motor (M) angetrieben wird, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch das Management des Motors (M) über den folgenden Ablauf von Funktionsschritten ausführt:

- nach einem Initialisierungsschritt, wenn überhaupt, Überprüfen, ob die Vakuumpumpe (PV) aktiviert ist: falls die Vakuumpumpe (PV) nicht aktiviert ist, Überprüfen, ob die Druckpumpe (PP) aktiviert ist;

- falls die Druckpumpe (PP) aktiviert ist, Übergehen zum Management des Motors (M) und der Druckpumpe (PP), andernfalls Bringen der Drehzahl (GM) des Motors (M) auf einen vorgegebenen Minimalpegel (GMmin) vor der Rückkehr in den Bereitschaftszustand;

- falls die Vakuumpumpe (PV) aktiviert ist, Überprüfen, dass der vorgegebene Wert des Unterdruckgrads (Vo) größer als der durch einen ersten Sensor (SV) gemessene Wert (V) minus einer ersten vorgegebenen Größe (K1), aber kleiner als der Wert (V) plus einer zweiten vorgegebenen Größe (K2) ist und Warten während einer vorgegebenen Zeitdauer t6 vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Überprüfen, dass der vorgegebene Wert des Unterdruckgrads (Vo) nicht größer als der Wert (V) minus der ersten vorgegebenen Größe (K1) ist, Überprüfen, dass der vorgegebene Wert des Unterdruckgrads (Vo) nicht kleiner als der Wert (V) plus der zweiten vorgegebenden Größe (K2) ist, und Übergehen zum Management des Motors (M) und der Druckpumpe (PP);

- falls der vorgegebene Wert des Unterdruckgrads (Vo) größer als der Wert (V) minus der ersten vorgegebenen Größe (K1) ist, Überprüfen, dass die Drehzahl (GM) des Motors (M) kleiner als ein vorgegebener Maximalwert (GMmax) ist und dass die Drehzahl (GPV) der Vakuumpumpe (PV) kleiner als ein vorgegebener Maximalwert (GPVmax) ist, Erhöhen der Drehzahl (GM) des Motors (M) um eine vorgegebene Größe dg, Warten während einer vorgegebenen Zeitdauer t1 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP);

- falls die Drehzahl (GM) des Motors (M) nicht kleiner als der vorgegebene Maximalwert (GMmax) ist und/oder falls die Drehzahl (GPV) der Vakuumpumpe (PV) nicht kleiner als der vorgegebene Maximalwert GPVmax) ist, Überprüfen, dass der vorgegebene Wert des Unterdruckgrads (Vo) nicht kleiner als der Wert (V) plus der zweiten vorgegebenen Größe (K2) ist, vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP);

- falls der vorgegebene Wert des Unterdruckgrads (Vo) kleiner als der Wert (V) plus der zweiten vorgegebenen Größe (K2) ist, Überprüfen, dass die Drehzahl (GM) des Motors (M) nicht größer als der vorgegebene Minimalwert (GMmin) ist, vor dem Warten während einer vorgegebenden Zeitdauer t3 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP);

- falls die Drehzahl (GM) des Motors (M) größer als der vorgegebene Minimalwert (GMmin) ist, Überprüfen, dass die Druckpumpe (PP) aktiviert ist und dass die Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit, die die Druckpumpe (PP) antreiben, größer als 99 % ist, vor dem Warten während einer vorgegebenen Zeitdauer t5 und Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Verringern der Drehzahl (GM) des Motors (M) um die vorgegebene Größe dg und Warten während einer vorgegebenen Zeitdauer t4 vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP).


 
10. Sauganlage gemäß Anspruch 7, 8 oder 9, dadurch gekennzeichnet, dass die erste und die zweite vorgegebene Größe (K1, K2) etwa zwischen 0 und 0,3 Bar, die Wartezeiten (t1-t6) etwa zwischen 0 und 60 Sekunden und die maximale Drehzahl (GPVmax) der Vakuumpumpe (PV) etwa zwischen 500 und 5000 U/min sind.
 
11. Sauganlage gemäß Anspruch 10, dadurch gekennzeichnet, dass die erste vorgegebene Größe (K1) etwa 0,01 Bar ist, dass die zweite vorgegebene Größe (K2) etwa 0,08 Bar ist, dass die Wartezeiten t1 und t2 etwa 0,4 Sekunden sind, dass die Wartezeiten t3, t4, t5 etwa 0,3 Sekunden sind, dass die Wartezeit t6 etwa 0,5 Sekunden ist und dass die maximale Drehzahl (GPVmax) der Vakuumpumpe (PV) etwa 1100 U/min ist.
 
