TECHNICAL FIELD
[0001] The present disclosure relates to railroad technology and more generally to methods
and devices for monitoring the integrity of a railroad vehicle.
BACKGROUND
[0002] Railroad vehicles are made up of several cars connected together by means of mechanical
coupling devices. If a coupling device fails during operation, the railroad vehicle
may break up accidentally. As a result, stray cars separated from the remainder of
the vehicle are likely to run away uncontrollably on the railroad track and collide
with other railroad vehicles.
[0003] To mitigate this risk, trackside monitoring devices such as axle counters have been
used to detect any occurrence of a railroad vehicle break-up. For example, the number
of axles of a train is counted upon entering and exiting a portion of a railroad track.
An alert is raised if a discrepancy indicating a train breakup is detected.
[0004] However, with the advent of new railroad signaling systems, such as ERTMS Level 3,
it is desirable to provide automated on-board methods and devices for monitoring train
integrity.
SUMMARY
[0005] According to some aspects, a method for monitoring railroad vehicle integrity in
a railroad vehicle including a three-axis inertial measurement unit placed in a rear
portion of the railroad vehicle comprises:
measuring incremental rotation values along three reference axes of the railroad vehicle
during measurement periods, using said three-axis inertial measurement unit,
detecting, by an electronic processing unit, any anomalous variation of at least one
value representative of at least one of the measured incremental rotation values,
said anomalous variation being representative of a railroad vehicle break-up condition.
[0006] In one or more embodiments, the method comprises:
calculating, by the electronic processing unit, advantageously for each measurement
period, a quaternion including first, second and third numerical values representative
of the measured incremental rotation values along the three reference axes,
and wherein detecting said anomalous variation includes detecting any anomalous variation
of at least one of the first, second or third numerical values of the calculated quaternions,
said anomalous variation being representative of a railroad vehicle break-up condition.
[0007] In one or more embodiments, detecting said anomalous variation includes detecting
a change of sign of at least one of the first, second or third numerical values between
two consecutive measurement periods.
[0008] In one or more embodiments, detecting said anomalous variation includes detecting
an amplitude variation for at least one of the first, second or third numerical values
higher than a predefined threshold over previous measurement periods.
[0009] In one or more embodiments, detecting said anomalous variation includes comparing
at least one of the first, second or third numerical values for at least one measurement
period with predefined reference data.
[0010] In one or more embodiments, the method further includes, upon identifying a break-up
condition, estimating the railroad vehicle's location where the break-up took place,
for example using a location device and/or using measured train speed and/or acceleration
values.
[0011] In one or more embodiments, the first, second and third numerical values correspond
respectively to incremental value motion amplitude along yaw, roll and pitch axes
of the rolling stock vehicle in which the three-axis inertial measurement unit is
located.
[0012] In one or more embodiments, the measurement periods are repeated with a sampling
frequency comprised between 50Hz and 100Hz.
[0013] In one or more embodiments, the method includes, upon identifying a train break-up
condition: sending an alarm signal to an external signaling system, such as a radio
block center, using a radio transponder operatively coupled to the electronic processing
unit.
[0014] According to other aspects, a railroad vehicle includes a three-axis inertial measurement
unit placed in a rear portion of the railroad vehicle and an electronic processing
unit programmed to perform steps of:
measuring incremental rotation values along three reference axes of the railroad vehicle
during measurement periods using said three-axis inertial measurement unit,
detecting any anomalous variation of at least one value representative of at least
one of the measured incremental rotation values, said anomalous variation being representative
of a railroad vehicle break-up condition.
BRIEF DESCRIPTION OF THE DRAWINGS
[0015] The invention will be better understood upon reading the following description, provided
solely as an example, and made in reference to the appended drawings, in which:
- Fig. 1 is a simplified diagram of a railroad vehicle including a system for monitoring
railroad vehicle integrity according to some embodiments;
- Fig. 2 is a simplified diagram of an exemplary system for monitoring railroad vehicle
integrity according to some embodiments;
- Fig. 3 is a flow chart depicting an exemplary method for monitoring railroad vehicle
integrity according to some embodiments.
DETAILED DESCRIPTION OF SOME EMBODIMENTS
[0016] Figure 1 illustrates a railroad vehicle such as a train 2 or a tramway or a metro
running on a railroad track 4.
[0017] The train 2 comprises several railway/railroad cars also called rolling stock vehicles
connected together by means of mechanical coupling devices, such as railroad couplers.
