FIELD
[0001] The present disclosure pertains to reconfiguration of time division duplex (TDD)
uplink/downlink (UL/DL) configuration, and more particularly, to hybrid automatic
repeat request (HARQ) for dynamic changes of TDD UL/DL configuration in Long Term
Evolution (LTE) TDD systems.
BACKGROUND
[0002] In wireless communications systems, such as long term evolution (LTE) systems, downlink
and uplink transmissions may be organized into two duplex modes: frequency division
duplex (FDD) mode and time division duplex (TDD) mode. The FDD mode uses a paired
spectrum where the frequency domain is used to separate the uplink (UL) and downlink
(DL) transmissions. FIG. 1A is a graphical illustration of a UL and DL subframe separated
in the frequency domain for the FDD mode. In TDD systems, an unpaired spectrum may
be used where both UL and DL are transmitted over the same carrier frequency. The
UL and DL are separated in the time domain. FIG. 1B is a graphical illustration of
uplink and downlink subframes sharing a carrier frequency in the TDD mode.
[0003] US 2011/0211503 A1 discloses systems and methods for enabling the dynamic allocation of certain sub
frames as downlink or uplink resources in a time division duplexed over the air communications
system. A base station or eNB may allocate certain subframes within a repeating radio
frame of a TDD configuration as either DL or UL subframes for communicating to user
equipment or UE devices to increase efficient use of system resources based on the
data to be transmitted. Methods for determining the capabilities of a selected UE
and based on the determining step, dynamically allocating certain subframes are disclosed.
The methods and systems are compatible with user equipment that does not support the
dynamic allocation of subframes.
[0004] WO 2010/129295 A1 discloses a method and system for dynamic adjustment of downlink/uplink resource
allocation ratio in a long-term evolution (LTE) time division duplex (TDD) system.
The method includes replacing at least one uplink subframe in a subframe pattern with
at least one of a mute subframe and a mute uplink pilot timeslot (UpPTS), within a
geographical guard area that isolates at least two areas having different TDD allocation
patterns. The method further includes scheduling an uplink transmission from at least
one mobile terminal such that the at least one of the mute subframe and the mute UpPTS
are unused. A simple solution or a TDD configuration index substitution solution,
or any combination thereof, may be used to control the uplink transmission involving
a mute subframe or a mute UpPTS.
[0005] According to a first aspect, there is provided a method as set out in claim 1.
[0006] According to a second aspect, there is provided a network element as set out in claim
12.
DESCRIPTION OF THE DRAWINGS
[0007]
FIG. 1A is a graphical illustration of an uplink and downlink subframe separated in
the frequency domain for the FDD mode.
FIG. 1B is a graphical illustration of uplink and downlink subframes sharing a carrier
frequency in the TDD mode.
FIG. 2 is a schematic representation of an example wireless cellular communication
system based on 3rd Generation Partnership Project Long Term Evolution (LTE).
FIG. 3 is a schematic block diagram illustrating an access node device according to
one embodiment.
FIG. 4 is a schematic block diagram illustrating a user equipment device according
to one embodiment.
FIG. 5A is an example schematic illustration showing a DL HARQ case for configuration
change from configuration 4 to configuration 5.
FIG. 5B is an example schematic illustration showing a UL HARQ case for configuration
change from configuration 2 to configuration 1.
FIG. 5C is an example schematic illustration showing UL HARQ case for configuration
change from configuration 0 to configuration 2.
FIG. 6 is a configuration change map for consideration of DL HARQ timing in accordance
with the present disclosure.
FIG. 7 is a schematic illustration showing an example of a DL HARQ timing linkage
transition during the TDD UL/DL configuration change from configuration 1 to configuration
6 in accordance to the present disclosure.
FIG. 8 is a configuration change map for consideration of UL HARQ and UL grant timing
in accordance with the present disclosure.
FIG. 9 is a schematic illustration showing an example of a UL HARQ and retransmission
timing during UL/DL configuration 0 in radio frame 1 change to configuration 1 in
radio frame 2 in accordance to the present disclosure.
FIG. 10 is a configuration change map for consideration of both DL and UL timing in
accordance with the present disclosure.
FIG. 11 is a schematic illustration showing an example of a UL and DL timing linkage
transition during UL/DL configuration 4 change to configuration 1 in accordance to
the present disclosure.
FIG. 12 is a process flowchart for reconfiguring TDD UL/DL configuration.
FIG. 13 is an example schematic illustration showing PUSCH adaptive retransmission
during reconfiguration of UL/DL configuration 0 to configuration 2.
FIG. 14 is a configuration change map for UL HARQ and grant timing consideration with
adaptive PUSCH retransmission in accordance with the present disclosure.
FIG. 15 is a configuration change map for consideration of both DL and UL timing with
adaptive PUSCH retransmission in accordance with the present disclosure.
FIG. 16 is a process flowchart of adaptive PUSCH retransmission.
