(54)

Boil-off gas re-condenser

Boil-off-Gas-Rückkondensator

Re-condensateur de gaz vaporisat


(84) Designated Contracting States:
AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR

(43) Date of publication of application:
05.10.2011 Bulletin 2011/40

(73) Proprietor: Sener Ingenieria Y Sistemas, S.A.
48930 Las Arenas - Vizcaya (ES)

(72) Inventor:
  • Llabrés Veguillas, Javier
    28224 Pozuelo de Alarcón (Madrid) (ES)

(74) Representative: Carvajal y Urquijo, Isabel et al
Clarke, Modet & Co. Suero de Quiñones, 34-36
28002 Madrid
28002 Madrid (ES)


(56) References cited: : 
US-A- 3 837 821
US-A1- 2007 214 831
   
       
    Note: Within nine months from the publication of the mention of the grant of the European patent, any person may give notice to the European Patent Office of opposition to the European patent granted. Notice of opposition shall be filed in a written reasoned statement. It shall not be deemed to have been filed until the opposition fee has been paid. (Art. 99(1) European Patent Convention).


    Description

    TECHNICAL FIELD



    [0001] The mentioned invention consists of a Boil-off Gas (BOG) re-condenser for reliquefying boil-off gas generated by Liquefied Natural Gas (LNG)

    BACKGROUND



    [0002] A Liquefied Natural Gas receiving and re-gasification terminal serves to connect the continuous process of pressurisation, vaporisation of Liquefied Natural Gas and gas send-out, with the intermittent process of safely berthing and unloading of Liquefied Natural Gas Carriers using the buffering storage capacity of the LNG storage tanks.

    [0003] In general a Liquefied Natural Gas terminal will receive Liquefied Natural Gas by carrier and store it in cryogenic state, at boiling conditions, at approximately - 160 °C and slightly, above atmospheric pressures in Liquefied Natural Gas storage tanks. Liquefied Natural Gas from the Liquefied Natural Gas storage tanks is pressurized with the Low Pressure pumps and combined with re-condensed Boil Off Gas in the re-condenser. Then, Liquefied Natural Gas is pressurized by the High Pressure pumps and sent to the vaporizers, where it is vaporized at high-pressure and sent to the grid via the metering station.

    [0004] Cryogenic conditions need to be maintained in the entire terminal, including the unloading lines via circulating LNG.

    [0005] As result of the ambient heat in leak into the LNG storage tanks and all terminal lines, vapour is generated in the LNG storage Tanks. This vapour is called the Boil Off Gas. This BOG must be recovered in order to minimize atmospheric emissions and economical losses.

    [0006] The most common way of recovering BOG is taking it from the LNG Storage Tanks via the BOG compressors, where it is compressed and sent to the BOG re-condenser for re-liquefaction and combined with the send-out flow.

    [0007] The re-condenser is an apparatus where the BOG generated in the terminal is put in contact with sub-cooled LNG and is condensed, recovered and mixed with the rest of the LNG send-out flow rate.

    [0008] There are two main functions a re-condenser could carry out, one of them is to recondense and recover the BOG and the other is to serve as LNG buffer giving a hold up between LP pumps and HP pumps.

    [0009] Some re-condensers have both functions and others not.

    [0010] Other important characteristic is the operating pressure in the re-condenser. It could be fixed in a certain value, it could be fixed but operator could vary its value, it could be variable.

    [0011] There exists re-gasification terminals where re-condensers only carry out one of the main functions described above.

    [0012] A lot of re-condensers operate at fixed pressure. This implies spending a lot of energy associated cost due to compressor high duty. A re-condenser with different operating pressures shall reduce operating cost in compressors at high send-out rates by reducing its operating pressure and minimize the minimum send-out by increasing its operating pressure.

    [0013] Some re-condensers reported in difficulties and instability in the pressure control.

    [0014] A lot of re-condensers have big dimensions due to high hold-up times for the HP pumps. Reducing this dimension, maintaining the residence time via and operating bypass shall be a good solution.

    [0015] Instrumentation is simple in some re-condensers, this lead to out of control situations.