[0018] The rolling stock vehicles may be locomotives, or wagons or passenger cars, or motor
coaches, or electric multiple units.
[0019] According to examples, the train 2 is a passenger train or a freight train.
[0020] In the illustrated example, the train 2 comprises a lead car 6, a rear car 8 and
intermediary cars 10, 12 coupled together between the lead car 6 and the rear car
8.
[0021] In the above examples, the "lead" and "rear" ends of the train 2 may be defined in
reference to the train's movement. For example, in reversible trains, the head and
rear may be indistinguishable from each other and may be defined only in reference
to the train's moving direction during operation.
[0022] In one or more embodiments, the train 2 also comprises a central control unit 14
adapted to implement and/or oversee signaling-related functions pertaining to the
train 2.
[0023] In some examples, the central control unit 14 is an embodiment of the "European Vital
Computer" (EVC) defined by ERTMS standards (European Rail Traffic Management System).
[0024] For example, the central control unit 14 includes electronic circuitry and/or at
least one electronic processing unit such as a microprocessor, or a microcontroller,
or a digital signal processing circuit, or an application-specific integrated circuit,
or a programmable logic device, or any combination thereof.
[0025] The central control unit 14 may be programmed to automatically execute software instructions
and/or software code stored in a computer memory (i.e., a non-transitory computer-readable
storage medium) for implementing one or several algorithms.
[0026] According to some embodiments, the train 2 also comprises an onboard railway vehicle/train
integrity monitoring system 16 including at least one three-axis inertial measurement
unit and an electronic processing unit.
[0027] The integrity monitoring system 16 is configured to detect a break-up of the train
2 during operation, as explained below.
[0028] For example, a "train break-up" may be defined as an accidental separation of one
or more of the rolling stock vehicles composing train 2, for example due to a failure
of a mechanical coupling device. In practice, during such a break-up, one or more
rolling stock vehicles are left on the tracks behind the remaining portion of the
train 2 and are no longer under control of the train's driver.
[0029] In some embodiments, the control unit 14 and the monitoring system 16 both include
a radio transponder 18 adapted to communicate wirelessly with a remote control center
20 through a radio communication link (illustrated on Figure 1 by dashed lines).
[0030] In the illustrated embodiments, the control unit 14 and the monitoring system 16
are embodied by two separate devices, which may be placed at different locations of
the train 2.
[0031] Preferably, the monitoring system 16 is placed in a rear portion of the train, for
example in the rear car 8. One reason is that, in practice, when a train break-up
occurs, the stranded portion of train will correspond to the rear portion, while the
front portion of the train (usually the one including the train's driver and at least
one source of traction power) will continue to move ahead. Therefore, placing the
monitoring system 16 in the rear of the train 2 will increase the chances of detecting
a break-up event.
[0032] In the example above, the control unit 14 is placed in the lead car 6.
[0033] In some other embodiments, for example in reversible trains 2 or in trains 2 composed
of electric multiple units, the integrity monitoring system 16 may be integrated into
a control unit 14 (e.g., the electronic processing unit of the monitoring system 16
may be implemented by the control circuit 14).
[0034] In such cases, the train 2 may comprise two or more control units 14 each equipped
with such integrity monitoring capabilities and placed at different locations of the
train 2.
[0035] For example, control units 14 are placed in both lead and rear cars 6 and 8.
[0036] According to some embodiments, at least one radio block center (RBC) 20 is operatively
coupled to a railroad control center 22.
[0037] For example, the radio block center 20 includes trackside signaling devices for controlling
rail traffic in a specific area such as a railroad block, for example to acquire data
related to block occupancy and to send railroad signals such as movement authority
signals. The radio block center 20 may be automatically controlled by electronic circuitry
and/or by relay-based electric circuits.
[0038] In some examples, the radio block center 20 includes a radio transponder 24 adapted
to communicate wirelessly with the radio transponders 18.
[0039] The railroad control center 22, which may be part of a railroad interlocking facility,
oversees rail traffic in a railroad network including one or more railroad blocks
each controlled by a radio block center 20.
[0040] In the illustrated example, the control unit 14 may communicate with the remote radio
block center 20 (and indirectly with the remote control center 22) using the radio
communication link provided by radio transponders 18 and 24.
