[0001] The present invention relates to a method of preparing a system for a maintenance
operation, said system comprising
- a first subsystem containing a super-atmospheric gas,
- a second subsystem, and
- a third subsystem between the first subsystem and the second subsystem;
said first subsystem and said second subsystem being connected via an intermediate
subsystem capable of allowing gas to flow between the first subsystem and the second
subsystem via the third subsystem, said intermediate subsystem comprising
- a first sealing valve seat,
- a second valve seat between the first sealing valve seat and the second subsystem,
and
- a vent opening between the first sealing valve seat and the second valve seat;
said third subsystem and said second subsystem being connected via a further intermediate
subsystem capable of allowing gas to flow between the third subsystem and the second
subsystem, said further intermediate subsystem comprising
- a third sealing valve seat,
- a fourth valve seat between the third sealing valve seat and the third subsystem,
and
- a second vent opening between the third sealing valve seat and the fourth valve seat;
said method comprising
- the discharge of gas present between the first sealing valve seat and the second valve
seat via the vent opening before performing a maintenance step of the maintenance
operation downstream of said second valve seat with respect to the first sealing valve
seat, and
- the discharge of gas present between the third sealing valve seat and the fourth valve
seat via the second vent opening before performing a maintenance step of the maintenance
operation between the second valve seat and the fourth valve seat.
[0002] Systems comprising super-atmospheric gas are well known in the art. They are for
example systems comprising natural gas, syngas, or carbon dioxide, where the gas is
treated, or increased or reduced in pressure. Such a gas may thus be flammable, toxic
or otherwise constitute a hazzard. Often it is paramount that a plant comprising such
a system remains operational despite the maintenance, or that the downtime for maintenance
is kept to a minimum. The presence of gas escaped from the system at the location
where maintenance is to be performed may however pose a risk for people performing
the maintenance. Depending on the job at hand, these may be expensive specialists
and the number of them can be considerable. If ambient gas measurements at the location
where maintenance is to be performed show that the leaked gas levels are above what
is acceptable according to safety procedures or allowable, the resulting delay can
be very costly. To prevent gas in the intermediate system from passing to the (ambient)
atmosphere at the location where the maintenance operation is to be performed, it
is known to block gas from passing from the first subsystem into the intermediate
subsystem using the first sealing valve seat, and then bleed the gas from the intermediate
subsystem via a vent opening into the outside atmosphere.
[0003] The object of the present invention is to provide a method with a reduced risk of
delay and/or an increased level of safety and/or to improve the availability of a
plant or a larger part thereof. This in particular in case of leaky or potentially
leaking seals of the valve seats.
[0004] To this end, a method according to the preamble is characterized in that the method
comprises before performing a maintenance step of the maintenance operation
- applying suction to the vent opening for discharging the gas present between the first
sealing valve seat and the second valve seat before performing said maintenance step
- the discharge of gas present between the third sealing valve seat and the fourth valve
seat via the second vent opening between the second valve seat and the fourth valve
seat by applying suction to the second vent opening;
wherein the suction is applied to achieve sub-atmospheric pressure in at least one
intermediate system of the system.
[0005] By applying suction to both the first vent opening and the second vent opening the
risk is effectively reduced that gas present in the first subsystem can pass the second
valve seat and reach the location where maintenance is to be performed. This may occur
if the first sealing valve seat and the second valve seat don't properly seal. Thus,
according to the invention, the third subsystem can be isolated from the first and
second subsystem and subjected to maintenance without having to depressurize either
of the first and second subsystems.
[0006] In the present application, maintenance includes any work on a third subsystem, whether
it is inspection, cleaning, repair, modification, or replacement of a part. A maintenance
operation is a series of one or more maintenance steps, and the method according to
the invention specifies that at least one of these is not performed before the discharge
of gas using suction. The third subsystem typically comprises an apparatus such as
a compressor, a flow metering systeem, a gas drying equipment, a tank or a vessel,
a filter separator, a heat exchanger, a well head, or a vapour recovery unit.
[0007] The intermediate subsystems comprise for example a ball valve, said ball valve comprising
the valve seats and the vent opening.
[0008] Active discharge (suction) of gas is achieved using a vacuum-pump.
[0009] By way of example, a sub-atmospheric pressure between the first sealing valve seat
and the second valve seat prevents gas from flowing past it to the second subsystem.
Any sub-atmospheric pressure is effective, however minute. For practical purposes,
the sub-atmospheric pressure is at least 0.02 Bar below ambient atmospheric pressure,
preferably at least 0.05 Bar and more preferably at least 0.08 Bar. A deeper sub-atmospheric
pressure makes the method less susceptible to any changes in sub-atmospheric pressure
applied or other disturbances.
