(19) |
 |
|
(11) |
EP 3 500 484 B1 |
(12) |
EUROPEAN PATENT SPECIFICATION |
(45) |
Mention of the grant of the patent: |
|
20.05.2020 Bulletin 2020/21 |
(22) |
Date of filing: 22.08.2017 |
|
(51) |
International Patent Classification (IPC):
|
(86) |
International application number: |
|
PCT/IB2017/055062 |
(87) |
International publication number: |
|
WO 2018/037341 (01.03.2018 Gazette 2018/09) |
|
(54) |
SYSTEM AND METHOD FOR MOVING BETWEEN A LAYING VESSEL AND AN AUXILARY PLATFORM REELS
CONFIGURED FOR LAYING ELONGATED MEMBERS ON A BED OF A BODY OF WATER
SYSTEM UND VERFAHREN ZUM BEWEGEN VON TROMMELN FÜR DAS VERLEGEN VON LÄNGLICHEN ELEMENTEN
AUF DEM BODEN EINES GEWÄSSERS ZWISCHEN EINEM VERLEGESCHIFF UND EINER HILFSPLATTFORM
SYSTÈME ET PROCÉDÉ PERMETTANT LE TRANSFERT, ENTRE UN NAVIRE DE POSE ET UNE PLATE-FORME
AUXILIAIRE, DE DÉVIDOIRS CONÇUS POUR POSER DES ÉLÉMENTS ALLONGÉS SUR UN LIT D'UNE
MASSE D'EAU
|
(84) |
Designated Contracting States: |
|
AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL
NO PL PT RO RS SE SI SK SM TR |
(30) |
Priority: |
22.08.2016 IT 201600086514
|
(43) |
Date of publication of application: |
|
26.06.2019 Bulletin 2019/26 |
(73) |
Proprietor: Saipem S.p.A. |
|
20097 San Donato Milanese (Milano) (IT) |
|
(72) |
Inventors: |
|
- FUSÉ, Carlo
20097 San Donato Milanese (IT)
- MOCERI, Liborio
20097 San Donato Milanese (IT)
- AMIOT, Pierre
20097 San Donato Milanese (IT)
- HUOT, Emmanuel
20097 San Donato Milanese (IT)
|
(74) |
Representative: Eccetto, Mauro et al |
|
Studio Torta S.p.A.
Via Viotti, 9 10121 Torino 10121 Torino (IT) |
(56) |
References cited: :
WO-A2-2014/083547
|
DE-A1- 2 163 654
|
|
|
|
|
|
|
|
|
Note: Within nine months from the publication of the mention of the grant of the European
patent, any person may give notice to the European Patent Office of opposition to
the European patent
granted. Notice of opposition shall be filed in a written reasoned statement. It shall
not be deemed to
have been filed until the opposition fee has been paid. (Art. 99(1) European Patent
Convention).
|
TECHNICAL FIELD
[0001] The present invention relates to a system for moving, between a laying vessel and
an auxiliary platform, reels configured for laying elongated members on a bed of a
body of water.
BACKGROUND ART
[0002] In general, the present invention pertains to the field of laying elongated members
on a bed of a body of water by means of a laying vessel configured to unwind the elongated
member from a reel and lay the elongated member on the bed of the body of water. The
elongated members, in this case underwater pipes or underwater cables, consist of
strings, each of which is wound on a reel and is progressively unwound from the reel
by an unwinding station on board the laying vessel and laid on the bed of the body
of water as the laying vessel moves forward. One of the major critical issues related
to this laying technique is supplying the strings to the laying vessel once the reel
has been unwound.
[0003] In accordance with a known technique, the reel is mounted in a fixed manner on the
laying vessel and, once the string has been completely unwound from the reel, the
laying vessel reaches the quay for the winding of a new string, which is prefabricated
on the quay and simultaneously wound on the reel on board the laying vessel. This
operating mode requires long stops of the laying vessel and is not very convenient
because the laying vessel remains substantially inactive throughout the period of
prefabrication of the string.
[0004] In order to reduce the period of inactivity of the laying vessel,
US patent No. 7,544,013 teaches to prefabricate strings on board an auxiliary floating platform, wind the
string on a reel mounted on the auxiliary structure, and transfer the string on a
reel mounted on the laying vessel. The transfer of the string comprises unwinding
the string from the reel of the auxiliary floating platform and simultaneously winding
the string on the reel mounted on the laying vessel. This reduces the waiting times
due to prefabrication, but not the transfer times for transferring the string between
the two reels.
[0005] An alternative transfer mode comprises using reels releasable from the laying vessel,
winding the reels on an auxiliary platform, and transferring the reels between the
auxiliary platform and the laying vessel.
[0006] In line with this operating mode, the document
WO 2011/105,894 teaches to prefabricate a plurality of reels on an auxiliary platform, load the plurality
of reels on the laying vessel, and arrange the reels in succession in the unwinding
station. The loading of the wound reels and the unloading of the unwound reels are
performed by means of lifting cranes, with consequent difficulties in positioning
the reels in a precise manner. It should be remembered that the reels employed in
this sector of the art generally have a weight in the order of thousands of tons and
that the handling thereof is particularly complex and not without danger, especially
when the reels are suspended from the lifting crane. In fact, a load suspended from
a cable is susceptible of oscillating to the detriment of the load positioning precision,
thus endangering people or structures close to the load. The handling of the reels
is more difficult when the lifting crane is located on board a floating unit. In fact,
the floating units equipped with lifting cranes are of large tonnage in order to ensure
greater stability to the lifting crane.