12. Sauganlage gemäß Anspruch 3, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch das Management des Motors (M) und der Druckpumpe (PP) durch den folgenden Ablauf von Funktionsschritten ausführt:

- nach einem Initialisierungsschritt, wenn überhaupt, Überprüfen, dass die Druckpumpe (PP) aktiviert ist: falls die Druckpumpe (PP) nicht aktiviert ist, überprüfen, ob die Vakuumpumpe (PV) aktiviert ist;

- falls die Vakuumpumpe (PV) aktiviert ist, Verringern der Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit, die die Druckpumpe (PP) antreiben, bis auf null und Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV); andernfalls Verringern der Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit, die die Druckpumpe (PP) antreiben, bis auf null und Bringen der Drehzahl (GM) des Motors (M) auf einen vorgegebenen Minimalwert (GMmin) vor der Rückkehr in den Bereitschaftszustand;

- falls die Druckpumpe (PP) aktiviert ist, Überprüfen, dass der vorgegebene Wert des Abgabedrucks (Po) der Druckpumpe (PP) größer als der durch den zweiten Sensor (SP) gemessene Wert (P) minus einer dritten vorgegebenen Größe (K3), aber kleiner als der Wert (P) plus einer vierten vorgegebenen Größe (K4) ist und Warten während einer vorgegebenen Zeitdauer t12 vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV); andernfalls Überprüfen, dass der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) nicht größer als der Wert (P) minus der dritten vorgegebenen Größe (K3) ist, vor dem Überprüfen, dass der vorgegebene Wert des Abgabedrucks (Po) der Druckpumpe (PP) kleiner als der Wert (P) plus der vierten vorgegebenen Größe (K4) ist;

- falls der vorgegebene Wert des Abgabedrucks (Po) der Druckpumpe (PP) größer als der Wert (P) minus der dritten vorgegebenen Größe (K3) ist, Überprüfen, dass die Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, kleiner als 100 % ist, vor deren Erhöhen um eine vorgegebene Größe (dc), Warten während einer vorgegebenen Zeitdauer t8 und Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV); andernfalls Überprüfen, dass die Drehzahl (GM) des Motors (M) kleiner als der vorgegebene Maximalwert (GMmax) ist und dass die Drehzahl (GPP) der Druckpumpe (PP) kleiner als ein vorgegebener Maximalwert (GPPmax) ist, vor dem Erhöhen der Drehzahl (GM) des Motors (M) um eine vorgegebene Größe dg, Warten während einer vorgegebenen Zeitdauer t7 und Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV);

- falls die Drehzahl (GM) des Motors (M) nicht kleiner als der vorgegebene Maximalwert (GMmax) ist und/oder falls die Drehzahl (GPP) der Druckpumpe (PP) nicht kleiner als der vorgegebene Maximalwert (GPPmax) ist, Überprüfen, dass der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) nicht kleiner als der Wert (P) plus der vierten vorgegebenen Größe (K4) ist, vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV);

- falls der genannte Wert (Po) des Abgabedrucks der Druckpumpe (PP) kleiner als der Wert (P) plus der vierten vorgegebenen Größe (K4) ist, Überprüfen, dass die Drehzahl (GM) des Motors (M) nicht größen als der vorgegebene Minimalwert (GMmin) ist, vor dem Verringern der Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit, die die Druckpumpe (PP) antreiben, um die vorgegebene Größe dc und Warten während einer vorgegebenen Zeitdauer t9 vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV);

- falls die Drehzahl (GM) des Motors (M) größer als der vorgegebene Minimalwert (GMmin) ist, Überprüfen, dass die Vakuumpumpe (PV) aktiviert ist und dass die Abgabe (CLV) der Pumpe (PVV) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, größer als 99 % ist, vor dem Verringern der Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit, die die Druckpumpe (PP) antreiben, um die vorgegebene Größe dc und Warten während einer vorgegebenen Zeitdauer t11 vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV); andernfalls Verringern der Drehzahl (GM) des Motors (M) um die vorgegebene Größe dg und Warten während einer vorgegebenen Zeitdauer t10 vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV).


 
13. Sauganlage gemäß Anspruch 12, in der die Druckpumpe (PP) im Gebrauch direkt durch den Motor (M) angetrieben wird, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch das Management des Motors (M) über den folgenden Ablauf von Funktionsschritten ausführt:

- nach einem Initialisierungsschritt, wenn überhaupt, Überprüfen, ob die Druckpumpe (PP) aktiviert ist: falls die Druckpumpe (PP) nicht aktiviert ist, Überprüfen, ob die Vakuumpumpe (PV) aktiviert ist;

- falls die Vakuumpumpe (PV) aktiviert ist, Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV); andernfalls Bringen der Drehzahl (GM) des Motors (M) auf den vorgegebenen Minimalwert (GMmin) vor der Rückkehr in den Bersitschaftszustand;

- falls die Druckpumpe (PP) aktiviert ist, Überprüfen, dass der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) größer als der durch einen zweiten Sensor (SP) gemessene Wert (P) minus einer dritten vorgegebenen Größe (K3), aber kleiner als der Wert (P) plus einer vierten vorgegebenen Größe (K4) ist und Warten während einer vorgegebenen Zeitdauer t12 vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV); andernfalls Überprüfen, dass der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) nicht größer als der Wert (P) minus der dritten vorgegebenen Größe (K3) ist, vor der Überprüfung, ob der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) kleiner als der Wert (P) plus der vierten vorgegebenen Größe (K4) ist;