DETAILED DESCRIPTION
[0008] Aspects of the present disclosure involve systems, apparatuses, and methods for reconfiguring
a time division duplex (TDD) uplink/downlink (UL/DL) configuration. A first TDD UL/DL
configuration can be identified for a first radio frame. A second TDD UL/DL configuration
can be identified for a second radio frame adjacent the first radio frame. The second
TDD UL/DL configuration identified based, at least in part, on one or more subframes
of the second TDD UL/DL configuration that can communicate hybrid automatic repeat
request (HARQ) acknowledgement/negative acknowledgement (ACK/NACK) indicators for
corresponding subframes of the first TDD UL/DL configuration. The TDD UL/DL configuration
can be reconfigured based on the identified second TDD UL/DL configuration.
[0009] In certain aspects of the implementations, the second TDD UL/DL configuration may
support a greater or equal number of HARQ processes than the first TDD UL/DL configuration.
[0010] In certain aspects of the implementations, the first TDD UL/DL configuration supports
a greater number of HARQ processes than the second TDD UL/DL configuration. The first
TDD UL/DL configuration may be associated with a first number of HARQ processes, and
the method may further include maintaining, at least temporarily, the first number
of HARQ processes for the second TDD UL/DL configuration. The second TDD UL/DL configuration
may be associated with a second number of HARQ buffers. Aspects may also include executing
a second number of HARQ processes associated with the first TDD UL/DL configuration,
the second number of HARQ processes equal to the second number of HARQ buffers. Aspects
may also include communicating an ACK indicator prior to the reconfiguring of the
TDD UL/DL configuration.
[0011] Certain aspects of the disclosure may also include completing a HARQ process for
physical downlink/uplink shared channel prior to reconfiguration from the first TDD
UL/DL configuration to the second TDD UL/DL configuration. Certain aspects may also
include controlling the number of HARQ processes for physical downlink/uplink shared
channel prior to reconfiguration from the first TDD UL/DL configuration to the second
TDD UL/DL configuration.
[0012] In certain aspects of the implementations the HARQ processes are uplink (UL) HARQ
processes. Certain aspects include storing excess UL HARQ processes in a queue and
upon receiving a negative new data indicator, executing a first UL HARQ process of
the UL HARQ processes stored in the queue.
[0013] Aspects of the present disclosure involve systems, apparatuses, and methods for identifying
a first time division duplex (TDD) uplink/downlink (UL/DL) configuration for a first
radio frame. It may be determined that a hybrid automatic repeat request (HARQ) acknowledgement/negative
acknowledgement (ACK/NACK) indicator is to be transmitted on a second radio frame
adjacent the first radio frame. A second TDD UL/DL configuration can be identified
for the second radio frame based, at least in part, on the TDD UL/DL configuration
of the first radio frame. In certain aspects of the implementations, the second TDD
UL/DL configuration includes a corresponding subframe for communicating the ACK/NACK
indicator. In certain aspects of the disclosure, identifying the second TDD UL/DL
configuration may include identifying a subset of TDD UL/DL configurations available
for communicating an ACK/NACK indicator for one or more subframes of the first TDD
UL/DL configuration.
[0014] Aspects of the present disclosure involve systems, apparatuses, and methods performed
at a base station of a wireless communications network for receiving a physical uplink
shared channel (PUSCH). It may be determined that the PUSCH was decoded incorrectly.
It may also be determined that a change in time division duplex TDD uplink/downlink
UL/DL configuration is required. A new TDD UL/DL configuration can be identified,
the new TDD UL/DL configuration associated with a new uplink (UL) timing. A UL grant
may be sent for PUSCH retransmission based on a UL grant timing of the current configuration.
In certain aspects of the implementations, the UL grant is sent using a downlink control
information (DCI) message. In certain aspects of the implementations, sending the
UL grant for PUSCH retransmission may also include sending a negative new data indicator.
[0015] The details of one or more embodiments of the invention are set forth in the accompanying
drawings and the description below. Other features, objects, and advantages of the
invention will be apparent from the description and drawings, and from the claims.
For example, the present disclosure facilitates a smooth transition of both DL and
UL HARQ timing linkage during the change of different TDD UL/DL configurations. The
configuration map provided herein can minimize UE confusions on possible error scenarios
and facilitate conformance tests.
[0016] Mobile electronic devices may operate in a communications network, such as the network
shown in FIG. 2, which is based on the third generation partnership project (3GPP)
long term evolution (LTE), also known as Evolved Universal Terrestrial Radio Access
(E-UTRA). More specifically, FIG. 2 is a schematic representation of an example wireless
communication system 200 based on 3GPP LTE. The system 200 shown in FIG. 2 includes
a plurality of base stations 212 (i.e., 212a and 212b). In the LTE example of FIG.