[0007] Documents
EP 302,038,
WO 2009/077711,
WO 2013/133716,
US 7,927,040,
US 4,117,692,
WO2014/083547 and
GB 243,929 show other technical solutions adopted in this field, which however do not fully
meet the requirements of reducing both the downtime in the laying operations and the
risks to personnel on board.
[0008] In order to overcome the above-mentioned technical problems, the Applicant provides
a system for transferring the reels between an auxiliary platform and a laying vessel,
which does not require that the reels are lifted by cranes, as described in patent
application
WO 2014/083547. This technical solution offers undoubted benefits in terms of rapid and secure transfer.
[0009] However, all the systems described in the patent literature related to the transfer
of reels of the type identified above do not address the problem of the strong concentrated
stresses transmitted to some structural elements by reels weighing a few thousands
of tons during transfer of the same.
DISCLOSURE OF INVENTION
[0010] One object of the present invention is to provide a system for moving, between a
laying vessel and an auxiliary platform, reels configured for laying elongated members
on a bed of a body of water, which is free from the drawbacks of the prior art.
[0011] In accordance with the present invention, a system for moving, between a laying vessel
and an auxiliary platform, reels configured for laying elongated members on a bed
of a body of water is provided, the system comprising a laying vessel for laying elongated
members on the bed of a body of water and having a weather deck; an auxiliary platform;
at least one reel configured for housing a bobbin of elongated members; a connecting
structure hinged to the weather deck of the laying vessel about a first hinge and
to the auxiliary platform about a second hinge for allowing compensation for the variations
of the relative positions between the laying vessel and the auxiliary platform; and
a plurality of first hydraulic cylinders arranged between the connecting structure
and the weather deck, and a plurality of second hydraulic cylinders arranged between
the connecting structure and the auxiliary platform.
[0012] In this way, on the one hand, the connecting structure can vary its position with
respect to the laying vessel and the auxiliary platform and allows relative movements
between the laying vessel and the auxiliary platform and, on the other hand, the first
and second hydraulic cylinders support part of the weight of the connecting structure
and the reel, thus unloading, at least in part, the weight that bears on the first
and the second hinge.
[0013] In particular, the connecting structure comprises a first portion mounted on the
laying vessel and a second portion mounted on the auxiliary platform, wherein the
first and the second portion can be joined one another for forming a sliding race
extending between the auxiliary platform and the laying vessel.
[0014] In other words, the connecting structure is formed as required when the laying vessel
is moored to the auxiliary platform. When the laying vessel is not moored to the auxiliary
platform, the first portion serves the purpose of stably supporting the reel in an
unwinding station, while the second portion can be supplied with a new reel with a
view to perform a transfer.
[0015] In particular, the connecting structure comprises a third portion, which is supported
by the first or the second portion in a movable manner and is configured for being
removably fixed to the second or the first portion.
[0016] The third portion has the function of compensating for the distance between the side
of the laying vessel and the side of the auxiliary platform so that the first portion
and the second portion can be contained within the sides of the laying vessel and
the auxiliary platform, respectively.
[0017] In particular, the first portion extends on opposite sides of the first hinge, in
particular, the first portion extends symmetrically with respect to the first hinge,
the first hydraulic cylinders being arranged on opposite sides of the first hinge.
[0018] The second portion also extends on opposite sides of the second hinge, in particular,
the second portion extends symmetrically with respect to the second hinge, the second
hydraulic cylinders being arranged on opposite sides of the second hinge.
[0019] This configuration of the first and second hydraulic cylinders with respect to the
corresponding first and second hinges allows optimization of the unloading of the
forces, in any position assumed by the reel, on the connecting structure, and for
any position assumed by the reel, on the first portion and the second portion when
released from one another.
[0020] In particular, the first hydraulic cylinders are hydraulically and mutually connectable
so as to perform a force control to ensure the movement of the connecting structure.
[0021] In particular, the system comprises a first control unit for selectively controlling
the first hydraulic cylinders in force and varying the force of each first hydraulic
cylinder, in particular according to the position of the reel.
[0022] Similarly, the second hydraulic cylinders are also hydraulically and mutually connectable
so as to perform a force control, and the system comprises a second control unit for
selectively controlling the second hydraulic cylinders in force and selectively varying
the force exerted by each second hydraulic cylinder, in particular according to the
position of the reel.
[0023] In particular, the system comprises at least one aligning device for positioning
a given point of the side of the laying vessel at a reference point along one side
of the auxiliary platform.
[0024] This allows the first portion to be positioned at the second portion so as to connect
the first portion to the second portion.
[0025] In particular, the first portion comprises two first guides hinged around the first
hinge, and the second portion comprises two second guides hinged to the second hinge.
The first guides are configured for rocking about the first hinge independently of
one another and, similarly, the second guides are configured for rocking about the
second hinge independently of one another.
[0026] This configuration allows for obtaining a relatively light connecting structure and
prevents the pitching of the laying vessel from generating excessive stresses between
the laying vessel, the connecting structure and the auxiliary platform.
[0027] In particular, all the advantages of the present invention are most apparent when
the auxiliary platform is a floating unit, in particular a barge that is subjected
to rolling and pitching phenomena independent of the rolling and pitching of the laying
vessel.
[0028] A further object of the present invention is to provide a method for moving, between
a laying vessel and an auxiliary platform, reels configured for laying elongated members
on a bed of a body of water, which is free from the drawbacks of the prior art.
[0029] In accordance with the present invention, a method for moving, between a laying vessel
and an auxiliary platform, reels for laying elongated members on a bed of a body of
water is provided, the method comprising the steps of connecting the weather deck
of a laying vessel for laying elongated members on the bed of a body of water to an
auxiliary platform by means of a connecting structure hinged to the weather deck of
the laying vessel about a first hinge and to the auxiliary platform about a second
hinge; and advancing by sliding along the connecting structure at least one reel configured
for housing a bobbin of elongated members; and dynamically supporting the connecting
structure by means of a plurality of first hydraulic cylinders arranged between the
connecting structure and the weather deck and a plurality of second hydraulic cylinders
arranged between the connecting structure and the auxiliary platform.
BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Further features and advantages of the present invention will be apparent from the
following description of a non-limiting embodiment thereof, with reference to the
figures of the accompanying drawings, wherein:
- Figure 1 is a plan view, with parts removed for clarity, of a system for moving, between
a laying vessel and an auxiliary platform, reels configured for laying elongated members
on a bed of a body of water, provided in accordance with the present invention;
- Figure 2 is a plan view, with parts removed for clarity, of the system of Figure 1
in a different operational configuration;
- Figures from 3 to 4 are elevation views, with parts removed for clarity, of the system
of Figure 1 in a plurality of operational configurations; and
- Figures from 5 to 7 are elevation views, with parts removed for clarity and in enlarged
scale, of the system of Figure 1 in further operational configurations.
BEST MODE FOR CARRYING OUT THE INVENTION
[0031] With reference to Figure 1, a system for moving reels 1, designed for laying elongated
members on a bed of a body of water, between a laying vessel 2 and an auxiliary platform
3 is depicted as a whole. In particular, the system according to the invention has
the purpose of transferring reels 1 wound with strings (not shown in the attached
figures) adapted to form underwater pipes (not shown in the attached figures) from
the auxiliary platform 3 to the laying vessel 2, and the unwound reels 1 from the
laying vessel 2 to the auxiliary platform 3. Reference number 1 indicates the wound
reels, the unwound reels, and optionally also those in the intermediate configurations.
[0032] The laying vessel 2 comprises a weather deck 4 meant to support a bobbin 1 in an
unwinding station 5 in which the elongated member (not shown in the attached figures)
is unwound from the bobbin 1 and laid on the bed (not shown) of a body of water 6.
The laying vessel 2 comprises mooring devices, which in this case are mooring lines
7 (Figure 2) and fenders 8.
[0033] The auxiliary platform 3 is a floating platform, preferably a barge comprising mooring
devices, which are configured to cooperate with the mooring devices of the laying
vessel, and, in this case, comprise bollards 9 adapted to cooperate with the mooring
lines 7, and alignment devices 10, which, in this case, cooperate with the fenders
8 in order to align a given point of the side of the laying vessel 2 with a reference
point of the auxiliary platform 3, as depicted in Figure 2.
[0034] In accordance with a variant not illustrated, the auxiliary platform is defined by
a quay.
[0035] With reference to Figure 2, the laying vessel 2 and the auxiliary platform 3 are
moored side by side along their respective sides. The mooring lines 7 are fastened
to the bollards 9, while the fenders 8 keep the sides of the laying vessel 2 and of
the auxiliary platform 3 at a minimum distance, and the alignment devices 10 establish
a predefined relative position along the respective sides of the laying vessel 2 and
the auxiliary platform 3. In practice, the mooring between the laying vessel 2 and
the auxiliary platform 3 allows, to a certain extent, independent rolling and pitching
of both of the naval vessels and, at the same time, a variable draught of the two
naval vessels.
[0036] With reference to Figures 1 and 2, the reel 1 comprises a support frame 11 substantially
in the form of a perch; and a reel frame 12 mounted in a selectively rotatable manner
about an axis A with respect to the support structure 11.
[0037] With reference to Figure 2, the system comprises a connecting structure 13 that,
in use, extends between the laying vessel 2 and the auxiliary platform 3.
[0038] In this case, the connecting structure 13 forms a bridge between the laying vessel
2 and the auxiliary platform 3 and defines a sliding race for the reels 1 between
the laying vessel 2 and the auxiliary platform 3. The connecting structure 13 is hinged
to the weather deck 4 of the laying vessel 2 by means of a hinge C1 about a first
hinge axis A1 and to the auxiliary platform 3 by means of a hinge C2 about a second
hinge axis A2 parallel to the first hinge axis A1, so as to allow compensation for
the variations of the relative positions between the laying vessel 2 and the auxiliary
platform 3.
[0039] With reference to Figure 1, the connecting structure 13 comprises a portion 14 mounted
on the laying vessel 2 and a portion 15 mounted on the auxiliary platform 3. The portions
14 and 15 are connectable to one another to form the sliding race for the reel 1.
The portions 14 and 15 are respectively housed within the dimensions of the weather
deck 4 and of the auxiliary platform 3.
[0040] In particular, the portion 14 comprises two guides 17, which are arranged at a predetermined
distance from one another and are hinged independently about the hinge axis A1. Similarly,
the portion 15 comprises two guides 18, which are arranged at a predetermined distance
from one another and are hinged independently about the hinge axis A2. The portion
16 comprises two guides 19, which are respectively supported by the guides 17 and
slidably mounted on the guides 17, as shown in Figure 3. Each guide 19 is configured
to be secured to a respective guide 18.
[0041] With reference to Figure 3, the laying vessel 2 and the auxiliary platform 3 are
moored side by side in a configuration in which the portions 14 and 15 of the connecting
structure 13 are aligned with each other. The alignment of the portions 14 and 15
is obtained thanks to the alignment devices 10 in cooperation with the fenders 8 for
arranging the sides of the laying vessel 2 and of the auxiliary platform 3 in a given
position, and to the positioning of the portions 14 and 15 about the respective hinge
axes A1 and A2.