[0010] It is preferred that both intermediate subsystems are at sub-atmospheric pressure.
[0011] In the present application, the term gas also encompasses vapour. The term 'sealing
valve seat' is a seat for blocking the flow of pressurized gas from a pressurized
subsystem to a subsystem at a lower pressure, such as a depressurized subsystem.
[0012] Preferably, the gas is discharged using a bleed conduit that releases the gas from
the intermediate subsystem into the outside atmosphere at a safe location away from
the location where maintenance is to be performed. The bleed line comprises between
a pressure gauge and a vacuum pump a valve, e.g. an on-off valve, a control valve,
a pressure regulator, or a non-return valve.
[0013] WO2005/026603 discloses a method of vacuum-purging gas in a pipe or tank.
[0014] According to a favourable embodiment, the intermediate subsystem, the third subsystem
and the further intermediate subsystem define a branche connecting the first subsystem
with the second subsystem, the system further comprising a second branch connecting
the first subsystem and the second subsystem.
[0015] Such a system allows for maintenance of the third subsystem of one branch while the
other branch remains operational, albeit the system operates possibly at a lower capacity.
[0016] According to a favourable embodiment, the system comprises a pressure gauge for measuring
the pressure of an intermediate subsystem of the system.
[0017] This gives an indication of the safety of the area where maintenance is to be carried
out. The pressure gauge can also be used to control the vacuum pump used to provide
suction. Also, the pressure gauge can be used in combination with a PLC to detect
a sudden leak rate (exceeding of a preset pressure gradient limit) or a leak rate
beyond the capacity of the suction system (exceeding of a preset pressure limit) and
can be used to generate an alarm at the location where the maintenance is performed
and/or in the Control Room without delay in case of a developping potential dangerous
situation.
[0018] According to a favourable embodiment, the system comprises a pressure gauge for measuring
the pressure upstream of a vacuum pump providing said suction, the flow resistance
R
vv-pgbetween i) the location of the gas between the first sealing valve seat and the second
valve seat and ii) the location of the pressure gauge being lower than the flow resistance
R
pg-vp between i) the location of the pressure gauge and ii) the vacuum pump.
[0019] Thus the risk can be reduced that in case of strong leakage by the first sealing
valve seat, the pressure measured by the pressure gauge represents the pressure between
the first sealing valve seat and the second valve seat, with a sub-atmospheric reading
indicating that no gas will pass from the first subsystem past the second valve seat.
The relatively high flow resistance between the pressure gauge and the vacuum pump
can be achieved using a constriction. For practical purposes, the constriction will
be balanced by the desire to effectively extract gas to be discharged by the vacuum
pump.
[0020] According to a favourable embodiment, the gas extracted by suction is diluted to
below the its Lower Explosion Limit.
[0021] For example, natural gas will be diluted to below 5% by volume of natural gas in
air. Thus it cannot explode.
[0022] According to a favourable embodiment, dilution is done with an inert gas.
[0023] The inert gas is for example carbon dioxide. According to an interesting embodiment,
the inert gas is flue gas obtained by combustion, e.g. by combusting a hydrocarbon
such as methane, propane, butane, or a liquid fuel such as diesel or gasoline. Thus
it is possible to reduce the oxygen content of air before dilution. This saves significantly
in the amount of gas used for dilution. Advantageously, the inert gas is nitrogen
or steam, both of which are often available at plants.
[0024] According to a favourable embodiment, the suction is applied using a venturi-based
vacuum pump.
[0025] Thus the gas extracted from the intermediate system does not pass any mechanical
moving parts that might cause ignition if the gas is flammable. The venturi-based
pump is an ejector or a jet pump. In case the gas extracted is flammable, the venturi-based
pump is preferably fed with an inert gas such as nitrogen or steam instead of air,
reducing the risk of an explosive atmosphere in the means used for discharging the
gas.
[0026] According to a favourable embodiment, the intermediate subsystems comprise a ball
valve, said ball valve comprising the first sealing valve seat, the second valve seat
and the vent opening.
[0027] Venting ball valves is an important area of application of the method according to
the invention.
[0028] According to a favourable embodiment, the second valve seat is a second sealing valve
seat.
[0029] In such a case, it is easier to achieve a sub-atmospheric pressure. Also, the second
sealing valve seat acts as a safety measure should there be a failure in the system
that provides for the sub-atmospheric pressure. A ball valve comprising both first
and second sealing valve seats is commercially available as a ball valve with double-piston
effect, a.k.a. as a double isolation and bleed valve.