- falls der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) größer als der Wert (P) minus der dritten vorgegebenen Größe (K3) ist, Überprüfen, dass die Drehzahl (GM) des Motors (M) kleiner als der vorgegebene Maximalwert (GMmax) ist und dass die Drehzahl (GPP) der Druckpumpe (PP) kleiner als der vorgegebene Maximalwert (GPPmax) ist, vor dem Erhöhen der Drehzahl (GM) des Motors (M) um eine vorgegebene Größe dg und Warten während einer vorgegebenen Zeit t7 vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV);

- falls die Drehzahl (GM) des Motors (M) nicht kleiner als der vorgegebene Maximalwert (GMmax) ist und/oder falls die Drehzahl (GPP) der Druckpumpe (PP) nicht kleiner als der vorgegebene Maximalwert (GPPmax) Ist, Überprüfen, dass der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) nicht kleiner als der Wert (V) plus der vierten vorgegebenen Größe (K4) ist, vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV);

- falls der vorgegebene Wert (Po) des Abgabedrucks der Druckpumpe (PP) kleiner als der Wert (P) plus der vierten vorgegebenen Größe (K4) ist, Überprüfen, dass die Drehzahl (GM) des Motors (M) nicht größer als der vorgegebene Minimalwert (GMmin) ist, vor dem Warten während einer vorgegebenen Zeit t9 und Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV);

- falls die Drehzahl (GM) des Motors (M) größer als der vorgegebene Minimalwert (GMmin) ist, Überprüfen, dass die Vakuumpumpe (PV) aktiviert ist und dass die Abgabe (CLV) der Pumpe (PVV) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TV) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) antreiben, größer als 99 % ist, vor dem Warten während einer vorgegebenen Zeit t11 und Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV); andernfalls Verringern der Drehzahl (GM) des Motors (M) um die vorgegebene Größe dg und Warten während einer vorgegebenen Zeit t10 vor dem Übergehen zum Management des Motors (M) und der Vakuumpumpe (PV).


 
14. Sauganlage gemäß Anspruch 12, in der die Vakuumpumpe (PV) im Gebrauch direkt durch den Motor (M) angetrieben wird, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch den folgenden Ablauf von Funktionsschritten ausführt: Überprüfen, dass die Drehzahl (GM) des Motors (M) größer als der vorgegebene Minimalwert (GMmin) ist, Überprüfen, dass die Vakuumpumpe (PV) aktiviert ist, Verringern der Abgabe (CLP) der Pumpe (PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TP) mit veränderlicher Geschwindigkeit die die Druckpumpe (PP) antreiben, um die vorgegebene Größe dc und Warten während einer vorgegebenen Zeitdauer t11 vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP); andernfalls Verringern der Drehzahl (GM) des Motors (M) um die vorgegebene Größe dg und Warten während einer vorgegebenen Zeitdauer t10 vor dem Übergehen zum Management des Motors (M) und der Druckpumpe (PP).
 
15. Sauganlage gemäß den Ansprüchen 12, 13 oder 14, dadurch gekennzeichnet, dass die dritte und die vierte vorgegebene Größe (K3, K4) etwa zwischen 0 und 50 Bar sind, dass die Wartezeiten (t7-t12) etwa zwischen 0 und 60 Sekunden sind und dass die maximale Drehzahl (GPPmax) der Druckpumpe (PP) etwa zwischen 400 und 2500 U/min ist.
 
16. Sauganlage gemäß Anspruch 15, dadurch gekennzeichnet, dass die dritte vorgegebene Größe (K3) etwa 5 Bar ist, dass die vierte vorgegebene Größe (K4) etwa 12 Bar ist, dass die Wartezeiten t7 und t8 etwa 0,8 Sekunden sind, dass die Wartezeiten t9, t10 und t11 etwa 0,4 Sekunden sind, dass die Wartezeit t12 etwa 0,5 Sekunden ist und dass die maximale Drehzahl (GPPmax) der Druckpumpe (PP) etwa 1450 U/min ist.
 
17. Sauganlage gemäß Anspruch 9 oder 13, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch während des Initialisierungsscheitts einen vorgegebenen Wert der Abtriebgeschwindigkeit der Kraftübertragungsmittel (TV bzw. TP) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) bzw. die Druckpumpe (PP) antreiben, erfasst.
 
18. Sauganlage gemäß Anspruch 17, dadurch gekennzeichnet, dass die logische Einheit (UL) im Gebrauch während des Initialisierungsschritts einen vorgegebenen Wert der Abgabe (CLV bzw. CLP) der Ölpumpe (PPV bzw. PVP) mit veränderlichem Volumen bezüglich der Kraftübertragungsmittel (TV bzw. TP) mit veränderlicher Geschwindigkeit, die die Vakuumpumpe (PV) bzw. die Druckpumpe (PP) antreiben, erfasst.
 