[0042] The alignment of the portions 14 and 15 is required to removably fix the portion
16 to the portion 15. In the illustrated case, the portion 16 is mounted in a sliding
manner with respect to the portion 14. The alignment of the portions 14 and 15 allows
the free end of the portion 16 to be arranged at the free end of the portion 15, and
then the portions 16 and 15 to be fixed, so as to create a continuous and straight
sliding race between the laying vessel 2 and the auxiliary platform 3.
[0043] In the illustrated case, the bobbin 1 is arranged on the portion 15 of the auxiliary
platform 3 and must be transferred to the laying vessel 2.
[0044] The system comprises a plurality of hydraulic cylinders 20 arranged between the connecting
structure 13 and the weather deck 4; and a plurality of second hydraulic cylinders
21 arranged between the connecting structure 13 and the auxiliary platform 3 for supporting,
at least in part, the load of the reel 1.
[0045] Each hydraulic cylinder 20 is hinged to the weather deck 4 and the portion 14, while
each hydraulic cylinder 21 is hinged to the auxiliary platform 3 and the portion 15.
In more detail, each guide 17 is supported by a plurality of hydraulic cylinders 20,
and similarly each guide 18 is supported by a plurality of hydraulic cylinders 21.
Furthermore, the portion 14 extends on opposite sides of the hinge axis A1. In particular,
the portion 14 extends symmetrically with respect to the hinge axis A1, and the hydraulic
cylinders 20 are arranged on opposite sides of the hinge axis A1. Similarly, the portion
15 extends on opposite sides of the hinge axis A2. In particular, the portion 15 extends
symmetrically with respect to the hinge axis A2, and the hydraulic cylinders 21 are
arranged on opposite sides of the hinge axis A2.
[0046] The hydraulic cylinders 20 are hydraulically connected to each other so as to perform
a force control. In practice, each hydraulic cylinder 20 exerts a force equal to that
of the other hydraulic cylinders 20. However, the force exerted by each hydraulic
cylinder can be selectively varied. For this purpose, the system comprises a control
unit 22 for selectively controlling the hydraulic cylinders 20, in particular according
to the position of the reel 1.
[0047] Similarly, the hydraulic cylinders 21 are hydraulically connected to each other so
as to perform a force control, and are controlled by a control unit 23, in particular
according to the position of the reel 1.
[0048] In one embodiment of the present invention that is not shown, a single control unit
mounted on the laying vessel or on the auxiliary platform is configured to control
the hydraulic cylinders 20 and 21.
[0049] With reference to Figure 4, the bobbin 1 is arranged along the connecting structure
13 at the portion 16. Following the displacement of the bobbin 1 from the initial
portion shown in Figure 3, the draught of the auxiliary platform 3 is varied, while
that of the laying vessel 2 remains unchanged. Effectively, the overall mass of the
wound reel 1 is approximately 3,500 tons and affects the draught of the auxiliary
platform 3 that, in this case, does not have a very high tonnage. On the contrary,
the laying vessel 2 has a very high tonnage, and although the reel 1 is very heavy,
the weight of the reel 1 only marginally affects its draught.
[0050] The movements of the reel 1 and the consequent variation in the relative positions
between the laying vessel 2 and the auxiliary platform 3 result in a change in the
position of the connecting structure 13 with respect to the laying vessel 2 and the
auxiliary platform 3. In practice, the connecting structure 13 oscillates around the
hinge axes A1 and A2, while the hydraulic cylinders 20 and 21 and the hinges C1 and
C2 support the weight of the connecting structure 13 and the reel 1. In this way,
it is possible to unload the weight of the reel 1 and the weight of the connecting
structure 13 so that they are distributed along the laying vessel 2 and the auxiliary
platform 3.
[0051] With reference to Figure 5, the reel 1 is arranged in the unwinding station 5 along
the portion 14. In this configuration, the draught of the auxiliary structure 3 is
further reduced with respect to Figure 4, and the connecting structure 13 is inclined
downwards from right to left.
[0052] Subsequently, the portion 15 is disconnected from the portion 14, the portion 16
is retracted in the rest configuration, and the laying vessel 2 is released from the
auxiliary platform 3, as shown in Figure 6. With reference to Figure 6, the control
unit 22 increases the force exerted by the hydraulic cylinders 20 so as to arrange
the portion 14 of the connecting structure 13 in a maximum lift configuration and
in a position in which the portion 14, or rather the guides 17, are parallel to the
weather deck 4.
[0053] Subsequently, the portion 14 is locked in a given configuration as better illustrated
in Figure 7. With reference to Figure 7, supports 24, in this case beams, are inserted
between the weather deck 4 and the portion 14. The control unit 22 unloads the force
from the hydraulic cylinders 20 so that the portion 14, i.e. the beams 17, progressively
rest on the supports 24, and the weight of the portion 14 and the weight of the reel
1 are directly unloaded on the supports 24 without weighing on the hydraulic cylinders
20 and the hinge C1. In this way, the reel 1 is stably positioned in the unwinding
station 5 and the laying operations can start.
[0054] It is evident that the present invention includes further variants that are not explicitly
described, without however departing from the scope of protection of the following
claims.
1. A system for moving between a laying vessel and an auxiliary platform reels configured
for laying elongated members on a bed of a body of water, the system comprising a
laying vessel (2) for laying elongated members on the bed of a body of water (6) and
comprising a weather deck (4); an auxiliary platform (3); at least one reel (1) configured
for housing a bobbin of elongated members; a connecting structure (13) hinged to the
weather deck (4) of the laying vessel (2) about a first hinge (C1) and to the auxiliary
platform (3) about a second hinge (C2) for allowing compensation for the variations
of the relative positions between the laying vessel (2) and the auxiliary platform
(3); and a plurality of first hydraulic cylinders (20) arranged between the connecting
structure (13) and the weather deck (4) and a plurality of second hydraulic cylinders
(21) arranged between the connecting structure (13) and the auxiliary platform (3).