2, the base stations are shown as evolved Node B (eNB) 212a,b. In this disclosure,
references to eNB are intended to refer to an access node device, such as a base station
or any other communications network node that provides service to a mobile station
including femtocell, picocell, or the like. The example wireless communication system
200 of FIG. 2 may include one or a plurality of radio access networks 210, core networks
(CNs) 220, and external networks 230. In certain implementations, the radio access
networks may be Evolved Universal Mobile Telecommunications System (UMTS) terrestrial
radio access networks (EUTRANs). In addition, in certain instances, core networks
220 may be evolved packet cores (EPCs). Further, there may be one or more mobile electronic
devices 202 obtaining communication services via the example wireless communication
system 200. In some implementations, 2G/3G systems 240,
e.g., Global System for Mobile communication (GSM), Interim Standard 95 (IS-95), Universal
Mobile Telecommunications System (UMTS) and CDMA2000 (Code Division Multiple Access)
may also be integrated into the communication system 200.
[0017] In the example LTE system shown in FIG. 2, the EUTRAN 210 includes eNB 212a and eNB
212b. Cell 214a is the service area of eNB 212a and Cell 214b is the service area
of eNB 212b. The term cell is intended to describe a coverage area associated with
a base station regardless and may or may not overlap with the coverage areas associated
with other base stations. In FIG 2, User Equipment (UE) 202a and UE 202b operate in
Cell 214a and are served by eNB 212a. The EUTRAN 210 can include one or a plurality
of eNBs 212 and one or a plurality of UEs can operate in a cell. The eNBs 212 communicate
directly to the UEs 202. In some implementations, the eNB 212 may be in a one-to-many
relationship with the UE 202, e.g., eNB 212a in the example LTE system 200 can serve
multiple UEs 202 (
i.e., UE 202a and UE 202b) within its coverage area Cell 214a, but each of UE 202a and
UE 202b may be connected only to one eNB 212a at a time. In some implementations,
the eNB 212 may be in a many-to-many relationship with the UEs 202,
e.g., UE 202a and UE 202b can be connected to eNB 212a and eNB 212b. The eNB 212a may be
connected to eNB 212b with which handover may be conducted if one or both of UE 202a
and UE 202b travels from cell 214a to cell 214b. UE 202 may be any communications
device used by an end-user to communicate, for example, within the LTE system 200.
The UE 202 may alternatively be referred to as mobile electronic device, user equipment,
user device, mobile device, mobile station, subscriber station, or wireless terminal.
In some embodiments, UE 202 may be a cellular phone, personal data assistant (PDA),
smart phone, laptop, tablet personal computer (PC), pager, portable computer, or other
types of mobile communications device, including communications apparatus used in
wirelessly connected automobiles, appliances, or clothing.
[0018] UEs 202 may transmit voice, video, multimedia, text, web content and/or any other
user/client-specific content. On the one hand, the transmission of some of these contents,
e.g., video and web content, may require high channel throughput to satisfy the end-user
demand. On the other hand, the channel between UEs 202 and eNBs 212 may be contaminated
by multipath fading, due to the multiple signal paths arising from many reflections
in the wireless environment. Accordingly, the UEs' transmission may adapt to the wireless
environment. In short, UEs 202 generate requests, send responses or otherwise communicate
in different means with Enhanced Packet Core (EPC) 220 and/or Internet Protocol (IP)
networks 230 through one or more eNBs 212.
[0019] A radio access network is part of a mobile telecommunication system which implements
a radio access technology, such as UMTS, CDMA2000, and 3GPP LTE. In many applications,
the Radio Access Network (RAN) included in a LTE telecommunications system 200 is
called an EUTRAN 210. The EUTRAN 210 can be located between UEs 202 and EPC 220. The
EUTRAN 210 includes at least one eNB 212. The eNB can be a radio base station that
may control all or at least some radio related functions in a fixed part of the system.
The at least one eNB 212 can provide radio interface within their coverage area or
a cell for UEs 202 to communicate. eNBs 212 may be distributed throughout the communications
network to provide a wide area of coverage. The eNB 212 directly communicates to one
or a plurality of UEs 202, other eNBs, and the EPC 220.
[0020] The eNB 212 may be the end point of the radio protocols towards the UE 202 and may
relay signals between the radio connection and the connectivity towards the EPC 220.
In certain implementations, the EPC 220 is the main component of a core network (CN).
The CN can be a backbone network, which may be a central part of the telecommunications
system. The EPC 220 can include a mobility management entity (MME), a serving gateway
(SGW), and a packet data network gateway (PGW). The MME may be the main control element
in the EPC 220 responsible for the functionalities including the control plane functions
related to subscriber and session management. The SGW can serve as a local mobility
anchor, such that the packets are routed through this point for intra EUTRAN 210 mobility
and mobility with other legacy 2G/ 3G systems 240. The SGW functions may include the
user plane tunnel management and switching. The PGW may provide connectivity to the
services domain including external networks 230, such as the IP networks. The UE 202,
EUTRAN 210, and EPC 220 are sometimes referred to as the evolved packet system (EPS).