    [0016] Patent document US2007/214831-A1 discloses a boil-off gas re-condenser system which is able to operate in a wide range of operating conditions by using a re-condenser vessel with multiple packing beds. However, it is a complex system with improvable results in terms of pressure control stability.

    DESCRIPTION OF THE INVENTION



    [0017] The invention presented here is a two separated function re-condenser, with no interaction between the functionalities.

    [0018] Furthermore it includes a controlled bypass that allows reducing the buffer or accumulation characteristic via a sophisticated instrumentation and controls described below. This results in a smaller accumulation zone.

    [0019] It is a fixed pressure re-condenser, but this pressure could be changed within a range based on operator preferences. This reduces operating cost (saving energy) in compressors at high send-out rates by reducing re-condenser operating pressure and minimizes the minimum send-out by increasing re-condenser operating pressure.

    [0020] The object of present invention is to provide an apparatus (and its surrounding controls) that reliquifies all the BOG generated in the terminal, mixes it with the rest of LNG send-out and that provides a hold up time between LP pumps and HP pumps. This apparatus is a vessel which comprises two separated sections with no interference between them:
    • a top section which houses a packed-bed as a contact zone, in which Boil Off Gas, coming from a Boil Off Gas compressors discharge, is in contact with Liquefied Natural Gas, taken from the discharge of the LP pumps, for re-condensation.
    • a lower section as an accumulation zone, which serves as a liquid hold-up drum for the HP Liquefied Natural Gas pumps, in which it is introduced the surplus of Liquefied Natural Gas up to half maximum send-out via at least one level control,
    so that the surplus of Liquefied Natural Gas from half maximum send-out, bypasses the re-condenser via at least one flow control bypass valve.

    [0021] The BOG re-condenser is a bi-functional system (serves two functions) which solves the problems indicated above. These two functions are:
    • Function of re-condensing the Boil Off Gas (BOG) generated in the terminal.
    • Function of Liquefied Natural Gas (LNG) accumulation, giving a hold-up time for the HP pumps. It is an intermediate liquid storage between the LP pumps and the HP pumps.


    [0022] These two functions are carried out in the re-condenser system, which are divided in two different parts:
    1. a) The top section of the re-condenser houses a packed-bed in which BOG is contacted with LNG for re-condensation. The LNG is taken from the discharge of the LP pumps and the BOG is coming from the BOG compressors discharge. The re-condensation of BOG is possible because this vessel operates at higher pressure (operating pressure from 4 to 8 barg) than the LNG storage tanks. The LNG pumped from the tanks is sub-cooled at this higher operating pressure. The LNG could rise its temperature from the LP pumping temperature to the equilibrium bubble point at the recondensing pressure. All this thermal duty is used by the BOG to get cooled until its dew point and then to be re-condensed. This re-condensation is the result of a direct contact heat transfer between the two phases (both down-flow) in the packed bed. With higher operating pressure in the re-condenser, the higher bubble point temperature could be reached, and less LNG is required to re-condense the same quantity of BOG.
    2. b) The lower section serves as a liquid hold-up drum for the HP LNG pumps. The re-condenser is elevated from floor and the skirt height together with the liquid level in the vessel (plus some sub-cooling degree) provides the required NPSH for the HP pumps.


    [0023] This parts are separated in such a way that the recondensing packing contact zone is located above the lower accumulation zone. The resulting vessel has two different diameters, being the lower one of bigger dimension. The two zones are completely separated, and there is no interference between them (packing bed is not allowed to be flooded with LNG (Liquefied Natural Gas)).

    [0024] LNG is feed to the vessel via three paths. The top one is used for recondensing the BOG and maintain the pressure stable. This flow is controlled either via a pressure cascade controller or via a function of the BOG real mass flow entering the re-condenser. Operator could select the way pressure is controlled.

    [0025] The surplus of LNG (up to half maximum send-out) is introduced in the lower zone (accumulation one) via level control. This is a simple level control.

    [0026] The surplus of LNG (from half maximum send-out) bypasses the re-condenser via flow control. This flow control could be done either based on a function of the total LNG volumetric flow to re-condenser or via a function of the metering station send-out set point. Operator could select the way the bypass is controlled.

    [0027] As result of this scheme, the accumulation zone does exist, but is half the size of other re-condenser type due to the flow controlled bypass.