2. The system as claimed in Claim 1, wherein the connecting structure (13) comprises
a first portion (14) mounted on the laying vessel (2) and a second portion (15) mounted
on the auxiliary platform (3), wherein the first and the second portion (14, 15) can
be joined one another for forming a sliding race extending between the auxiliary platform
(3) and the laying vessel (2).
3. The system as claimed in Claim 2, wherein the connecting structure (13) comprises
a third portion (16), which is supported by the first or the second portion (14, 15)
in a movable manner and is configured for being fixed to the second or first portion
(15, 14).
4. The system as claimed in Claim 2 or 3, wherein the first portion (14) extends on opposite
sides of the first hinge (C1), in particular, the first portion (14) extends symmetrically
with respect to the first hinge (C1), the first hydraulic cylinders (20) being arranged
on opposite sides of the first hinge (C1).
5. The system as claimed in one of the Claims from 2 to 4, wherein the second portion
(15) extends on the opposite sides of the second hinge (C2), in particular, the second
portion (15) extends symmetrically with respect to the second hinge (C2), the second
hydraulic cylinders (21) being arranged on opposite sides of the second hinge (C2).
6. The system as claimed in any one of the foregoing Claims, wherein the first hydraulic
cylinders (20) are hydraulically and mutually connectable for setting a force control.
7. The system as claimed in any one of the foregoing Claims, and comprising a control
unit (22; 23) for selectively controlling the first hydraulic cylinders (20) in force
and for varying the force of each first hydraulic cylinder (20), in particular according
to the position of the reel (1).
8. The system as claimed in any one of the foregoing Claims, wherein the second hydraulic
cylinders (21) are hydraulically and mutually connectable for setting a force control.
9. The system as claimed in any one of the foregoing Claims, and comprising a control
unit (22; 23) for selectively controlling the second hydraulic cylinders (21) in force
and for selectively varying the force exerted by each second hydraulic cylinder (21),
in particular according to the position of the reel (1).
10. The system as claimed in any one of the foregoing Claims, and comprising at least
one aligning device (10) for positioning a given point of one side of the laying vessel
(2) at a reference point along one side of the auxiliary platform (3) .
11. The system as claimed in any one of the Claims from 2 to 10, wherein the first portion
(14) comprises two first guides (17) hinged about the first hinge (C1), and the second
portion (15) comprises two second guides (18) hinged to the second hinge (C2), in
particular the first guides (17) being configured for rocking about the first hinge
(C1) independently of one another and the second guides (18) being configured for
rocking about the second hinge (C2) independently of one another.
12. The system as claimed in any one of the foregoing Claims, wherein the auxiliary platform
(3) is a floating unit, in particular a barge.
13. A method for moving between a laying vessel and an auxiliary platform reels for laying
elongated members on a bed of a body of water, the method comprising the steps of
connecting the weather deck (4) of a laying vessel (2) for laying elongated members
on the bed of a body of water (6) to an auxiliary platform (3) by means of a connecting
structure (13) hinged to the weather deck (4) of the laying vessel (2) about a first
hinge (C1) and to the auxiliary platform (3) about a second hinge (C2); and advancing
by sliding along the connecting structure (13) at least one reel (1) configured for
housing a bobbin of elongated members; and dynamically supporting the connecting structure
(13) by means of a plurality of first hydraulic cylinders (20) arranged between the
connecting structure (13) and the weather deck (4) and a plurality of second hydraulic
cylinders (21) arranged between the connecting structure (13) and the auxiliary platform
(3).
14. The method as claimed in Claim 13, and comprising the step of selectively connecting
and disconnecting a first and a second portion (14, 15) of the connecting structure
(13) respectively mounted on the laying vessel (2) and on the auxiliary platform (3)
so that when the first and the second portion (14, 15) of the connecting structure
(13) are joined one another they define a sliding race extending between the auxiliary
platform (3) and the laying vessel (2).
15. The method as claimed in Claim 14, wherein the step of joining the first and the second
portion (14, 15) of the connecting structure (13) includes arranging a third portion
(16) between the first and the second portion (14, 15); the third portion (16) being
supported in a movable manner by the first or the second portion (14, 15) and being
configured for being fixed to the second or the first portion (15, 14).
16. The method as claimed in Claim 14 or 15, and comprising the steps of mooring the laying
vessel (2) side by side with the auxiliary platform (3) so as to align the first portion
(14) with the second portion (15).
17. The method as claimed in one of the Claims from 13 to 16, and comprising the step
of advancing the reel (1) between the laying vessel (2) and the auxiliary platform
(3) along the connecting structure (13).
18. The method as claimed in one of the Claims from 13 to 17, and comprising the step
of actuating the first and the second hydraulic cylinders (20, 21) with respective
force control during the transfer of the reel (1) between the laying vessel (2) and
the auxiliary platform (3) so as to allow the connecting structure (13) to rock about
the first and the second hinge (C1, C2).
19. The method as claimed in one of the Claims from 14 to 18, and comprising the step
of arranging the reel (1) along the first portion (14) of the connecting structure
(13) in a given position, arranging the first portion (14) of the connecting structure
(13) parallel to the weather deck (4); and locking the first portion (14) of the connecting
structure (13) in the configuration parallel to the weather deck (4) of the laying
vessel (2).