19. Sauganlage gemäß den Ansprüchen 7 bis 9 oder gemäß den Ansprüchen 13 bis 15, dadurch gekennzeichnet, dass die minimale Drehzahl (GMmin) des Motors (M) etwa zwischen 100 und 1500 U/min ist, dass die maximale Drehzahl (GMmax) des Motors (M) etwa zwischen 500 und 4000 U/min ist, dass der Schritt des Erhöhens/Verringerns der Drehzahl (GM) des Motors (M) um dg um etwa zwischen 1 und 250 U/min erfolgt und dass der Schritt des Erhöhens/Verringerns der Abgabe (CLV bzw. CLP) jeder der Pumpen (PVV bzw. PVP) mit veränderlichem Volumen um dc um etwa zwischen 0,1 % und 50 % erfolgt.
 
20. Sauganlage gemäß Anspruch 19, dadurch gekennzeichnet, dass die minimale Drehzahl (GMmin) des Motors (M) etwa 650 U/min ist, dass die maximale Drehzahl (GMmax) des Motors (M) etwa 1050 U/min ist, dass der Schritt des Erhöhens/Verringerns der Drehzahl (GM) des Motors (M) um dg um etwa 30 U/min erfolgt und dass der Schritt des Erhöhens/Verringerns der Abgabe (CLV bzw. CLP) jeder der Pumpen (PW bzw. PVP) mit veränderlichem Volumen um dc um etwa 2 % erfolgt.
 


Revendications

1. Équipement de nettoyage à aspiration et à haute pression optimisé par une unité logique, comprenant l'unité logique (UL), au moins un réservoir de collecte du liquide drainé, un réservoir pour l'eau de nettoyage, une pompe à vide pour créer et maintenir un degré de vide réglé à l'intérieur du réservoir collecteur, une pompe de pression (PP) pour amener l'eau à haute pression pour le nettoyage, et un moteur (M) pour entraîner les deux pompes, la vitesse de rotation de la pompe de pression (PP) étant indépendante de celle de la pompe à vide (PV), et la vitesse de rotation d'au moins une des pompes (PP, PV) étant indépendante de celle du moteur (M), au moins une des pompes (PP, PV) étant entraînée par le moteur (M) via des moyens de transmission à vitesse réglable (TP, TV) aptes à faire varier en continu leur vitesse de sortie, commandée par l'unité logique (UL) qui maintient le moteur (M) au nombre de tours minimum nécessaire pour fournir la puissance requise pour des pompes (PP, PV).
 
2. Équipement à aspiration selon la revendication 1, caractérisé en ce que lesdits moyens de transmission à vitesse réglable (TP, TV) sont aptes à faire varier en continu leur vitesse de sortir entre 0 et une valeur maximale.
 
3. Équipement à aspiration selon la revendication 2, caractérisé en ce que chacun des moyens de transmission à vitesse réglable (TP, TV) comprend un moteur hydraulique (respectivement MP et MV), actionné en état de marche, par une pompe hydraulique un volume variable (respectivement PVP et PVV), lesdites pompes étant à leur tour entraînées par le moteur (M).
 
4. Équipement à aspiration selon la revendication 3, caractérisé en ce que l'unité logique (UL) règle, en état de marche, la vitesse de rotation du moteur hydraulique (MV) qui actionne la pompe à vide (PV) et celle du moteur hydraulique (MP) qui actionne la pompe de pression (PP) en modifiant la distribution de la pompe hydraulique à volume variable correspondante (respectivement PVV et PVP).
 
5. Équipement à aspiration selon la revendication 4, caractérisé en ce que l'unité logique (UL) modifie, en état de marche, la distribution de la pompe hydraulique à volume variable (PW) en fonction de la différence entre une valeur prédéterminée (Vo) du degré de vide régnant à l'intérieur du réservoir collecteur (C) et la valeur (V) du degré de vide mesurée à l'intérieur du réservoir (C) par un premier capteur (SV).
 
6. Équipement à aspiration selon la revendication 4, caractérisé en ce que l'unité logique (UL) modifie, en état de marche, la distribution de la pompe hydraulique à volume variable (PVP) en fonction de la différence entre une valeur prédéterminée (Po) de la pression de distribution de la pompe de pression (PP) et la valeur (P) de la pression de distribution mesurée par un deuxième capteur (SP).
 
7. Équipement à aspiration selon la revendication 3, caractérisé en ce que l'unité logique (UL) gère, en état de marche, le moteur (M) et la pompe à vide (PV) par la séquence suivante d'étapes fonctionnelles :

- suite à une étape d'initialisation, si tant est qu'il y en ait, vérifier si la pompe à vide (PV) est activée : si la pompe à vide (PV) n'est pas activée, vérifier si la pompe de pression (PP) est activée ;

- si la pompe de pression (PP) est activée, réduire à zéro la distribution (CLV) de la pompe hydraulique à volume variable (PW) par rapport au moyen de transmission à vitesse réglable (TV) qui entraîne la pompe à vide (PV) avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, réduire à zéro la distribution (CLV) de la pompe à volume variable (PVV) par rapport au moyen de transmission à vitesse réglable (TV) qui entraîne la pompe à vide (PV) et amener le nombre de tours (GM) du moteur à une valeur minimale prédéterminée (GMmin), avant de retourner en régime d'attente ;