    [0028] The controlled bypass control can be done based on:
    • flow control based on total LNG flow to re-condenser (combined flow of the three LNG feeds)
    • based on flow control based on one or two LNG feeds,
    • based on send-out flow set point, or
    • based on actual measured send-out flow.


    [0029] The controlled bypass can control the flow between some specific send-our rate (not exactly the half maximum send-out) up to the maximum send-out rate.

    [0030] Padding gas connection, controlled vent connection (protective pressure controllers) and PSVs are located in the bottom zone. Padding gas and controlled vent working pressures are outside of the normal controlled pressure range. Level protective controller (following the same philosophy as followed in the pressure control) are also providing actions on the controlled bypass.

    [0031] The boil off gas re-condenser of the invention does not have a flow control that maintains always a small LNG flow flowing to the accumulation zone to maintain always a subcooling degree in the HP pump, giving NPSH (Net Positive Suction Head). NPSH is given by re-condenser height only.

    [0032] The advantages of the boil off gas re-condenser of the invention are:
    • Pressure control variable and more stable.
    • No control valves in the BOG inlet.
    • Operator has some flexibility in deciding the way the control strategy is to be carried out for pressure control and bypass control.
    • Accumulation zone is not sized for maximum flow, it is sized for half maximum flow.
    • No interaction between the recondensing and accumulation zones due to maintain them separated.


    [0033] For stable operation of the BOG re-condenser, there are controlled the operating pressure; Liquefied Natural Gas (LNG) Level inside the vessel and Liquefied Natural Gas (LNG) flow rate bypassing the re-condenser.

    [0034] All terminals have limitations on HHV (High Heating Value) and Wobbe Index specifications in the send-out gas to the grid. In order to adjust the quality of the send-out gas, where needed, Nitrogen is mixed with it.

    [0035] Wobbe index and HHV adjustment is carried out introducing Nitrogen, in gaseous phase, liquid phase or both at a time in the re-condenser

    BRIEF DESCRIPTION OF THE DRAWINGS



    [0036] The description of the different components of the system provided above is complemented with a series of drawings aimed at facilitating understanding of its structure and operation.

    Figure 1 is a sketch where the main flow paths are depicted

    Figure 2 is a sketch of the process control loops of the BOG re-condenser for pressure, level, and operational bypass.



    [0037] In said figures the following references are indicated:

    1.- Flow controller FC1

    2.- Flow control quench valve FV1

    3.- Level control valve LV

    4.- Flow control valve FV2

    5.- Flow controller FC2

    6.- Level controller LC1

    7.- Packing bed P1

    8.- Isolation valve 1 V1

    9.- Isolation valve 2 V2

    10.- Pressure controller PC1

    11.- Re-condensing packing contact zone

    12.- Lower accumulation zone

    13.- Pressure safety valve PSV

    14.- BOG mass flow Fi

    15.- Re-condenser vessel

    16.- Padding gas control valve PV1

    17.- Pressure control loop of padding gas PC2

    18.- Control valve of the pressure release PV2

    19.- Pressure control loop of the pressure release PC3

    20.- Level controller acting in case low LNG level LC2

    21.- Level controller acting in case high LNG level LC3

    22.- LNG top inlet

    23.- LNG Bottom inlet

    24.- LNG controlled bypass line

    25.- Maintenance bypass line

    26.- HP pump vent line

    27.- HP kick-back line

    28.- LNG outlet line

    29.- Outlet LNG line to HP pump

    30.- Inlet Padding gas line

    32.- LNG supply from LP pumps

    33.- Controlled vent connection lines


    DETAIL DESCRIPTION



    [0038] Re-condenser design shown in Figure 1 is based on a fixed pressure re-condenser type and comprises a vessel (15) feeded by three Liquefied Natural Gas lines, in which the vessel (15) comprises two separated zones with no interference between them:
    • a re-condensing packing contact zone (11), located in a top section of the vessel (15), which houses a packing bed (7), in which Boil Off Gas, coming from a Boil Off Gas compressors discharge (14), is in contact with Liquefied Natural Gas (22), taken from the discharge of LP pumps (32), for re-condensation.
    • a lower accumulation zone (12), located in a lower section of the vessel (15), which serves as a liquid hold-up drum for the HP Liquefied Natural Gas pumps, in which it is introduced the surplus of Liquefied Natural Gas (23) up to half maximum send-out via a level control which comprises one level control valve (3),
    so that the surplus of Liquefied Natural Gas from half maximum send-out, bypasses the re-condenser via a flow control bypass (24) which comprises one flow control bypass valve (4).