1. System zum Bewegen von Trommeln für das Verlegen von länglichen Elementen auf dem
Boden eines Gewässers zwischen einem Verlegeschiff und einer Hilfsplattform, das System
umfassend ein Verlegeschiff (2) zum Verlegen von länglichen Elementen auf dem Boden
eines Gewässers (6) und umfassend ein Wetterdeck (4); eine Hilfsplattform (3); mindestens
eine Trommel (1), die zum Aufnehmen einer Spule länglicher Elemente ausgestaltet ist;
eine Verbindungsstruktur (13), die an dem Wetterdeck (4) des Verlegeschiffs (2) um
ein erstes Gelenk (C1) und an der Hilfsplattform (3) um ein zweites Gelenk (C2) angelenkt
ist, um einen Ausgleich der Schwankungen der relativen Positionen zwischen dem Verlegeschiff
(2) und der Hilfsplattform (3) zu ermöglichen; und eine Vielzahl von ersten Hydraulikzylindern
(20), die zwischen der Verbindungsstruktur (13) und dem Wetterdeck (4) angeordnet
sind, und eine Vielzahl von zweiten Hydraulikzylindern (21), die zwischen der Verbindungsstruktur
(13) und der Hilfsplattform (3) angeordnet sind.
2. System nach Anspruch 1, wobei die Verbindungsstruktur (13) einen ersten Abschnitt
(14), der an dem Verlegeschiff (2) angebracht ist, und einen zweiten Abschnitt (15),
der an der Hilfsplattform (3) angebracht ist, umfasst, wobei der erste und der zweite
Abschnitt (14, 15) zum Bilden einer Gleitbahn, die sich zwischen der Hilfsplattform
(3) und dem Verlegeschiff (2) erstreckt, aneinandergefügt werden können.
3. System nach Anspruch 2, wobei die Verbindungsstruktur (13) einen dritten Abschnitt
(16) umfasst, der von dem ersten oder dem zweiten Abschnitt (14, 15) beweglich gestützt
wird und für eine Befestigung an dem zweiten oder ersten Abschnitt (15, 14) ausgestaltet
ist.
4. System nach Anspruch 2 oder 3, wobei sich der erste Abschnitt (14) auf gegenüberliegenden
Seiten des ersten Gelenks (C1) erstreckt, wobei sich der erste Abschnitt (14) insbesondere
symmetrisch in Bezug auf das erste Gelenk (C1) erstreckt, wobei die ersten Hydraulikzylinder
(20) auf gegenüberliegenden Seiten des ersten Gelenks (C1) angeordnet sind.
5. System nach einem der Ansprüche 2 bis 4, wobei sich der zweite Abschnitt (15) auf
den gegenüberliegenden Seiten des zweiten Gelenks (C2) erstreckt, wobei sich der zweite
Abschnitt (15) insbesondere symmetrisch in Bezug auf das zweite Gelenk (C2) erstreckt,
wobei die zweiten Hydraulikzylinder (21) auf gegenüberliegenden Seiten des zweiten
Gelenks (C2) angeordnet sind.
6. System nach einem beliebigen der vorhergehenden Ansprüche, wobei die ersten Hydraulikzylinder
(20), zum Einstellen einer Kraftsteuerung, hydraulisch und miteinander verbindbar
sind.
7. System nach einem beliebigen der vorhergehenden Ansprüche, und umfassend eine Steuereinheit
(22; 23) zum selektiven Steuern der ersten Hydraulikzylinder (20) hinsichtlich der
Kraft und zum Variieren der Kraft jedes ersten Hydraulikzylinders (20), insbesondere
entsprechend der Position der Trommel (1).
8. System nach einem beliebigen der vorhergehenden Ansprüche, wobei die zweiten Hydraulikzylinder
(21), zum Einstellen einer Kraftsteuerung, hydraulisch und miteinander verbindbar
sind.
9. System nach einem beliebigen der vorhergehenden Ansprüche, und umfassend eine Steuereinheit
(22; 23) zum selektiven Steuern der zweiten Hydraulikzylinder (21) hinsichtlich der
Kraft und zum selektiven Variieren der Kraft, die von jedem zweiten Hydraulikzylinder
(21) ausgeübt wird, insbesondere entsprechend der Position der Trommel (1).
10. System nach einem beliebigen der vorhergehenden Ansprüche, und umfassend mindestens
eine Ausrichtungsvorrichtung (10) zum Positionieren eines gegebenen Punkts einer Seite
des Verlegeschiffs (2) an einem Bezugspunkt entlang einer Seite der Hilfsplattform
(3).
11. System nach einem beliebigen der Ansprüche 2 bis 10, wobei der erste Abschnitt (14)
zwei erste Führungen (17) umfasst, die um das erste Gelenk (C1) angelenkt sind, und
der zweite Abschnitt (15) zwei zweite Führungen (18) umfasst, die an dem zweiten Gelenk
(C2) angelenkt sind, wobei, insbesondere, die ersten Führungen (17) so ausgestaltet
sind, dass sie unabhängig voneinander um das erste Gelenk (C1) schwenken, und die
zweiten Führungen (18) so ausgestaltet sind, dass sie unabhängig voneinander um das
zweite Gelenk (C2) schwenken.
12. System nach einem beliebigen der vorhergehenden Ansprüche, wobei die Hilfsplattform
(3) eine schwimmende Einheit, insbesondere ein Prahm, ist.