- si la pompe à vide (PV) est activée, vérifier que la valeur prédéterminée du degré de vide (Vo) est supérieure à la valeur (V) mesurée par un premier capteur (SV), moins une première quantité prédéterminée (K1), mais inférieure à ladite valeur (V) plus une deuxième quantité prédéterminée (K2) et attendre pendant un laps de temps t6 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, vérifier que la valeur prédéterminée du degré de vide (Vo) n'est pas supérieure à ladite valeur (V) moins la première quantité prédéterminée (K1) avant de vérifier si la valeur prédéterminée (Vo) du degré de vide est inférieure à ladite valeur (V) plus une deuxième quantité prédéterminée (K2) ;

- si la valeur prédéterminée du degré de vide (Vo) est supérieure à ladite valeur (V) moins la première quantité prédéterminée (K1), vérifier que la distribution (CLV) de la pompe à volume variable (PVV), par rapport au moyen de transmission à vitesse réglable (TV) qui entraîne la pompe à vide (PV), est inférieure à 100 %, avant de l'augmenter d'une quantité prédéterminée (dc), et attendre pendant un laps de temps prédéterminé t2 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, vérifier que le nombre de tours (GM) du moteur (M) est inférieur à une valeur maximale prédéterminée (GMmax), et que le nombre de tours (GPV) de la pompe à vide (PV) est inférieur à une valeur maximale prédéterminée (GPVmax) avant d'augmenter le nombre de tours (GM) du moteur (M) d'une quantité prédéterminée dg, et attendre pendant un laps de temps prédéterminé t1 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ;

- si le nombre de tours (GM) du moteur (M) n'est pas inférieur à la valeur maximale prédéterminée (GMmax) et/ou si le nombre de tours (GPV) de la pompe à vide (PV) n'est pas inférieur à la valeur maximale prédéterminée (GPVmax), vérifier que la valeur prédéterminée du degré de vide (Vo) n'est pas inférieure à ladite valeur (V) plus la deuxième quantité prédéterminée (K2) avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ;

- si la valeur prédéterminée du degré de vide (Vo) est inférieure à ladite valeur prédéterminée (V) plus la deuxième quantité prédéterminée (K2), vérifier que le nombre de tours (GM) du moteur (M) n'est pas supérieur à la valeur minimale prédéterminée (GMmin) avant de réduire, de la quantité prédéterminée dc, la distribution (CLV) de la pompe à volume variable (PW) par rapport au moyen de transmission à vitesse variable (TV) qui entraîne la pompe à vide (PP), et attendre pendant un laps de temps prédéterminé t3 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ;

- si le nombre de tours (GM) du moteur (M) est supérieur à la valeur minimale prédéterminée (GMmin), vérifier que la pompe de pression (PP) est activée et que la distribution (CLP) de la pompe à volume variable (PVP) par rapport au moyen de transmission à vitesse réglable (TP) qui entraîne la pompe de pression (PP) est supérieure à 99 %, avant de réduire, d'une quantité prédéterminée dc, la distribution (CLV) de la pompe à volume variable (PW) par rapport au moyen de transmission à vitesse réglable (TV) qui entraîne la pompe à vide (PV), et attendre pendant un laps de temps prédéterminé t5 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, réduire le nombre de tours (GM) du moteur (M) de la valeur prédéterminée dg et attendre pendant un laps de temps prédéterminé t4 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP).


 
8. Équipement à aspiration selon la revendication 7, dans lequel la pompe de pression (PP), en état de marche, est entraînée directement par le moteur (M), caractérisé en ce que, en état de marche, l'unité logique (UL) exécute la séquence suivante d'étapes fonctionnelles : vérifier que le nombre de tours (GM) du moteur (M) est supérieur à la valeur minimale prédéterminée (GMmin) et vérifier que la pompe de pression (PP) est activée, avant de réduire, d'une quantité prédéterminée dc, la distribution (CLV) de la pompe à volume variable (PW) par rapport au moyen de transmission à vitesse réglable (TV) qui entraîne la pompe à vide (PV), et attendre pendant un laps de temps prédéterminé t5 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, réduire le nombre de tours (GM) du moteur (M) de la quantité prédéterminée dg et attendre pendant un laps de temps prédéterminé t4 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP).
 
9. Équipement à aspiration selon la revendication 7, dans lequel la pompe de pression (PP), en état de marche, est entraînée directement par le moteur (M), caractérisé en ce que l'unité logique (UL) gère, en état de marche, le moteur (M) par la séquence suivante d'étapes fonctionnelles :

- suite à une étape d'initialisation, si tant est qu'il y en ait, vérifier si la pompe à vide (PV) est activée : si la pompe à vide (PV) n'est pas activée, vérifier si la pompe de pression (PP) est activée ;

- si la pompe de pression (PP) est activée, passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, amener le nombre de tours (GM) du moteur à une valeur minimale prédéterminée (GMmin), avant de retourner en régime d'attente ;