    [0039] This re-condenser has the option to select the pressure set point by the operator in the range of 4 to 8 barg. This set point pressure will be selected based on gas send out flow rate. The desired pressure is controlled with LNG flow to top part of re-condenser.

    [0040] The operating pressure range (in this case described from 4 to 8 barg) could vary based on client and operator requirements.

    [0041] The pressure of the re-condenser could be set from the lowest value of 4 barg at high send-out rates to the maximum value, 8 barg, with minimum send-out rates.

    [0042] If the pressure in the re-condenser is low, more LNG flow is required to recondense the same quantity of BOG than the required flow at higher pressure. When high send-out rate is required, the pressure in the re-condenser could be lowered because there is no LNG flow limitation (we are far from the minimum send-out) to the contact top section. This is desirable because the BOG compressors require less working duty at low discharge pressure, saving energy.

    [0043] High pressure (8 barg) is set in the re-condenser during minimum send-out requirement. Also during minimum send-out requirements, the BOG generation is higher, because the liquid level in the LNG storage tanks is going-down very slowly.

    [0044] When send-out rates are higher than minimum send-out rate, pressure in the re-condenser could be set between 4 and 8 barg.

    [0045] The re-condenser is provided with a padding gas entry from the vaporisers send out, upstream of metering station. This padding gas allows for maintaining the re-condenser pressure at a minimum value. This flow is controlled by a pressure control loop acting on a control valve. In a holding mode of operation, with high send-out rates, the BOG generation in the terminal could be close to zero. Then, the BOG compressors will stop. The re-condenser pressure will go down and the padding gas must be required.

    [0046] The re-condenser is provided also with a direct controlled vent connection back to the LNG Storage Tanks. This is to prevent high pressure in the re-condenser and prevents the PSV to open. This release is controlled with a pressure control loop acting on a control valve.

    [0047] At least one pressure safety valve (13) is the last re-condenser protection against overpressure. Two pressure safety valves could be also fitted, one in operation and the other in spare, to facilitate on-line maintenance of one of these valves. These valves are mechanically interlocked, one is interlocked closed and the other open. Each valve is designed for the complete release flow.

    [0048] BOG re-condenser inlet and outlet lines description is shown in Figure 1 in which the main flow paths are depicted, to follow the description:

    LNG top inlet for re-condensation (22)



    [0049] In the top part of the re-condenser is introduced the required sub-cooled LNG to re-condense all the BOG, reaching the equilibrium. This flow is controlled to maintain the desired pressure inside (from 4 to 8 barg).

    BOG inlet to the top for re-condensation (14)



    [0050] In the top part of the re-condenser is also introduced the BOG from the BOG compressors to be re-condensed.

    LNG bottom inlet to the re-condenser (23)



    [0051] When the send out rate is higher than the required flow in the top section, the remaining LNG is supplied to the bottom re-condenser section up to more or less half of maximum send-out. The bottom hold up part of the re-condenser is to be calculated in seconds (between 15 and 60 seconds) of the half maximum send-out associated LNG flow.

    LNG controlled bypass (24)



    [0052] If send-out rates are also higher than half the maximum send-out LNG flow associated, the remaining of the send-out flow bypasses the re-condenser. This could be done by using a controlled bypass (control valve required).

    [0053] The controlled bypass control is done based on flow control based on total LNG flow to re-condenser (combined flow of the three LNG feeds)

    Maintenance bypass (25)



    [0054] This bypass is provided to put out of service the re-condenser and keep working the terminal. This bypass is located outside the isolation valves (8 and 9).

    LNG outlet (28)



    [0055] This line connects the outlet of the re-condenser with the suction of the HP pumps (29).

    HP pumps vent line (26)



    [0056] This line connects the vent lines from the HP pumps to the re-condenser.