13. Verfahren zum Bewegen von Trommeln für das Verlegen von länglichen Elementen auf dem
Boden eines Gewässers zwischen einem Verlegeschiff und einer Hilfsplattform, das Verfahren
umfassend die Schritte des Verbindens des Wetterdecks (4) eines Verlegeschiffs (2)
zum Verlegen von länglichen Elementen auf dem Boden eines Gewässers (6) mit einer
Hilfsplattform (3) mittels einer Verbindungsstruktur (13), die an dem Wetterdeck (4)
des Verlegeschiffs (2) um ein erstes Gelenk (C1) angelenkt ist und an der Hilfsplattform
(3) um ein zweites Gelenk (C2) angelenkt ist; und des Vorschiebens, durch Gleiten
entlang der Verbindungsstruktur (13), mindestens einer Trommel (1), die zum Aufnehmen
einer Spule länglicher Elemente ausgestaltet ist; und des dynamischen Stützens der
Verbindungsstruktur (13) mittels einer Vielzahl von ersten Hydraulikzylindern (20),
die zwischen der Verbindungsstruktur (13) und dem Wetterdeck (4) angeordnet sind,
und einer Vielzahl von zweiten Hydraulikzylindern (21), die zwischen der Verbindungsstruktur
(13) und der Hilfsplattform (3) angeordnet sind.
14. Verfahren nach Anspruch 13, und umfassend den Schritt des selektiven Verbindens und
Trennens eines ersten und eines zweiten Abschnitts (14, 15) der Verbindungsstruktur
(13), die jeweils an dem Verlegeschiff (2) und an der Hilfsplattform (3) angebracht
sind, sodass, wenn der erste und der zweite Abschnitt (14, 15) der Verbindungsstruktur
(13) aneinandergefügt sind, sie eine Gleitbahn definieren, die sich zwischen der Hilfsplattform
(3) und dem Verlegeschiff (2) erstreckt.
15. Verfahren nach Anspruch 14, wobei der Schritt des Aneinanderfügens des ersten und
des zweiten Abschnitts (14, 15) der Verbindungsstruktur (13) ein Anordnen eines dritten
Abschnitts (16) zwischen dem ersten und dem zweiten Abschnitt (14, 15) umfasst; wobei
der dritte Abschnitt (16) von dem ersten oder dem zweiten Abschnitt (14, 15) beweglich
gestützt wird und für eine Befestigung an dem zweiten oder dem ersten Abschnitt (15,
14) ausgestaltet ist.
16. Verfahren nach Anspruch 14 oder 15, und umfassend die Schritte des Verankerns des
Verlegeschiffs (2) Seite an Seite mit der Hilfsplattform (3), um den ersten Abschnitt
(14) an dem zweiten Abschnitt (15) auszurichten.
17. Verfahren nach einem der Ansprüche 13 bis 16, und umfassend den Schritt des Vorschiebens
der Trommel (1) zwischen dem Verlegeschiff (2) und der Hilfsplattform (3) entlang
der Verbindungsstruktur (13).
18. Verfahren nach einem der Ansprüche 13 bis 17, und umfassend den Schritt des Antreibens
des ersten und des zweiten Hydraulikzylinders (20, 21) mit jeweiliger Kraftsteuerung
während des Transfers der Trommel (1) zwischen dem Verlegeschiff (2) und der Hilfsplattform
(3), um der Verbindungsstruktur (13) ein Schwenken um das erste und das zweite Gelenk
(C1, C2) zu ermöglichen.
19. Verfahren nach einem der Ansprüche 14 bis 18, und umfassend den Schritt des Anordnens
der Trommel (1) entlang des ersten Abschnitts (14) der Verbindungsstruktur (13) in
einer gegebenen Position, des Anordnens des ersten Abschnitts (14) der Verbindungsstruktur
(13) parallel zum Wetterdeck (4); und des Verriegelns des ersten Abschnitts (14) der
Verbindungsstruktur (13) in der Ausgestaltung, die parallel zum Wetterdeck (4) des
Verlegeschiffs (2) ist.
1. Système pour le déplacement, entre un navire de pose et une plateforme auxiliaire,
de dévidoirs configurés pour poser des éléments allongés sur un lit d'une masse d'eau,
le système comprenant un navire de pose (2) pour poser des éléments allongés sur le
lit d'une masse d'eau (6) et comprenant un pont découvert (4) ; une plateforme auxiliaire
(3) ; au moins un dévidoir (1) configuré pour loger une bobine d'éléments allongés
; une structure de raccordement (13) articulée au pont découvert (4) du navire de
pose (2) via une première charnière (C1) et articulée à la plateforme auxiliaire (3)
via une seconde charnière (C2) pour permettre une compensation pour des variations
des positions relatives entre le navire de pose (2) et la plateforme auxiliaire (3)
; et une pluralité de premiers cylindres hydrauliques (20) agencés entre la structure
de raccordement (13) et le pont découvert (4) et une pluralité de seconds cylindres
hydrauliques (21) agencés entre la structure de raccordement (13) et la plateforme
auxiliaire (3).
2. Système selon la revendication 1, dans lequel la structure de raccordement (13) comprend
une première partie (14) montée sur le navire de pose (2) et une seconde partie (15)
montée sur la plateforme auxiliaire (3), dans lequel la première et la deuxième partie
(14, 15) peuvent être assemblées entre elles pour former un chemin de coulissement
s'étendant entre la plateforme auxiliaire (3) et le navire de pose (2).
3. Système selon la revendication 2, dans lequel la structure de raccordement (13) comprend
une troisième partie (16) qui est supportée par la première ou la deuxième partie
(14, 15) d'une manière mobile et est configurée pour être fixée à la deuxième ou première
partie (15, 14).
4. Système selon la revendication 2 ou 3, dans lequel la première partie (14) s'étend
sur les côtés opposés de la première charnière (C1), en particulier, la première partie
(14) s'étend symétriquement par rapport à la première charnière (C1), les premiers
cylindres hydrauliques (20) étant agencés sur les côtés opposés de la première charnière
(C1).