- si la pompe à vide (PV) est activée, vérifier que la valeur prédéterminée du degré de vide (Vo) est supérieure à la valeur (V) mesurée par un premier capteur (SV), moins une première quantité prédéterminée (K1), mais inférieure à ladite valeur (V) plus une deuxième quantité prédéterminée (K2) et attendre pendant un laps de temps t6 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, vérifier que la valeur prédéterminée du degré de vide (Vo) n'est pas supérieure à ladite valeur (V) moins la première quantité prédéterminée (K1) ; vérifier si la valeur prédéterminée (Vo) du degré de vide n'est pas inférieure à ladite valeur (V) plus une deuxième quantité prédéterminée (K2) et passer à la gestion du moteur (M) et de la pompe de pression (PP) ;

- si la valeur prédéterminée du degré de vide (Vo) est supérieure à ladite valeur (V) moins la première quantité prédéterminée (K1), vérifier que le nombre de tours (GM) du moteur (M) est inférieur à une valeur maximale prédéterminée (GMmax), et que le nombre de tours (GPV) de la pompe à vide (PV) est inférieur à une valeur maximale prédéterminée (GPVmax) ; augmenter le nombre de tours (GM) du moteur (M) d'une quantité prédéterminée dg, attendre pendant un laps de temps prédéterminé t1 et passer à la gestion du moteur (M) et de la pompe de pression (PP) ;

- si le nombre de tours (GM) du moteur (M) n'est pas inférieur à la valeur maximale prédéterminée (GMmax) et/ou si le nombre de tours (GPV) de la pompe à vide (PV) n'est pas inférieur à la valeur maximale prédéterminée (GPVmax), vérifier que la valeur prédéterminée du degré de vide (Vo) n'est pas inférieure à ladite valeur (V) plus la deuxième quantité prédéterminée (K2) avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ;

- si la valeur prédéterminée du degré de vide (Vo) est inférieure à ladite valeur prédéterminée (V) plus la deuxième quantité prédéterminée (K2), vérifier que le nombre de tours (GM) du moteur (M) n'est pas supérieur à la valeur minimale prédéterminée (GMmin) avant et attendre pendant un laps de temps prédéterminé t3 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ;

- si le nombre de tours (GM) du moteur (M) est supérieur à la valeur minimale prédéterminée (GMmin), vérifier que la pompe de pression (PP) est activée et que la distribution (CLP) de la pompe à volume variable (PVP) par rapport au moyen de transmission à vitesse réglable (TP) qui entraîne la pompe de pression (PP) est supérieure à 99 %, avant et attendre pendant un laps de temps prédéterminé t5 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, réduire le nombre de tours (GM) du moteur (M) de la valeur prédéterminée dg et attendre pendant un laps de temps prédéterminé t4 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP).


 
10. Équipement à aspiration selon la revendication 7, 8 ou 9, caractérisé en ce que les première et deuxième quantités prédéterminées (K1, K2) se situent entre 0 et 0,3 bar environ, les laps de temps d'attente (t1 - t6) se situe entre 0 et 60 secondes environ, et le nombre maximal de tours (GPVmax) de la pompe à vide (PV) se situe entre 500 et 5000 tours/minute environ.
 
11. Équipement à aspiration selon la revendication 10, caractérisé en ce que la première quantité prédéterminée (K1) représente environ 0,01 bar, la deuxième quantité prédéterminée (K2) représente environ 0,08 bar, les laps de temps d'attente t1 et t2 représentent environ 0,4 seconde, les laps de temps d'attente t3, t4 et t5 représentent environ 0,3 seconde, le laps de temps d'attente t6 représente environ 0,5 seconde, et le nombre maximal de tours (GPVmax) de la pompe à vide (PV) représente environ 1100 tours/minutes.
 
12. Équipement à aspiration selon la revendication 3, caractérisé en ce que l'unité logique (UL) gère, en état de marche, le moteur (M) et la pompe de pression (PP) par la séquence suivante d'étapes fonctionnelles :

- suite à une étape d'initialisation, si tant est qu'il y en ait, vérifier si la pompe de pression (PP) est activée : si la pompe de pression (PP) n'est pas activée, vérifier si la pompe à vide (PV) est activée ;

- si la pompe à vide (PV) est activée, réduire à zéro la distribution (CLP) de la pompe hydraulique à volume variable (PVP) par rapport au moyen de transmission à vitesse réglable (TP) qui entraîne la pompe de pression (PP) avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ; dans le cas contraire, réduire à zéro la distribution (CLP) de la pompe à volume variable (PVP) par rapport au moyen de transmission à vitesse réglable (TP) qui entraîne la pompe de pression (PP) et amener le nombre de tours (GM) du moteur à une valeur minimale prédéterminée (GMmin), avant de retourner en régime d'attente ;

- si la pompe de pression (PP) est activée, vérifier que la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) est supérieure à la valeur (P) mesurée par un deuxième capteur (SP), moins une troisième quantité prédéterminée (K3), mais inférieure à ladite valeur (P) plus une quatrième quantité prédéterminée (K4) et attendre pendant un laps de temps t12 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ; dans le cas contraire, vérifier que la valeur prédéterminée (Po) de la pression de distribution de la pompe de pression (PP) n'est pas supérieure à ladite valeur (p) moins la troisième quantité prédéterminée (K3) avant de vérifier si la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) est inférieure à ladite valeur (P) plus la quatrième quantité prédéterminée (K4) ;