[0041] On Figure 2 there is illustrated a railway vehicle/train integrity monitoring system
30 installed onboard the train 2. The system 30 is an exemplary embodiment of the
monitoring system 16 described above, however some features described below in reference
to the system 30 may be applicable to other embodiments of the monitoring system 16.
[0042] According to some embodiments, the monitoring system 30 includes a three-axis inertial
measurement unit 32 (such as a gyroscope or any appropriate motion sensor), a locating
device 34, a speed sensor 36, an accelerometer 38 and an electronic processing unit
40. The radio transponder 18 is operatively coupled to the electronic processing unit
40.
[0043] In many examples, the electronic processing unit 40 includes electronic circuitry
and/or at least one electronic processing unit such as a microprocessor, or a microcontroller,
or a digital signal processing circuit, or an application-specific integrated circuit,
or a programmable logic device, or any combination thereof.
[0044] The processing unit 40 may be programmed to automatically execute software instructions
and/or software code stored in a computer memory (i.e., a non-transitory computer-readable
storage medium) for implementing one or several algorithms.
[0045] The three-axis inertial measurement unit 32 is capable of measuring incremental rotation
values of the rolling stock vehicle in which it is located (e.g., of the rear car
8).
[0046] For example, the three measurement axes of the inertial measurement unit 32 correspond
to the pitch, yaw and roll axis of the car/rolling stock vehicle in which the measurement
unit 32 is located.
[0047] The locating device 34 is adapted to determine geographic coordinates of the train
2.
[0048] In some embodiments, the locating device 34 includes a global satellite positioning
device (e.g., a GPS receiver).
[0049] In some other embodiments, the locating device 34 is adapted to determine the train's
location by using a beacon antenna belonging to a signaling system of the train 2
to identify the train's position relative to fixed signaling devices (such as trackside
radio beacons). For example, the locating device 34 is implemented in software by
using the processing unit 40 and/or includes special-purpose electronic circuitry.
[0050] For example, the train's position is located by the locating device 34 by identifying
that the train lies in a specific block or a specific position of the railway (e.g.,
its position can be expressed relative to the known location of a trackside signal
antenna or a beacon installed close to the railroad).
[0051] In other examples, the train's position may be identified by the locating device
34 by triangulation using radio signals exchanged with trackside signaling systems
having a fixed known position.
[0052] In some other embodiments, the train's location may be estimated by measuring the
train's speed and/or acceleration using the speed sensor 36 and/or the accelerometer
38 and then by computing, from the measured speed and/or acceleration values, the
relative position of the train 2 with reference to a predefined location.
[0053] In some examples, the above methods for estimating the train's location may be combined,
for example to obtain more reliable location information.
[0054] In some other examples, the locating device 34 and/or the speed sensor 36 and/or
the accelerometer 38 may be omitted.
[0055] In some embodiments, the monitoring system 30 may be powered by a battery so as to
be able to operate even when a break-up has occurred and the rear car 8 is separated
from the train's 2 power source.
[0056] An exemplary method for monitoring train integrity using embodiments of the monitoring
system 16 is now described in reference to the flow chart of Figure 3.
[0057] At step S100, incremental rotation values along three reference axes of the train
are measured repeatedly, during a plurality of measurement periods, using the three-axis
inertial measurement unit 32.
[0058] For example, the measurement periods are repeated with a sampling frequency comprised
between 50Hz and 100Hz.
[0059] At step S102, a quaternion is calculated automatically, for each measurement period,
using the processing unit 40.
[0060] For example, steps S102 are repeated regularly, preferably with the same frequency
as steps S100.
[0061] Each quaternion includes first, second and third numerical values representative
of the incremental rotation values measured along the three reference axes by the
measurement unit 32 for the corresponding measurement period.
[0062] For example, a quaternion is a mathematical object comprising a vector value defined
by first, second and third numerical values.
[0063] Advantageously, a quaternion is a mathematical object comprising a scalar value and
a vector value defined by first, second and third numerical values.
[0064] In some embodiments, the quaternion defines rotation parameters using an axis-angle
representation. The scalar value is representative of a rotation angle around a fixed
axis (such as an Euler axis defined for this system). The first, second and third
numerical values are representative of vector coordinates expressed relatively to
unit vectors defining a fixed three-dimensional Cartesian reference frame.
[0065] Quaternions may be stored in memory and handled by the processing unit 40 as digital
data structures, such as lists or vectors or any appropriate data structure.