It is to be understood that the architectural evolvement of the LTE system 200 is
focused on the EPS. The functional evolution may include both EPS and external networks
230.
[0021] Though described in terms of FIG. 2, the present disclosure is not limited to such
an environment. In general, telecommunication systems may be described as communications
networks made up of a number of radio coverage areas, or cells that are each served
by a base station or other fixed transceiver. Example telecommunication systems include
Global System for Mobile Communication (GSM) protocols, Universal Mobile Telecommunications
System (UMTS), 3GPP Long Term Evolution (LTE), and others. In addition to telecommunication
systems, wireless broadband communication systems may also be suitable for the various
implementations described in the present disclosure. Example wireless broadband communication
systems include IEEE 802.11 wireless local area network, IEEE 802.16 WiMAX network,
etc.
[0022] Referring to FIG. 3, a schematic block diagram illustrating an access node device
(for example, eNB 212a in FIG 2) according to one embodiment will be described below.
The illustrated device 300 includes a processing module 302, a wired communication
subsystem 304, and a wireless communication subsystem 306. The processing module 302
can include a processing component (alternatively referred to as "processor" or "central
processing unit (CPU)") capable of executing instructions related to one or more of
the processes, steps, or actions described above in connection with one or more of
the embodiments disclosed herein. The processing module 302 can also include other
auxiliary components, such as random access memory (RAM), read only memory (ROM),
secondary storage (for example, a hard disk drive or flash memory). The processing
module 302 can execute certain instructions and commands to provide wireless or wired
communication, using the wired communication subsystem 304 or the wireless communication
subsystem 306. A skilled artisan will readily appreciate that various other components
can also be included in the device 300.
[0023] FIG. 4 is a schematic block diagram illustrating a user equipment device (for example,
UEs 202a, 202b in FIG. 2) according to one embodiment. The illustrated device 400
includes a processing unit 402, a computer readable storage medium 404 (for example,
ROM or flash memory), a wireless communication subsystem 406, a user interface 408,
and an I/O interface 410.
[0024] Similar to the processing module 302 of FIG. 3, the processing unit 402 can include
a processing component configured to execute instructions related to one or more of
the processes, steps, or actions described above in connection with one or more of
the embodiments disclosed herein. The processing unit 402 can also include other auxiliary
components, such as random access memory (RAM) and read only memory (ROM). The computer
readable storage medium 404 can store an operating system (OS) of the device 400 and
various other computer executable software programs for performing one or more of
the processes, steps, or actions described above.
[0025] The wireless communication subsystem 406 is configured to provide wireless communication
for data and/or control information provided by the processing unit 402. The wireless
communication subsystem 406 can include, for example, one or more antennas, a receiver,
a transmitter, a local oscillator, a mixer, and a digital processing (DSP) unit. In
some embodiments, the wireless communication subsystem 406 can support a multiple
input multiple output (MIMO) protocol.
[0026] The user interface 408 can include, for example, a screen or touch screen (for example,
a liquid crystal display (LCD), a light emitting display (LED), an organic light emitting
display (OLED), a microelectromechanical system (MEMS) display), a keyboard or keypad,
a trackball, a speaker, or a microphone. The I/O interface 410 can include, for example,
a universal serial bus (USB) interface. A skilled artisan will readily appreciate
that various other components can also be included in the device 400.
[0027] In the 3GPP LTE TDD system, a subframe of a radio frame can be a downlink, an uplink
or a special subframe (the special subframe includes downlink and uplink time regions
separated by a guard period for downlink to uplink switching). The 3GPP specification
defines seven different UL/DL configuration schemes in LTE TDD operations. They are
listed in Table 1. The letter "D" represents downlink subframes; the letter "U" is
for uplink subframes. The letter "S" is the special frame, which includes three parts,
i) the downlink pilot time slot (DwPTS), ii) the uplink pilot time slot (UpPTS) and
iii) the guard period (GP). Downlink transmissions on the PDSCH may be made in DL
subframes or in the DwPTS portion of a special subframe.

As Table 1 shows, there are two switching point periodicities specified in the LTE
standard, 5ms and 10ms. The 5ms switching point periodicity is introduced to support
the co-existence between LTE and low chip rate UTRA TDD systems and 10ms switching
point periodicity is for the coexistence between LTE and high chip rate UTRA TDD system.
The supported configurations cover a wide range of UL/DL allocations from DL heavy
1:9 ratio to UL heavy 3:2 ratio. (The DL allocations in these ratios include both
DL subframes and special subframes (which can also carry downlink transmissions in
DwPTS).) Therefore, compared to FDD, TDD systems have more flexibility in terms of
the proportion of resources assignable to uplink and downlink communications within
a given assignment of spectrum. Specifically, it is possible to distribute the radio
resources unevenly between uplink and downlink. This will provide a way to utilize
the radio resources more efficiently by selecting an appropriate UL/DL configuration
based on interference situation and different traffic characteristics in DL and UL.