- si la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) est supérieure à ladite valeur (P) moins la troisième quantité prédéterminée (K3), vérifier que la distribution (CLP) de la pompe à volume variable (PVP), par rapport au moyen de transmission à vitesse réglable (TP) qui entraîne la pompe de pression (PP), est inférieure à 100 %, avant de l'augmenter d'une quantité prédéterminée (dc), et attendre pendant un laps de temps prédéterminé t8 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ; dans le cas contraire, vérifier que le nombre de tours (GM) du moteur (M) est inférieur à la valeur maximale prédéterminée (GMmax), et que le nombre de tours (GPP) de la pompe de pression (PP) est inférieur à une valeur maximale prédéterminée (GPPmax) avant d'augmenter le nombre de tours (GM) du moteur (M) d'une quantité prédéterminée dg, et attendre pendant un laps de temps prédéterminé t7 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ;

- si le nombre de tours (GM) du moteur (M) n'est pas inférieur à la valeur maximale prédéterminée (GMmax) et/ou si le nombre de tours (GPP) de la pompe de pression (PP) n'est pas inférieur à la valeur maximale prédéterminée (GPPmax), vérifier que la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) n'est pas inférieure à ladite valeur (P) plus la quatrième quantité prédéterminée (K4) avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ;

- si ladite valeur de la pression de distribution (Po) de la pompe de pression (PP) est inférieure à ladite valeur prédéterminée (P) plus la quatrième quantité prédéterminée (K4), vérifier que le nombre de tours (GM) du moteur (M) n'est pas supérieur à la valeur minimale prédéterminée (GMmin) avant de réduire, de la quantité prédéterminée de, la distribution (CLP) de la pompe à volume variable (PVP) par rapport au moyen de transmission à vitesse variable (TP) qui entraîne la pompe de pression (PP) et attendre pendant un laps de temps prédéterminé t9 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ;

- si le nombre de tours (GM) du moteur (M) est supérieur à la valeur minimale prédéterminée (GMmin), vérifier que la pompe à vide (PV) est activée et que la distribution (CLV) de la pompe à volume variable (PW) par rapport au moyen de transmission à vitesse réglable (TV) qui entraîne la pompe à vide (PV) est supérieure à 99 %, avant de réduire, de la quantité prédéterminée dc, la distribution (CLV) de la pompe à volume variable (PW) par rapport au moyen de transmission à vitesse réglable (TP) qui entraîne la pompe de pression (PP), et attendre pendant un laps de temps prédéterminé t11 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ; dans le cas contraire, réduire le nombre de tours (GM) du moteur (M) de la valeur prédéterminée dg et attendre pendant un laps de temps prédéterminé t10 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV).


 
13. Équipement à aspiration selon la revendication 12, dans lequel la pompe de pression (PP), en état de marche, est entraînée directement par le moteur (M), caractérisé en ce que l'unité logique (UL) gère, en état de marche, le moteur (M) par la séquence suivante d'étapes fonctionnelles :

- suite à une étape d'initialisation, si tant est qu'il y en ait, vérifier si la pompe de pression (PP) est activée : si la pompe de pression (PP) n'est pas activée, vérifier si la pompe à vide (PV) est activée ;

- si la pompe à vide (PV) est activée passer à la gestion du moteur (M) et de la pompe à vide (PV) ; dans le cas contraire, amener le nombre de tours (GM) du moteur à une valeur minimale prédéterminée (GMmin), avant de retourner en régime d'attente ;

- si la pompe de pression (PP) est activée, vérifier que la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) est supérieure à la valeur (P) mesurée par un deuxième capteur (SP), moins une troisième quantité prédéterminée (K3), mais inférieure à ladite valeur (P) plus une quatrième quantité prédéterminée (K4) et attendre pendant un laps de temps t12 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ; dans le cas contraire, vérifier que la valeur prédéterminée (Po) de la pression de distribution de la pompe de pression (PP) n'est pas supérieure à ladite valeur (p) moins la troisième quantité prédéterminée (K3) avant de vérifier si la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) est inférieure à ladite valeur (P) plus la quatrième quantité prédéterminée (K4) ;

- si la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) est supérieure à ladite valeur (P) moins la troisième quantité prédéterminée (K3), vérifier que le nombre de tours (GM) du moteur (M) est inférieur à la valeur maximale prédéterminée (GMmax), et que le nombre de tours (GPP) de la pompe de pression (PP) est inférieur à une valeur maximale prédéterminée (GPPmax) avant d'augmenter le nombre de tours (GM) du moteur (M) d'une quantité prédéterminée dg, et attendre pendant un laps de temps prédéterminé t7 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ;

- si le nombre de tours (GM) du moteur (M) n'est pas inférieur à la valeur maximale prédéterminée (GMmax) et/ou si le nombre de tours (GPP) de la pompe de pression (PP) n'est pas inférieur à la valeur maximale prédéterminée (GPPmax), vérifier que la valeur prédéterminée de la pression de distribution (Po) de la pompe de pression (PP) n'est pas inférieure à ladite valeur (P) plus la quatrième quantité prédéterminée (K4) avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ;