[0066] If the rotation is sufficiently small (as is the case for incremental rotations measured
by the measurement unit 32 during each of the measurement periods), then the scalar
value can be approximated to take a null value and the first, second and third numerical
values are representative of the incremental rotation motion undergone by the corresponding
rolling stock vehicle/car during the measurement period.
[0067] In some embodiments, the first, second and third numerical values correspond to incremental
value motion amplitude along yaw, roll and pitch axes of the rolling stock vehicle/car,
such as the rear car 8 in which the three-axis inertial measurement unit 32 is located.
[0068] At step S104, the processing unit 40 automatically detects an anomalous variation
of one of the first, second or third numerical values of the calculated quaternions,
said anomalous variation being representative of a train break-up condition.
[0069] In some embodiments, detecting said anomalous variation includes detecting a change
of sign of at least one of the first, second or third numerical values between two
consecutive measurement periods.
[0070] For example, if a break-up occurs when the train 2 is climbing a slope, then the
stray portion of train will suddenly run back down the slope and thus the pitch incremental
rotation will suddenly change in the opposite direction.
[0071] In another example, if a break-up occurs when the train 2 is running along an inward
curved portion of rail track, then the stray portion of train will suddenly reverse
and follow an outward turning movement opposed to the previous inward turning movement.
Thus, the yaw incremental rotation will suddenly change in the opposite direction.
[0072] In some embodiments, detecting said anomalous variation includes detecting an amplitude
variation for at least one of the first, second or third numerical values higher than
a predefined threshold over previous measurement periods.
[0073] For example, an anomalous variation is said to occur for one of said numerical values
if the amplitude of said numerical value (i.e., the magnitude of change of the numerical
value) varies (in absolute value) more than 20%, or more than 40%, or more than 60%,
or more than 100%, over one or several measurement periods.
[0074] For example, if a break-up occurs when the train 2 is running down a slope, then
the stray portion of train will suddenly run down the slope much faster (since the
train's driver will no longer be able to control the brakes of the stray portion)
and thus the magnitude of the pitch incremental rotation will suddenly increase while
remaining in the same direction.
[0075] In some embodiments, detecting said anomalous variation includes comparing at least
one of the first, second or third numerical values for at least one measurement period
with predefined reference data.
[0076] Referring back to Figure 2, the monitoring system 30 may include a database 42 including
quaternion-related reference data and/or a database 44 including train break-up reference
data, which may be built beforehand using simulation data and/or experimental data
and/or data acquired during previous train break-up incidents (reference 46).
[0077] For example, during step S104, the magnitude and/or pattern of change of at least
one of the first, second or third numerical values (or any composite value representative
of rotation angular change computed from said first, second or third numerical values)
is compared with reference data from database 42 and/or from database 44.
[0078] According to other examples, the monitoring system 30 may automatically compute (e.g.,
extrapolate), between actual measurements, predicted first, second and third values,
based on values of the most recently measured quaternion values and using reference
data included in databases 42 and/or 44, such as geometrical features of the railroad
track and/or dynamic response of the train 2.
[0079] Then, after a measurement has taken place (step S102), during the corresponding step
S104, the calculated quaternion values are then compared with the predicted values
and an anomalous variation is found is one or several of the first, second or third
measured numerical values differ from the predicted values by more than a predefined
threshold.
[0080] Optionally, relevant data may be chosen from databases 42 and/or 44 by the processing
unit 40 depending on the estimated location of the train's 2.
[0081] In some other embodiments, the processing unit 40 may implement any combination of
the exemplary detection methods described above.
[0082] In any case, according to many embodiments, if no anomalous variation is detected
during step S104, then no break-up condition is identified. Train operation may continue
normally and steps S100, S102 and S104 may continue to be repeated, possibly until
the end of the train's journey.
[0083] However, if an anomalous variation is detected then, at step S106, a train break-up
condition is automatically identified by the processing unit 40.
[0084] Optionally, the train's location may be estimated (and recorded) by the monitoring
system 30 using the locating device 34 and/or the speed sensor 36 and/or the accelerometer
38 as previously described.
[0085] In response to the identification of train break-up condition, at step S108, an alarm
signal is automatically sent by the monitoring device 16 to an external signaling
system, such as the radio block center 20, using the radio transponder 18 associated
to the monitoring system 16.
[0086] Optionally, the break-up location estimated by the monitoring system 30 is also sent
to the signaling system alongside the alarm signal.