[0028] Because the UL and DL transmissions are not continuous (
i.e., UL (or DL) transmissions do not occur in every subframe) in an LTE TDD system, the
scheduling and HARQ timing relationships are separately defined in the specifications.
Currently, the HARQ acknowledgement / negative acknowledgement (ACK/NACK) timing relationship
for downlink is shown in Table 2 below. Table 2 associates a UL sub-frame
n, which conveys ACK/NACK, with DL sub-frames
n-ki, i=0 to
M-1.
Table 2. Downlink association set index K:{k0,
k1, ...
km-1}
UL-DL Configuration |
Subframe n |
0 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
0 |
- |
- |
6 |
- |
4 |
- |
- |
6 |
- |
4 |
1 |
- |
- |
7, 6 |
4 |
- |
- |
- |
7, 6 |
4 |
- |
2 |
- |
- |
8, 7, 4, 6 |
- |
- |
- |
- |
8, 7, 4, 6 |
- |
- |
3 |
- |
- |
7, 6, 11 |
6,5 |
5, 4 |
- |
- |
- |
- |
- |
4 |
- |
- |
12, 8, 7, 11 |
6, 5, 4, 7 |
- |
- |
- |
- |
- |
- |
5 |
- |
- |
13, 12, 9, 8, 7, 5, 4, 11, 6 |
- |
|
- |
- |
- |
- |
- |
6 |
- |
- |
7 |
7 |
5 |
- |
- |
7 |
7 |
- |
The uplink HARQ ACK/NACK timing linkage is shown in Table 3 below. It indicates that
the Physical HARQ Indicator Control Channel (PHICH) ACK/NACK received in DL sub-frame
i is linked with the UL data transmission in UL sub-frame
i-k, k is given in Table 3. In addition, for UL/DL configuration 0, in sub-frames 0 and
5, when
IPHICH=1,
k=6. This is because there may be two ACK/NACKs for a UE transmitted on the PHICH in
subframes 0 and 5, one is represented by
IPHICH=1, the other is
IPHICH=0.
Table 1 k for HARQ ACK/NACK
TDD UL/DL Configuration |
subframe number i |
0 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
0 |
7 |
4 |
|
|
|
7 |
4 |
|
|
|
1 |
|
4 |
|
|
6 |
|
4 |
|
|
6 |
2 |
|
|
|
6 |
|
|
|
|
6 |
|
3 |
6 |
|
|
|
|
|
|
|
6 |
6 |
4 |
|
|
|
|
|
|
|
|
6 |
6 |
5 |
|
|
|
|
|
|
|
|
6 |
|
6 |
6 |
4 |
|
|
|
7 |
4 |
|
|
6 |
The UL grant, ACK/NACK and transmission/retransmission relationship is shown in Table
4. The UE shall upon detection of a Physical Downlink Control Channel (PDCCH) with
DCI format 0 and/or a PHICH transmission in sub-frame
n intended for the UE, adjust the corresponding PUSCH transmission in sub-frame
n+
k, where
k is given in Table 4. For TDD UL/DL configuration 0, if the least significant bit
(LSB) of the UL index in the DCI format 0 is set to 1 in sub-frame
n or a PHICH is received in sub-frame
n=0 or 5 in the resource corresponding to
IPHICH=1, or PHICH is received in sub-frame
n=1 or 6, the UE shall adjust the corresponding PUSCH transmission in sub-frame n+7.
If, for TDD UL/DL configuration 0, both the most significant bit (MSB) and LSB of
the UL index in the DCI format 0 are set in sub-frame
n, the UE shall adjust the corresponding PUSCH transmission in both sub-frames
n+ k and
n+
7, where
k is given in Table 4.
Table 4. k for PUSCH transmission
TDD UL/DL Configuration |
subframe number n |
0 |
1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
0 |
4 |
6 |
|
|
|
4 |
6 |
|
|
|
1 |
|
6 |
|
|
4 |
|
6 |
|
|
4 |
2 |
|
|
|
4 |
|
|
|
|
4 |
|
3 |
4 |
|
|
|
|
|
|
|
4 |
4 |
4 |
|
|
|
|
|
|
|
|
4 |
4 |
5 |
|
|
|
|
|
|
|
|
4 |
|
6 |
7 |
7 |
|
|
|
7 |
7 |
|
|
5 |
Both grant and HARQ timing linkage in TDD are much more complicated than the fixed
time linkages used in an LTE FDD system. It usually requires more attention in design.
Unlike in LTE FDD, the maximum numbers of DL and UL HARQ processes per serving cell
varies with the TDD UL/DL configuration. This is mainly because the DL and UL subframe
distribution is different for different UL/DL configurations. The maximum number of
downlink HARQ processes per serving cell shall be determined by the TDD UL/DL configuration,
as indicated in Table 5.