[0030] According to a favourable embodiment, the fourth valve seat is a fourth sealing valve
seat.
[0031] In such a case, it is easier to achieve a sub-atmospheric pressure.
[0032] According to a favourable embodiment, the sub-atmospheric pressure is maintained
while the at least one maintenance step of the maintenance procedure is performed.
[0033] Thus the method is a method for performing maintenance. Preferably, the sub-atmospheric
pressure is maintained during the full maintenance procedure, thus reducing the risk
of gas leakage via an intermediate system to the depressurized third subsystem during
the full maintenance procedure.
[0034] According to a favourable embodiment, the pressure in the intermediate subsystem
is monitored using a pressure gauge, and a vacuum pump used for applying suction is
controlled by the pressure gauge.
[0035] This allows for a saving in energy and/or, if an inert gas such as nitrogen is used
(e.g. as used as a motive gas), in a saving of inert gas. This control of the suction
is for example achieved by controlling the flow of the motive gas for a venturi-based
vacuum pump.
[0036] According to a favourable embodiment, the bleed line comprises between the pressure
gauge and the vacuum pump a non-return valve.
[0037] When a sufficiently low pressure in the intermediate subsystem is achieved, measured
by the pressure gauge, the vacuum pump can be stopped upon which this non-return valve
closes. In case the pressure in the intermediate subsystem then raises due to leakage
of pressured gas and/or air into the intermediate subsystem, and exceeds a certain
preset level, the vacuum pump can be started again, until the pressure is sufficiently
low to stop the pump again, etcetera. If there is very little leakage of pressured
gas and/or air into the intermediate system, limited uptime of the pump needs to be
applied and a significant saving in energy and/or inert gas is achieved.
[0038] According to a favourable embodiment, the third subsystem comprises a compressor.
[0039] Thus more specifically the method according to the present invention relates to a
method of preparing a system comprising a compressor, which is an important area of
application of the method.
[0040] The present invention will now be illustrated with reference to the drawing where
Fig. 1 shows a schematic layout of a super-atmospheric pressure system;
Fig. 2 shows a cross-sectional view through an intermediate subsystem of the system
of Fig. 1; and
Fig. 3 shows a schematic layout of an alternative super-atmospheric pressure system
similar to Fig. 1.
[0041] Fig. 1 shows a schematic layout of a system 100 comprising a first subsystem 110
and a second subsystem 120. The system 100 comprises a first branch 101 connecting
the first subsystem 110 to the second subsystem 120; and comprises a second branch
102, also connecting the first subsystem 110 with the second subsystem 120.
[0042] In the embodiment discussed here, natural gas in the first subsystem 110 with a pressure
of 90 Bar is raised in pressure to 200 Bar using compressors 121, 121'. If compressor
121 of the first branch 101 needs maintenance, it needs to be isolated from any subsystem
that remains pressurized and be brought to atmospheric pressure. To this end there
is an intermediate subsystem 170a between the first subsystem 110 and a third subsystem
130 comprising the compressor 121; and a further intermediate subsystem 170b between
the third subsystem 130 and the second subsystem 120. The intermediate subsystem of
the first branch comprises an upstream ball valve 123, and the further intermediate
subsystem 170b comprises a downstream ball valve 122. To perform maintenance on the
compressor 121, both of these ball valves are closed. Conveniently, said ball valves
are double piston effect ball valves.
[0043] The internal volume of the ball valves contain gas under high pressure. This gas
is, as is known in the art, discharged via a bleed opening into the (outside) atmosphere.
[0044] If, for example, the upstream ball valve 123 is leaky, gas may stil leak from the
first subsystem 110 towards the compressor 121, causing a dangerous situation to exist.
[0045] According to the present invention, a sub-atmospheric pressure is applied to the
ball valves by connecting a bleed line 150 and a vacuum pump 160 to the bleed opening.
This will be discussed in more detail with reference to Fig. 2.
[0046] To apply the sub-atmospheric pressure, the bleed line 150 is provided with an ejector
vacuum pump 160, driven by an air pump 161. This air pump 161 preferably provides
so much motive air that the gas in the bleed line 150 is diluted to below the Lower
Explosion Limit, eliminating the danger of an explosion, and discharged via a section
of the bleed line 150 downstream of the ejector vacuum pump 160 to a safe location.
[0047] By keeping the valves 122', 123' of the second branch 102 open, the second branch
102 can remain operational, whereas maintenance can be performed on the first branch
101.