    HP pumps kick-back line (27)



    [0057] This line connects the kick-back lines from the HP pumps to the re-condenser. This line could contain two phase flow.

    Padding gas connection (30) and controlled vent connection (33)



    [0058] The padding gas line (30) connects the outlet of the vaporisers (upstream of the metering station) with the re-condenser on low pressure operation. This allows entering LNG from the send-out to keep the pressure in the vessel in a minimum value.

    [0059] The controlled vent connection line (33) connects the re-condenser with the LNG Storage Tanks on high pressure control. This prevents the pressure to increase in the vessel by opening the control valve, venting to the BOG header.

    [0060] Figure 2 shows the process control loops of the BOG re-condenser for pressure, level, and operational bypass.

    a) Re-condenser pressure control



    [0061] The BOG re-condenser operates in a fixed pressure mode. The operator selects the desired operating pressure of the BOG re-condenser between 4 to 8 barg. Other operating pressure range could be done based on client requirements. The pressure in the BOG re-condenser is controlled via flow controller (1) (Flow Controller). The flow controller (1) manipulates LNG quench valve (2) which supplies LNG to the packing bed (7) section of the BOG re-condenser, the packing bed (7) consisting either in a ramdon packing or a structured packing. The pressure in the BOG re-condenser can be as low as 4 barg during periods of high send-out flow and as high as 8 barg during periods of minimum send-out rate.

    [0062] The pressure in the BOG re-condenser can be controlled via either a feed-forward pressure control loop or via feed-back pressure control loop. The preferred system can be selected by the operator.

    a.1) Feed-forward re-condensation/pressure control



    [0063] The main function of the flow controller (1) controlling the flow rate of sub-cooled LNG to the top is to keep the BOG re-condenser at a fixed pressure and to operate in a stable operating region.

    [0064] The set-point of the flow controller (1) is derived from a function of a specific factor and the measured mass BOG flow (14) that enters into the re-condenser. This specific factor is the result from a function of the desired operator pressure set point, the measured pressure in the vessel and a temperature correction for both LNG and BOG. Once the operator introduces the pressure set point, depending on the BOG flow, the LNG flow is calculated and set to the LNG flow controller (1) as set point. The pressure set-point can be adjusted by the operator to achieve the desired operating pressure of the BOG re-condenser.

    [0065] - This type of control is quicker than using only a pressure cascade feed-back control over the LNG flow controller (1).

    a.2) Feed-back re-condensation/pressure control



    [0066] The main function of the pressure controller (10) is controlling the required fixed pressure in the BOG re-condenser. The pressure controller operates via a cascade control loop, re-setting the set-point of the LNG flow controller (1) to keep the BOG re-condenser at the desired pressure.

    a.3) Protective pressure control



    [0067] During the re-condenser operation the following protective pressure controls are available:
    • The re-condenser is provided with a padding gas (30) entry from the vaporisers send out, upstream of metering station. This padding gas (30) allows for maintaining the re-condenser operating pressure at a minimum pressure set point (lower than 4 barg). This flow is controlled by a pressure control loop (17) acting on a padding gas control valve (16).
    • The re-condenser is provided also with a controlled vent connection to the BOG header. This is to prevent high pressure (higher than 8 barg) in the re-condenser and prevents the pressure safety valve (13) to open. This release is controlled with pressure control loop (19) acting on a control valve (18). This is achieved with the separated pressure control loop (19).


    [0068] However, only one pressure controller either for padding gas (30) as well as for the pressure release can be included.

    b) Re-condenser level control



    [0069] The level in the re-condenser bottom section is controlled using level controller (6) which manipulates the LNG bottom inlet valve (3) (also two level control valves (3) can be included). If the level rises, the level controller (6) closes the valve (3). If the level drops the response of the level controller is vice versa.

    [0070] Protective level controllers are installed for protection against low and high level:
    • In case of low level, a level controller (20) reduces the HP send-out flow to keep the level, closing the vaporisers inlet control valves, overriding the signal from metering station.
    • In case of high level a protective level controller (21) will override via a selection processes the signal to the LNG bottom inlet valve (3), LNG controlled bypass control valve (4) (also two flow control bypass valves can be included) and to the LNG top flow control quench valve (2), closing them if necessary

    c) Re-condenser bypass control



    [0071] This operating bypass is located between the BOG re-condenser isolation valves (8 and 9). The bottom section has been sized for an LNG flow rate equivalent to half maximum send-out. When the send-out through the LNG terminal exceeds this value the LNG will be sent via an operational bypass to the suction header of the HP pumps.