Table 5. Maximum number of DL HARQ processes for TDD
TDD UL/DL configuration |
Maximum number of HARQ processes |
0 |
4 |
1 |
7 |
2 |
10 |
3 |
9 |
4 |
12 |
5 |
15 |
6 |
6 |
For the uplink, the number of HARQ processes per serving cell shall be determined
by the DL/UL configuration, as indicated in the Table 6 below.
Table 6. Number of synchronous UL HARQ processes for TDD
TDD UL/DL configuration |
Number of HARQ processes for normal HARQ operation |
0 |
7 |
1 |
4 |
2 |
2 |
3 |
3 |
4 |
2 |
5 |
1 |
6 |
6 |
Whenever the UL/DL configuration is changed, the number of HARQ processes has to be
changed accordingly to match to the current configuration. This is true for both uplink
and downlink.
[0029] In the current LTE specification, the TDD UL/DL configuration is assumed to be fixed.
For certain deployment scenarios, such as Femto or Pico cell, the number of UEs per
cell is small and it means that the overall traffic ratio between UL and DL in the
cell may change rapidly. The fixed UL/DL configuration may lead to inefficient use
of system radio resource in this kind of traffic characteristics. There may also be
a need to dynamically change the TDD configuration from interference avoidance perspective.
Moreover, the faster UL/DL reconfiguration may lead to better performance even up
to 10ms in some scenarios. However, there may be issues on HARQ associated with the
TDD configuration change. It is mainly because the HARQ timing linkage varies with
different UL/DL configurations in LTE TDD systems.
[0030] As the UL/DL TDD configuration changes, some subframes in the frame will change direction,
such as from UL to DL and/or vice versa, from frame to frame. Therefore, there are
issues with both downlink and uplink HARQ ACK/NACK transmission. An example case for
a DL HARQ is provided in FIG. 5A, where there is a TDD UL/DL configuration change
from configuration 4 to configuration 5. FIG. 5A is an example schematic illustration
500 showing a DL HARQ case for configuration change from configuration 4 502 to configuration
5 504. For UL/DL configuration 4 502, which is for radio frame 1 506, the ACK/NACKs
for DL PDSCH transmission at subframes #6 510, #7 512, #8 514, and #9 516 are all
linked to the UL subframe #3 518 in radio frame 508. However, with the configuration
change, subframe #3 518 for UL/DL configuration #5 504 is a DL subframe. It cannot
be used to send ACK/NACK on the UL direction.
[0031] FIG. 5B is an example schematic illustration 530 showing a UL HARQ case for configuration
change from configuration 2 532 to configuration 1 534. For configuration 2 532 in
radio frame 1 536, the ACK/NACK for PUSCH at subframe #7 540 is supposed to transmitted
at DL subframe #3 542 of the radio frame 2 538. But the subframe #3 542 is no longer
a DL subframe with the change to TDD UL/DL configuration 1 534. As such, the UL ACK/NACK
cannot be transmitted on subframe #3 542. In the UL, the situation is more complicated
than the DL because the UL HARQ in LTE is synchronous. The PUSCH HARQ timing association
is considered, in addition to the transmission and retransmission grant timing linkage
during the TDD UL/DL configuration change. FIG. 5C is an example schematic illustration
560 showing UL HARQ case for configuration change from configuration 0 562 to configuration
2 564. For configuration 0 562, the ACK/NACK for PUSCH at subframe #2 570 is received
at subframe #6 572 of the radio frame 1 566. If it is a NACK, the PUSCH retransmission
needs to be happened at subframe #3 574 in the following radio frame 2 568. As the
change of TDD UL/DL configuration 0 562 to configuration 2 564 occurs, however, the
subframe #3 574 becomes DL subframe. It is not possible to perform the PUSCH retransmission
any more.
[0032] A change of TDD UL/DL configuration may lead to problems in both DL and UL HARQ timing
linkage. If the change of UL/DL configuration does not happen often, all of the on-going
HARQ processes may simply be terminated by declaring packet reception error and passing
the error onto the upper layer. However, this solution would cause increased delay
of traffic and decreased efficiency of radio resource usage. In 3GPP RAN1, the rate
of reconfiguration under discussion is in the range from 10ms to 640ms. With this
kind of change rate, it is not feasible to simply terminate the HARQ process every
time when there is a change of configuration.
[0033] Aspects of the present disclosure are directed to ensuring that both DL and UL HARQ
timing linkage do not break when the TDD UL/DL configuration is changed. Aspects of
the present disclosure are directed to ensuring the continuation of HARQ timing relationship
for both downlink and uplink HARQs during reconfiguration by, for example, limiting
the combination of TDD UL/DL configuration that can change from one to the other.
Aspects of the disclosure are directed to using PUSCH adaptive retransmission during
the UL/DL reconfiguration in addition to limiting the combination of TDD UL/DL configuration
combinations. In this way, the reconfiguration flexibility can increase without breaking
the HARQ timing both on downlink and uplink.
[0034] To streamline the TDD UL/DL configuration change, we have to make sure that the continuation
of HARQ timing relationship for both downlink and uplink HARQs when the system changes
the TDD UL/DL configuration from one to another.