[0048] Fig. 2 shows a cross-sectional view through an intermediate subsystem 170 of the
system of Fig. 1, embodied in a ball valve comprising a housing 205. The ball valve
is a standard double-piston-effect ball-valve comprising a first sealing valve seat
231 and a second sealing valve seat 241. The valve seats can slide in a corresponding
seat pocket. In general, there will be O-rings (not shown) for sealing the valve seats
against the seat pocket. The first sealing valve seat 231 comprises a through-hole
232 and the second sealing valve seat 241 comprises a through-hole 242.
[0049] The ball valve further comprises a ball 233 having a through-hole 234. Springs 291
are present to push the valve seats against the ball 233. The ball 233 can be rotated
using spindle 292 so as to open and close the ball valve. In Fig. 2 it is closed.
If the ball 233 is rotated over 90°, the through-holes 232, 234 and 242 are aligned
and the ball 233 allows gas to be transported through the ball valve.
[0050] To discharge gas present in the cavity 245 of the ball valve, a vent opening 246
is provided, which is connected to bleed line 150.
[0051] A ball valve as disclosed above is known in the art.
[0052] According to the present invention, suction is applied. Thus, not only is gas actively
discharged from the cavity 245, but more importantly leakage of gas via the first
sealing valve seat 231 through the second valve seat 241 is reduced and - if sub-atmospheric
pressure is achieved in the cavity of the ball valve - prevented. Thus, escape of
gas from the first subsystem 110 downstream of the second valve seat 241 can be prevented,
helping to create a safe working environment for performing a maintenance operation.
[0053] In the embodiment shown, there is a pressure gauge 270 for determining whether sub-atmospheric
pressure has been achieved, indicating that no gas will escape from the ball valve.
The pressure gauge 270 can be used to control the air pump 161, which can save energy
and/or save inert gas such as nitrogen if that is used as motive gas. In the embodiment
shown in Fig. 2, the bleed line 150 comprises between the pressure gauge 270 and the
vacuum pump 160 a non-return valve 287. When a sufficiently low pressure in the intermediate
subsystem is achieved, meassured by the pressure gauge, the vacuum pump can be stopped
upon which this non-return valve closes. In case the pressure in the intermediate
subsystem then raises due to leakage of pressured gas and/or air into the intermediate
subsystem, and exceeds a certain preset level, the vacuum pump can be started again,
until the pressure is sufficiently low to stop the pump again, etcetera. If there
is very little leakage of pressured gas and/or air into the intermediate system, limited
uptime of the pump needs to be applied and a significant saving in energy and/or inert
gas is achieved.
[0054] The bleed line 150 contains a constriction 251. As a result, the flow resistance
in an upstream section 252 of the bleed line 150 where the pressure gauge 270 is located
is lower than the flow resistance in a downstream section 253 between the pressure
gauge 270 and the ejector vacuum pump 160. Thus the reliability of the pressure gauge
270 being capable of indicating that a sub-atmospheric pressure is present in the
cavity 245 is improved when the pump is in operation and the non-return valve 287
is open.
[0055] A drain opening 293 may be present between the first sealing valve seat 231 and the
second valve seat 241. During normal operation this drain opening 293 is closed using
a plug. While not preferred because gas might escape via it, an open drain opening
293 is allowable if strong suction is applied by the vacuum pump (here ejector vacuum
pump 160), in particular if the flow resistance via said drain opening 293 is larger
than the flow resistance in the bleed line 150 from the cavity to the ejector vacuum
pump 160. Thus, ambient air is sucked in, preventing gas from escaping from the cavity
245 through the drain opening 293.
[0056] The drain opening 293 may be advantageously provided with the pressure gauge 270,
to ensure the reading on the pressure gauge corresponds with the pressure in the cavity
and is not affected by any dynamic pressure losses in the bleed line 150.
[0057] Fig. 3 corresponds substantially to Fig. 1, with the difference that instead of (double
piston effect) ball valves use is made of two pairs of single sealing seat valves
330. Each pair has a bleed line 336 provided between the two single sealing seat valves
330 of that pair.
[0058] By closing said single sealing seat valves 330, and opening valves 335 of the bleed
lines 336, suction can be applied and gas present between the single sealing seat
valves 330 of each pair discharged.
[0059] By keeping, for the second branch 102 which connects the pressurized first subsystem
110 with the pressurized subsystem 120, the valves 330 open and the valves 335 closed,
the second branch 102 can remain operational, whereas maintenance can be performed
on the first branch 101 safely.
[0060] The method according to the present invention can be varied in many ways within the
scope of the appending claims. For example, if one of the pressurized subsystems 110,
120 is depressurized during maintenance, only one intermediate subsystem 170 is necessary.