    [0072] A flow controller (5) in the operational bypass receiving its set point cascaded from the overall terminal send-out set point will open the bypass valve (4) if the send-out flow rate exceeds the half maximum send-out rate. Also it is possible to use the total LNG flow rate to the re-condenser to control this bypass by a function. The operator will decide the control to be used.


    Claims

    1. Boil-off gas re-condenser system comprising:

    - a re-condenser vessel (15) feeded by liquefied natural gascomprising:

    • a boil-off gas inlet (14);

    • two separated zones with no interference between them:

    a re-condensing packing contact zone (11) located in a top section of the re-condenser vessel (15) and housing a packing bed (7) for re-condensation of boil-off gas coming from a boil-off gas compressors discharge and entering the boil-off gas inlet (14), when contacting with sub-cooled liquefied natural gas taken from the discharge of low-pressure pumps (32);

    a lower accumulation zone (12), located in a lower section of the re-condenser vessel (15), which serves as a liquid hold-up drum for the high-pressure liquefied natural gas pumps (29), in which it is introduced a surplus of liquefied natural gas taken from the discharge of low-pressure pumps (32) via a level controller (6),

    • a liquefied natural gas top inlet (22) arranged at the top section of the re-condenser vessel (15) and through which the required sub-cooled liquefied natural gas to re-condense the boil-off gas is introduced;

    • a liquefied natural gas bottom inlet (23) arranged at the lower accumulation zone (12) and through which the surplus of liquefied natural gas up to some specific send-out rate is introduced;

    - a liquefied natural gas flow controller (1) for controlling the flow rate of sub-cooled liquefied natural gas introduced into the re-condenser vessel (15) through the liquefied natural gas top inlet (22) to maintain the desired pressure inside the re-condenser vessel (15);

    - a level controller (6) which comprises at least one level control valve (3) for controlling the level of the liquefied natural gas in the lower accumulation zone (12);

    characterized in that the system further comprises:

    - a liquefied natural gas controlled bypass line (24) for bypassing the re-condenser vessel (15) with the remaining of the send-out flow of liquefied natural gas taken from the discharge of low-pressure pumps (32);

    - a flow controller (5) which comprises at least one flow control bypass valve (4) for controlling the flow of the remaining liquefied natural gas going through the bypass line (24) between some specific send-out rate up to the maximum send-out rate;

    and in that the boil-off gas inlet (14) is arranged at the top section of the re-condenser vessel (15).
     
    2. Boil-off gas re-condenser system according to claim 1, further comprising a padding gas entry (30) from vaporisers send-out upstream a metering station for maintaining the re-condenser vessel (15) operating pressure at a minimum pressure set point and a controlled vent connection (33) to prevent high pressure in the re-condenser vessel (15).
     
    3. Boil-off gas re-condenser system according to claim 2, further comprising at least one padding gas control valve (16) for padding gas and at least one control valve (18) for the pressure release.
     
    4. Boil-off gas re-condenser system according to claim 2 or 3, further comprising a pressure controller loop (17) for padding gas and a pressure controller loop (19) for the pressure release.
     
    5. Boil-off gas re-condenser system according to any of previous claims, further comprising a flow control quench valve (2) controlled by the liquefied natural gas flow controller (1), for supplying LNG to the packing bed.
     