5. Système selon l'une des revendications 2 à 4, dans lequel la deuxième partie (15)
s'étend sur les côtés opposés de la seconde charnière (C2), en particulier, la deuxième
partie (15) s'étend de manière symétrique par rapport à la seconde charnière (C2),
les seconds cylindres hydrauliques (21) étant agencés sur les côtés opposés de la
seconde charnière (C2).
6. Système selon l'une quelconque des revendications précédentes, dans lequel les premiers
cylindres hydrauliques (20) peuvent être raccordés de manière hydraulique et mutuelle
pour régler une commande de force.
7. Système selon l'une quelconque des revendications précédentes, et comprenant une unité
de commande (22 ; 23) pour commander sélectivement les premiers cylindres hydrauliques
(20) en force et pour modifier la force de chaque premier cylindre hydraulique (20),
en particulier selon la position du dévidoir (1).
8. Système selon l'une quelconque des revendications précédentes, dans lequel les seconds
cylindres hydrauliques (21) peuvent être raccordés de manière hydraulique et mutuelle
pour régler une commande de force.
9. Système selon l'une quelconque des revendications précédentes, et comprenant une unité
de commande (22 ; 23) pour commander sélectivement les seconds cylindres hydrauliques
(21) en force et pour modifier sélectivement la force exercée par chaque second cylindre
hydraulique (21), en particulier selon la position du dévidoir (1).
10. Système selon l'une quelconque des revendications précédentes, et comprenant au moins
un dispositif d'alignement (10) pour positionner un point donné d'un côté du navire
de pose (2) à un point de référence le long d'un côté de la plateforme auxiliaire
(3) .
11. Système selon l'une quelconque des revendications 2 à 10, dans lequel la première
partie (14) comprend deux premiers guides (17) articulés à la première charnière (C1),
et la seconde partie (15) comprend deux seconds guides (18) articulés à la seconde
charnière (C2), en particulier les premiers guides (17) étant configurés pour effectuer
un mouvement de balancement autour de la première charnière (C1) indépendamment l'un
de l'autre et les seconds guides (18) étant configurés pour effectuer un mouvement
de balancement autour de la seconde charnière (C2) indépendamment l'un de l'autre.
12. Système selon l'une quelconque des revendications précédentes, dans lequel la plateforme
auxiliaire (3) est une unité flottante, en particulier une barge.
13. Procédé pour le déplacement, entre un navire de pose et une plateforme auxiliaire,
de dévidoirs pour poser des éléments allongés sur un lit d'une masse d'eau, le procédé
comprenant des étapes consistant à raccorder un pont découvert (4) d'un navire de
pose (2) pour poser des éléments allongés sur le lit d'une masse d'eau (6) à une plateforme
auxiliaire (3) au moyen d'une structure de raccordement (13) articulée au pont découvert
(4) via une première charnière (C1) et à la plateforme auxiliaire (3) via une seconde
charnière (C2) ; faire avancer par coulissement le long de la structure de raccordement
(13), au moins un dévidoir (1) configuré pour loger une bobine d'éléments allongés
; et supporter de manière dynamique la structure de raccordement (13) au moyen d'une
pluralité de premiers cylindres hydrauliques (20) agencés entre la structure de raccordement
(13) et le pont découvert (4) et une pluralité de seconds cylindres hydrauliques (21)
agencés entre la structure de raccordement (13) et la plateforme auxiliaire (3).
14. Procédé selon la revendication 13, comprenant raccorder et déconnecter sélectivement
une première et une deuxième partie (14, 15) de la structure de raccordement (13)
montées respectivement sur le navire de pose (2) et sur la plateforme auxiliaire (3)
de sorte que lorsque la première et la deuxième partie (14, 15) de la structure de
raccordement (13) sont assemblées entre elles, elles définissent un chemin de coulissement
s'étendant entre la plateforme auxiliaire (3) et le navire de pose (2).
15. Procédé selon la revendication 14, dans lequel assembler la première et la deuxième
partie (14, 15) de la structure de raccordement (13) comprend agencer une troisième
partie (16) entre la première et la deuxième partie (14, 15) ; la troisième partie
(16) étant supportée d'une manière mobile par la première ou la deuxième partie (14,
15) et étant configurée pour être fixée sur la deuxième ou la première partie (15,
14).
16. Procédé selon la revendication 14 ou 15, et comprenant amarrer le navire de pose (2)
côte à côte avec la plateforme auxiliaire (3) afin d'aligner la première partie (14)
avec la deuxième partie (15).
17. Procédé selon l'une des revendications 13 à 16, comprenant faire avancer le dévidoir
(1) entre le navire de pose (2) et la plateforme auxiliaire (3) le long de la structure
de raccordement (13).
18. Procédé selon l'une des revendications 13 à 17, comprenant actionner le premier et
le second cylindre hydraulique (20, 21) avec la commande de force respective pendant
le déplacement du dévidoir (1) entre le navire de pose (2) et la plateforme auxiliaire
(3) afin de permettre à la structure de raccordement (13) de réaliser un mouvement
de balancement autour de la première et de la seconde charnière (C1, C2).
19. Procédé selon l'une des revendications 14 à 18, comprenant agencer le dévidoir (1)
le long de la première partie (14) de la structure de raccordement (13) dans une position
donnée, agencer la première partie (14) de la structure de raccordement (13) parallèlement
au pont découvert (4) ; et verrouiller la première partie (14) de la structure de
raccordement (13) dans la configuration parallèle au pont découvert (4) du navire
de pose (2).
REFERENCES CITED IN THE DESCRIPTION
This list of references cited by the applicant is for the reader's convenience only.
It does not form part of the European patent document. Even though great care has
been taken in compiling the references, errors or omissions cannot be excluded and
the EPO disclaims all liability in this regard.
Patent documents cited in the description