The bleed lines 150 may be present permanently in a system, or are connected to an
intermediate system using a mobile vacuum system before maintenance and removed after
maintenance. Each individual intermediate subsystem may have an individual suction
system, independent of other intermediate subsystems, or they can be combined in any
favourable combination, depending on the situation at hand.
1. A method of preparing a system (100) for a maintenance operation, said system (100)
comprising
- a first subsystem (110) containing a super-atmospheric gas,
- a second subsystem (120), and
- a third subsystem (130) between the first subsystem (110) and the second subsystem
(120);
said first subsystem (110) and said second subsystem (120) being connected via an
intermediate subsystem (170a) capable of allowing gas to flow between the first subsystem
(110) and the second subsystem (120) via the third subsystem (130), said intermediate
subsystem (170a) comprising
- a first sealing valve seat (231),
- a second valve seat (241) between the first sealing valve seat (231) and the second
subsystem (120), and
- a vent opening (246) between the first sealing valve seat (231) and the second valve
seat (241);
said third subsystem (130) and said second subsystem (120) being connected via a further
intermediate subsystem (170b) capable of allowing gas to flow between the third subsystem
(130) and the second subsystem, said further intermediate subsystem (170b) comprising
- a third sealing valve seat (231),
- a fourth valve seat between the third sealing valve seat (231) and the third subsystem
(130), and
- a second vent opening (246) between the third sealing valve seat (231) and the fourth
valve seat (241);
said method comprising
- the discharge of gas present between the first sealing valve seat (231) and the
second valve seat (241) via the vent opening (246) before performing a maintenance
step of the maintenance operation downstream of said second valve seat (241) with
respect to the first sealing valve seat (231), and
- the discharge of gas present between the third sealing valve seat (231) and the
fourth valve seat (241) via the second vent opening (246) before performing a maintenance
step of the maintenance operation between the second valve seat (241) and the fourth
valve seat (241);
characterized in that the method comprises before performing a maintenance step of the maintenance operation
- applying suction to the vent opening (246) for discharging the gas present between
the first sealing valve seat (231) and the second valve seat (241) before performing
said maintenance step
- the discharge of gas present between the third sealing valve seat (231) and the
fourth valve seat (241) via the second vent opening (246) between the second valve
seat (241) and the fourth valve seat (241) by applying suction to the second vent
opening (246);
wherein the suction is applied to achieve sub-atmospheric pressure in at least one
intermediate system (170a, 170b) of the system (100).
2. The method according to claim 1, wherein the intermediate subsystem (170a), the third
subsystem (130) and the further intermediate subsystem (170b) define a branche (101)
connecting the first subsystem (110) with the second subsystem (120), the system (100)
further comprising a second branch (102) connecting the first subsystem (110) and
the second subsystem (120).
3. The method according to claim 1 or 2, wherein the system (100) comprises a pressure
gauge (270) for measuring the pressure of an intermediate subsystem (170a, 170b) of
the system (100).
4. The method according to claim 3, wherein the system (100) comprises a pressure gauge
(270) for measuring the pressure upstream of a vacuum pump (160) providing said suction,
the flow resistance Rvv-pg between i) the location of the gas between the first sealing valve seat (231) and
the second valve seat (241) and ii) the location of the pressure gauge (270) being
lower than the flow resistance Rpg-vp between i) the location of the pressure gauge (270) and ii) the vacuum pump (160).
5. The method according to any of the preceding claims, wherein the gas extracted by
suction is diluted to below the its Lower Explosion Limit.
6. The method according to any of the preceding claims, wherein dilution is done with
an inert gas.
7. The method according to any of the preceding claims, wherein the suction is applied
using a venturi-based vacuum pump (160).
8. The method according to any of the preceding claims, wherein the intermediate subsystems
(170a, 170b) comprise a ball valve (123), said ball valve (123) comprising the first
sealing valve seat (231), the second valve seat (241) and the vent opening (246).
9. The method according to any of the preceding claims, wherein the second valve seat
(241) is a second sealing valve seat (241).
10. The method according to any of the preceding claims, wherein the fourth valve seat
(241) is a fourth sealing valve seat (241).
11. The method according to any of the preceding claims, wherein the sub-atmospheric pressure
is maintained while the at least one maintenance step of the maintenance procedure
is performed.
12. The method according to any of the preceding claims, wherein the pressure in the intermediate
subsystem (170a) is monitored using a pressure gauge (270), and a vacuum pump (160)
used for applying suction is controlled by the pressure gauge (270).
13. The method according to claim 12, wherein the bleed line (150) comprises between the
pressure gauge (270) and the vacuum pump (160) a non-return valve (287).
14. The method according to any of the preceding claims, wherein the third subsystem (130)
comprises a compressor (121).