[0035] For DL HARQ timing, every PDSCH transmission or retransmission should be properly
ACKed/NACKed after the TDD UL/DL configuration change. Basically, to minimize the
specification change, each PDSCH subframe follows the DL HARQ timing of the UL/DL
configuration where the DL subframe is transmitted. FIG. 6 is a configuration change
map 600 for DL HARQ timing consideration in accordance with the present disclosure.
The map 600 shows TDD UL/DL configuration combinations for reconfiguring TDD UL/DL
configuration. The greyed cells (such as cell 604) indicate the allowable change combination.
Cells with an X (such as cell 606) represent that the change is not allowed in terms
of DL HARQ timing consideration. For example, UL/DL configuration 0 is allowed to
change to any other configuration; while UL/DL configuration 1 cannot change to configuration
2 and 5. Blank cells (such as cell 608) represent null entries showing no change in
the configurations (i.e., configuration 0 to configuration 0, and so on).
[0036] FIG. 7 is a schematic illustration 700 showing an example of a DL HARQ timing linkage
transition during the TDD UL/DL configuration change from configuration 1 702 to configuration
6 704 in accordance to the present disclosure. As shown in FIG. 7, this UL/DL reconfiguration
does not cause problems in DL HARQ timing. For UL/DL configuration 1 702, which is
for radio frame 1 706, the ACK/NACKs for DL PDSCH transmission at subframes #5 710
and #6 712 are linked to the UL subframe #2 714 in radio frame 2 708, which has changed
to configuration 6 704. Similarly, the DL PDSCH transmission at subframe #9 716 is
linked to uplink subframe #3 718. The number of HARQ processes changes as the TDD
UL/DL configuration changes. For DL HARQ process, it is an asynchronous process and
each DL grant specifies the HARQ index number. When the number of HARQ processes changes
to a larger or the same number after reconfiguration, the current
n DL HARQ buffer(s) should be able to directly transfer to the first
n HARQ buffer(s) of the DL HARQ processes after reconfiguration. When the number of
HARQ processes changes to a smaller number due to reconfiguration, for example, as
shown in FIG. 7 where the number of DL HARQ processes is seven for configuration 1
and it is six for configuration 6, there are ways of addressing the issue. For example,
the new configuration may at least temporarily, keep the same number of HARQ buffers
as the previous configuration or may reduce the number of HARQ buffers to the same
as the current configuration suggests by allowing the excessive number of HARQ processes
to complete. The eNB may use a conservative modulation and coding scheme (MCS) to
send the PDSCH to make sure that the UE will receive it correctly and complete the
HARQ transmission before the UL/DL configuration change in order to make the number
of HARQ processes equal to the specified number after the change. The eNB may control
the number of HARQ processes to the specified number after the change by purposely
not scheduling new data transmission that could initiate a new HARQ process. The UE
may send an ACK regardless of the result of decoding right before the configuration
change to terminate the excessive number of HARQ processes. The packet error could
be passed onto the upper layer. Each above proposed schemes can be a standalone implementation.
[0037] In UL, the situation is more complex than the DL situation because of the synchronous
nature of UL HARQ in LTE. The PUSCH HARQ timing association may be considered as well
as the transmission and retransmission grant timing linkage during the TDD UL/DL configuration
change. Similar to the DL consideration, to minimize the specification change, each
PUSCH UL HARQ and grant (including retransmission grant) may follow the UL HARQ and
grant timing scheme of the UL/DL configuration where the UL transmission and UL grant
are transmitted. From the viewpoint of UL HARQ, a DL subframe has to be available
at the time when a UL HARQ needs to be transmitted with the change of TDD UL/DL configuration.
[0038] FIG. 8 is a configuration change map 800 for a UL HARQ and UL grant timing consideration
in accordance with the present disclosure. The greyed cells (such as cell 802) indicate
the reconfiguration pair allowed without breaking UL HARQ and retransmission timing.
The cells with an X (such as cell 806) represent that the change is not allowed. For
example, UL/DL configuration 0 is allowed to change to configuration 1; while UL/DL
configuration 1 cannot change to configuration 0. Blank cells (such as cell 806) represent
null entries showing no change in the configurations (i.e., configuration 0 to configuration
0, and so on). FIG. 9 is a schematic illustration showing an example of a UL HARQ
and retransmission timing during UL/DL configuration 0 902 in radio frame 1 906 change
to configuration 1 in radio frame 2 908 in accordance to the present disclosure. The
lines 910a-f are the ACK/NACK linkage, and the line 912 is retransmission timing.
Both UL HARQ and PUSCH retransmission timing linkage work during the transition period.
Also the subframe #5 914 in configuration 0 902 frame can deliver an UL grant following
the configuration 0 902 timing to schedule a PUSCH at subframe #2 916 after reconfiguration,
shown as line 918.
[0039] The number of UL HARQ processes also changes as the TDD UL/DL configuration changes.