    Ansprüche

    1. Rückkondensatorsystem für verdunstetes Gas (boil-off gas) umfassend:

    - einen Rückkondensatorbehälter (15), welcher durch Flüssigerdgas gespeist wird, umfassend:

    • einen Einlass für verdunstetes Gas (14);

    • zwei getrennte Bereiche ohne Schnittstelle zwischen sich:

    einen Rückverflüssigungsfüllkörperkontaktbereich (11), welcher in einem oberen Abschnitt des Rückkondensatorbehälters (15) gelegen ist und in welchem ein Füllkörperbett (7) zur Rückverflüssigung von verdunstetem Gas aufgenommen ist, welches von einem Kompressorauslass für verdunstetes Gas stammt und in den Einlass für verdunstetes Gas (14) eintritt, wenn es mit unterkühltem Flüssigerdgas in Kontakt tritt, welches aus dem Auslass von Niederdruckpumpen (32) entnommen wird;

    einen unteren Sammelbereich (12), welcher in einem unteren Abschnitt des Rückkondensatorbehälters (15) gelegen ist, welcher als Flüssigkeitsaufhaltetrommel für die Hochdruck-Flüssigerdgaspumpen (29) dient, in welche ein Überschuss von Flüssigerdgas eingeführt ist, welches vom Auslass von Niederdruckpumpen (32) über einen Pegelregler (6) entnommen wird,

    • einen oberen Flüssigerdgaseinlass (22), welcher am oberen Abschnitt des Rückkondensatorbehälters (15) angeordnet ist und durch welchen das benötigte unterkühlte Flüssigerdgas zum Rückverflüssigen des verdunsteten Gases eingelassen wird;

    • einen unteren Flüssigerdgaseinlass (23), welcher im unteren Sammelbereich (12) angeordnet ist und durch welchen der Überschuss von Flüssigerdgas bis zu einer spezifischen Ausgabegeschwindigkeit eingelassen wird;

    - einen Flüssigerdgasströmungsregler (1) zum Regeln der Strömungsgeschwindigkeit von unterkühltem Flüssigerdgas, welches durch den oberen Flüssigerdgaseinlass (22) in den Rückkondensatorbehälter (15) eingelassen wird, um den gewünschten Druck innerhalb des Rückkondensatorbehälters (15) aufrecht zu erhalten;

    - einen Pegelregler (6), welcher zumindest ein Pegelregelventil (3) zum Regeln des Pegels des Flüssigerdgases im unteren Sammelbereich (12) umfasst;

    dadurch gekennzeichnet, dass das System weiterhin Folgendes umfasst:

    - eine durch Flüssigerdgas gesteuerte Umgehungsleitung (24) zum Umgehen des Rückkondensatorbehälters (15) mit dem Rest des ausgegebenen Stroms von Flüssigerdgas, welches vom Auslass der Niederdruckpumpen (32) entnommen wird;

    - einen Strömungsregler (5), welcher zumindest ein Strömungsregelumgehungsventil (4) zum Regeln der Strömung des restlichen Flüssigerdgases, welches durch die Umgehungsleitung (24) strömt, von einer bestimmten Ausgabegeschwindigkeit bis zur maximalen Ausgabegeschwindigkeit, umfasst;

    und dass der Einlass für verdunstetes Gas (14) am oberen Abschnitt des Rückkondensatorbehälters (15) angeordnet ist.
     
    2. Rückkondensatorsystem für verdunstetes Gas nach Anspruch 1, weiterhin umfassend einen Füllgaseinlass (30) von Verdampferausspeisungen stromaufwärts einer Dosierstation zum Aufrechterhalten des Betriebsdrucks des Rückkondensatorbehälters (15) mit einem Mindestdrucksollwert und eine gesteuerte Entlüftungsverbindung (33) zum Vermeiden eines hohen Drucks im Rückkondensatorbehälter (15).
     
    3. Rückkondensatorsystem für verdunstetes Gas nach Anspruch 2, weiterhin umfassend zumindest ein Füllgasregelventil (16) für Füllgas und zumindest ein Regelventil (18) für den Druckablass.
     
    4. Rückkondensatorsystem für verdunstetes Gas nach Anspruch 2 oder 3, weiterhin umfassend einen Druckregelkreislauf (17) für Füllgas und einen Druckregelkreislauf (19) für den Druckablass.
     
    5. Rückkondensatorsystem für verdunstetes Gas nach einem der vorherigen Ansprüche, weiterhin umfassend ein Strömungsregeldrosselventil (2), welches durch den Flüssigerdgasströmungsregler (1) gesteuert wird, um Flüssigerdgas zum Füllkörperbett zu befördern.
     