- si ladite valeur de la pression de distribution (Po) de la pompe de pression (PP) est inférieure à ladite valeur prédéterminée (P) plus la quatrième quantité prédéterminée (K4), vérifier que le nombre de tours (GM) du moteur (M) n'est pas supérieur à la valeur minimale prédéterminée (GMmin) et attendre pendant un laps de temps prédéterminé t9 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ;

- si le nombre de tours (GM) du moteur (M) est supérieur à la valeur minimale prédéterminée (GMmin), vérifier que la pompe à vide (PV) est activée et que la distribution (CLV) de la pompe à volume variable (PW) par rapport au moyen de transmission à vitesse réglable (TV) qui entraîne la pompe à vide (PV) est supérieure à 99 %, et attendre pendant un laps de temps prédéterminé t11 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV) ; dans le cas contraire, réduire le nombre de tours (GM) du moteur (M) de la valeur prédéterminée dg et attendre pendant un laps de temps prédéterminé t10 avant de passer à la gestion du moteur (M) et de la pompe à vide (PV).


 
14. Équipement à aspiration selon la revendication 12, dans lequel la pompe à vide (PV), en état de marche, est entraînée directement par le moteur (M), caractérisé en ce que, en état de marche, l'unité logique (UL) exécute la séquence suivante d'étapes fonctionnelles : vérifier que le nombre de tours (GM) du moteur (M) est supérieur à la valeur minimale prédéterminée (GMmin) et vérifier que la pompe à vide (PV) est activée, avant de réduire, d'une quantité prédéterminée dc, la distribution (CLP) de la pompe à volume variable (PVP) par rapport au moyen de transmission à vitesse réglable (TP) qui entraîne la pompe de pression (PP), et attendre pendant un laps de temps prédéterminé t11 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP) ; dans le cas contraire, réduire le nombre de tours (GM) du moteur (M) de la quantité prédéterminée dg et attendre pendant un laps de temps prédéterminé t10 avant de passer à la gestion du moteur (M) et de la pompe de pression (PP).
 
15. Équipement à aspiration selon la revendication 12, 13 ou 14, caractérisé en ce que les troisième et quatrième quantités prédéterminées (K3, K4) se situent entre 0 et 50 bars environ, les laps de temps d'attente (t7 - t12) se situe entre 0 et 60 secondes environ, et le nombre maximal de tours (GPPmax) de la pompe de pression (PP) se situe entre 400 et 2500 tours/minute environ.
 
16. Équipement à aspiration selon revendication 15, caractérisé en ce que la troisième quantité prédéterminée (K3) représente environ 5 bars, la quatrième quantité prédéterminée (K4) représente environ 12 bars, les laps de temps d'attente t7 et t8 représentent environ 0,8 seconde, les laps de temps d'attente t9, t10 et t11 représentent environ 0,4 seconde, le laps de temps d'attente t12 représente environ 0,5 seconde, et le nombre maximal de tours (GPPmax) de la pompe de pression (PP) représente environ 1450 tours/minutes.
 
17. Équipement à aspiration selon la revendication 9 ou 13, caractérisé en ce que, en état de marche, lors de l'étape d'initialisation, l'unité logique (UL) acquiert une valeur prédéterminée de vitesse de sortie des moyens de transmission à vitesse réglable (respectivement TV et TP) qui entraînent respectivement la pompe à vide (PV) et la pompe de pression (PP).
 
18. Équipement à aspiration selon la revendication 17, caractérisé en ce que, en état de marche, lors de l'étape d'initialisation, l'unité logique (UL) acquiert une valeur prédéterminée de distribution (respectivement CLV et CLP) des pompes hydrauliques à volume variable (respectivement PPV et PVP) par rapport aux moyens de transmission à vitesse réglable (respectivement TV et TP) qui entraînent respectivement la pompe à vide (PV) et la pompe de pression (PP).
 
19. Équipement à aspiration selon les revendications 7 à 9 ou selon les revendications 13 à 15, caractérisé en ce que le nombre minimal de tours (GMmin) du moteur (M) se situe entre 100 et 1500 tours/minute environ, le nombre maximal de tours (GMmax) du moteur (M) se situe entre 500 et 4000 tours/minute environ, le pas d'augmentation/réduction dg du nombre de tours (GM) du moteur (M) se situe entre 1 et 250 tours/minute environ et le pas d'augmentation/- réduction dc de la distribution (respectivement CLV et CLP) de chacune des pompes à volume variable (respectivement PVV et PVP) représente une valeur entre environ 0,1 % et 50 %.
 
20. Équipement à aspiration selon la revendication 19, caractérisé en ce que le nombre minimal de tours(GMmin) du moteur (M) s'élève à environ 650 tours/minute, le nombre maximal de tours (GMmax) du moteur (M) s'élève à environ 1050 tours/minute, le pas d'augmentation/réduction dg du nombre de tours (GM) du moteur (M) représente environ 30 tours/minute environ et le pas d'augmentation/réduction de de la distribution (respectivement CLV et CLP) de chacune des pompes à volume variable (respectivement PVV et PVP) représente environ 20 %.
 




Drawing