[0087] In some embodiments, upon receiving the alarm signal, the external signaling system
automatically takes action to manage the situation according to predefined safety
rules, for example by preventing incoming trains from colliding with the stray portion
of the train 2 and/or by stopping the remainder of the train 2.
[0088] For example, the radio block center 20 may send a notification to the control center
22. The radio block center 20 (and possibly some neighboring radio block centers 20
controlled by the control center 22) may update the railroad signals under their control
to stop all railroad traffic in the corresponding railroad portion, for example by
updating the movement authority of the train 2 and/or of any other incoming train.
[0089] Optionally, the external signaling system may be requested to confirm occurrence
of a break-up event before taking action such as updating signals.
[0090] For example, after step S106, the monitoring system 30 automatically sends measured
rotation data to the external signaling system (e.g., to the radio block center 20)
and the latter is programmed to automatically confirm or deny the occurrence of the
break-up event, for example based on knowledge of features of the corresponding rail
track (e.g., slope gradients, curvature, length, etc.).
[0091] In summary, the embodiments disclosed above advantageously provide automated methods
and devices for monitoring train integrity using on-board equipment installed inside
the train 2. In other words, a train break-up can be detected without having to rely
on external track circuits or trackside monitoring devices such as axle counters.
This is particularly useful for use on railroads equipped with new signaling systems
which do not rely on track circuits, such as ERTMS Level 3.
[0092] The embodiments and alternatives described above may be combined with each other
in order to generate new embodiments of the invention.
1. A method for monitoring a railroad vehicle integrity, the railroad vehicle (2) including
a three-axis inertial measurement unit (32) placed in a rear portion of the railroad
vehicle, the method comprising:
measuring (S100) incremental rotation values along three reference axes of the railroad
vehicle during measurement periods, using said three-axis inertial measurement unit,
detecting (S106), by an electronic processing unit, any anomalous variation of at
least one value representative of at least one of the measured incremental rotation
values, said anomalous variation being representative of a railroad vehicle break-up
condition.
2. The method of claim 1, wherein the method comprises:
calculating (S102), by the electronic processing unit, advantageously for each measurement
period, a quaternion including first, second and third numerical values representative
of the measured incremental rotation values along the three reference axes,
and wherein detecting said anomalous variation includes detecting any anomalous variation
of at least one of the first, second or third numerical values of the calculated quaternions,
said anomalous variation being representative of a railroad vehicle break-up condition.
3. The method according to claim 1 or claim 2, wherein detecting said anomalous variation
includes detecting a change of sign of at least one of the first, second or third
numerical values between two consecutive measurement periods.
4. The method according to any one of claim 1 to claim 3, wherein detecting said anomalous
variation includes detecting an amplitude variation for at least one of the first,
second or third numerical values higher than a predefined threshold over previous
measurement periods.
5. The method according to any one of claim 1 to claim 4, wherein detecting said anomalous
variation includes comparing at least one of the first, second or third numerical
values for at least one measurement period with predefined reference data.
6. The method according to any one of claim 1 to claim 5, wherein the method further
includes, upon identifying a break-up condition, estimating the railroad vehicle's
location where the break-up took place, for example using a location device (34) and/or
using measured railroad vehicle speed and/or acceleration values.
7. The method according to any one of claim 1 to claim 6, wherein the first, second and
third numerical values correspond to incremental value motion amplitude along yaw,
roll and pitch axes of a car of the railroad vehicle in which the three-axis inertial
measurement unit is located.
8. The method according to claims 1 to 7, wherein the measurement periods are repeated
with a sampling frequency comprised between 50Hz and 100Hz.
9. The method according to claims 1 to 8, wherein the method includes, upon identifying
a railroad vehicle break-up condition: sending (S108) an alarm signal to an external
signaling system, such as a radio block center (20), using a radio transponder (18)
operatively coupled to the electronic processing unit.
10. A railroad vehicle (2), comprising a three-axis inertial measurement unit (32) placed
in a rear portion of the railroad vehicle and an electronic processing unit (40) programmed
to perform steps of:
measuring (S100) incremental rotation values along three reference axes of the railroad
vehicle during measurement periods using said three-axis inertial measurement unit,
detecting (S106) any anomalous variation of at least one value representative of at
least one of the measured incremental rotation values, said anomalous variation being
representative of a railroad vehicle break-up condition.