    Revendications

    1. Système recondenseur de gaz d'évaporation comprenant :

    - un récipient recondenseur (15) alimenté par du gaz naturel liquéfié comprenant :

    • une entrée de gaz d'évaporation (14) ;

    • deux zones séparées sans aucune interférence entre elles :

    une zone de contact du garnissage de recondensation (11) située dans une section supérieure du récipient recondenseur (15) et logeant un lit de garnissage (7) pour la recondensation du gaz d'évaporation provenant d'un refoulement des compresseurs de gaz d'évaporation et pénétrant dans l'entrée de gaz d'évaporation (14), lorsqu'il entre en contact avec le gas naturel liquéfié sous-refroidi pris à partir du refoulement des pompes à basse pression (32) ;

    une zone d'accumulation inférieure (12), située dans une section inférieure du récipient recondenseur (15), qui sert de bidon de rétention de liquide pour les pompes à haute-pression de gas naturel liquéfié (29), dans lequel on introduit un surplus de gas naturel liquéfié pris à partir du refoulement des pompes à basse pression (32) via un régulateur de niveau (6),

    • une entrée supérieure de gas naturel liquéfié (22) disposée sur la section supérieure du récipient recondenseur (15) et à travers laquelle le gas naturel liquéfié sous-refroidi nécessaire pour recondenser le gaz d'évaporation est introduit ;

    • une entrée du dessous de gaz naturel liquéfié (23) disposée sur la zone d'accumulation inférieure (12) et à travers laquelle le surplus de gaz naturel liquéfié jusqu'à un débit d'émission spécifique est introduit ;

    - un régulateur d'écoulement de gaz naturel liquéfié (1) pour réguler le débit d'écoulement de gaz naturel liquéfié sous-refroidi introduit dans le récipient recondenseur (15) à travers l'entrée supérieure de gaz naturel liquéfié (22) pour maintenir la pression désirée à l'intérieur du récipient recondenseur (15) ;

    - un régulateur de niveau (6) qui comprend au moins une valve de régulation de niveau (3) pour réguler le niveau du gas naturel liquéfié dans la zone d'accumulation inférieure (12) ;

    caractérisé en ce que le système comprend en outre :

    - une conduite de dérivation régulée de gaz naturel liquéfié (24) pour dériver le récipient recondenseur (15) avec le reste de l'écoulement d'émission de gas naturel liquéfié pris à partir du refoulement des pompes à basse-pression (32) ;

    - un régulateur d'écoulement (5) qui comprend au moins une valve de dérivation de régulation d'écoulement (4) pour réguler l'écoulement du reste de gas naturel liquéfié passant à travers la conduite de dérivation (24) entre un débit d'émission spécifique jusqu'à un débit d'émission maximum ;

    et en ce que l'entrée de gaz d'évaporation (14) est disposée sur la section supérieure du récipient recondenseur (15).
     
    2. Système recondenseur de gas d'évaporation selon la revendication 1, comprenant en outre une entrée de gaz de remplissage (30) provenant d'émissions de vaporisateurs en amont d'une station de comptage pour maintenir la pression opérationnelle du récipient recondenseur (15) à un point de consigne de pression minimum et une connection d'aération régulée (33) pour éviter une pression élevée dans le récipient recondenseur (15).
     
    3. Système recondenseur de gaz d'évaporation selon la revendication 2, comprenant en outre au moins une valve de régulation de gaz de remplissage (16) pour le gaz de remplissage et au moins une valve de régulation (18) pour le relâchement de pression.
     
    4. Système recondenseur de gaz d'évaporation selon les revendications 2 ou 3, comprenant en outre une boucle de régulation de pression (17) pour le gaz de remplissage et une boucle de régulation de pression (19) pour le relâchement de pression.
     
    5. Système recondenseur de gaz d'évaporation selon l'une des revendications précédentes, comprenant en outre une valve de détente (2) de régulation d'écoulement régulée par le régulateur d'écoulement de gaz naturel liquéfié (1), pour fournir du GNL au lit de garnissage.
     




    Drawing











    Cited references

    REFERENCES CITED IN THE DESCRIPTION



    This list of references cited by the applicant is for the reader's convenience only. It does not form part of the European patent document. Even though great care has been taken in compiling the references, errors or omissions cannot be excluded and the EPO disclaims all liability in this regard.

    Patent documents cited in the description