For UL HARQ process, it is more difficult to handle the transition since it is a synchronous
process and the UL grant does not contains the HARQ index number. However, the UL
grant has one bit for new data indicator. Similar to DL case, when the number of HARQ
processes changes to a larger or the same number after reconfiguration, the current
n UL HARQ buffer(s) can directly transfer to the first
n HARQ buffer(s) of the UL HARQ processes after reconfiguration. Both eNB and UE should
know the mapping of HARQ number to subframe number.
[0040] The number of HARQ processes changes to a smaller number due to reconfiguration,
for example, in FIG. 9, the number of UL HARQ processes is seven for configuration
0 and it is four for configuration 1. This issue can be addressed in several ways.
For example, the UL HARQ buffer can be transferred to occupy all available UL HARQ
processes and temporarily store the remaining UL HARQ buffers in the same order in
a queue at both UE and eNB. The UL HARQ processes can be completed later when there
is an opportunity. When a current HARQ completes, the eNB can send an UL grant with
a negative new data indicator to UE. The UE can receive the grant with negative new
data indicator, and knows to restart the very first stored HARQ process in the queue.
The eNB may indicate a conservative MCS to UE to send PUSCH to make sure that eNB
will receive it correctly and complete the HARQ transmission before the UL/DL configuration
change in order to make the number of HARQ processes equal to the specified number
after the change. The eNB may control the number of UL HARQ processes to the specified
number after the change by purposely not granting new data initiating new UL HARQ
process. The eNB can send an ACK regardless of the result of decoding right before
the configuration change to terminate the excessive number of UL HARQ processes. The
packet error can be passed onto the upper layer. Each above proposed schemes can be
a standalone implementation, or two or more of the above proposed schemes may be used
together.
[0041] To put DL HARQ and UL HARQ and UL retransmission timing under consideration together,
FIG. 10 presents allowable configuration combinations. FIG. 10 is a configuration
change map 1000 for both DL and UL timing considerations in accordance with the present
disclosure. The map 1000 shows TDD UL/DL configuration combinations for reconfiguring
TDD UL/DL configuration. The greyed cells (such as cell 1002) indicate the allowable
change combinations. Cells with an X (such as cell 1004) represent that the change
is not allowed in terms of HARQ timing consideration. For example, UL/DL configuration
0 is allowed to change to configuration 1, 3, 4, and 6; while UL/DL configuration
1 cannot change to configuration 0, 2, 3, 5 and 6. Blank cells (such as cell 1006)
represent null entries showing no change in the configurations (i.e., configuration
0 to configuration 0, and so on).
[0042] FIG. 11 is a schematic illustration 1100 showing an example of a UL and DL timing
linkage transition during UL/DL configuration 4 1102 change to configuration 1 1104
in accordance to the present disclosure. The lines 1110 show the DL ACK/NACK linkage.
The lines 1112 are the UL ACK/NACK linkage, and the lines 1114 are the UL retransmission
timing.
[0043] FIG. 12 is a process flowchart 1200 for reconfiguring TDD UL/DL configuration. A
first TDD UL/DL configuration for a first radio frame can be identified (1202). That
is, a first radio frame is associated with a corresponding first TDD UL/DL configuration.
This association may occur at any time prior to the existence of the first radio frame.
It may be determined that the next radio frame will require a reconfiguring of the
TDD UL/DL configuration (1204). A second TDD UL/DL configuration can be identified
for the next (or second) radio frame, which is adjacent the first radio frame (1206).
The second TDD UL/DL configuration can be identified based, at least in part, on one
or more subframes of the second TDD UL/DL configuration that can communicate hybrid
automatic repeat request (HARQ) acknowledgement/negative acknowledgement (ACK/NACK)
indicators for corresponding subframes of the first TDD UL/DL configuration. The identification
of the second TDD UL/DL configuration can be based on a mapping of available configuration
combinations.
[0044] The second TDD UL/DL configuration may support a greater or equal number of HARQ
processes than the first TDD UL/DL configuration. In certain implementations, the
first TDD UL/DL configuration may support a greater number of HARQ processes than
the second TDD UL/DL configuration. In the second instance, the first TDD UL/DL configuration
may be associated with a first number of HARQ processes, and the first number of HARQ
processes may be maintained, at least temporarily, for the second TDD UL/DL configuration.
In certain aspects of the implementations, the second TDD UL/DL configuration may
be associated with a second number of HARQ buffers, and a second number of HARQ processes
associated with the first TDD UL/DL configuration may be executed. The second number
of HARQ processes may be equal to the second number of HARQ buffers. In certain aspects
of the implementations, a HARQ process for physical downlink/uplink shared channel
can be completed prior to reconfiguration from the first TDD UL/DL configuration to
the second TDD UL/DL configuration. In certain implementations, an ACK indicator can
be communicated prior to the reconfiguring of the TDD UL/DL configuration.
[0045] In certain implementations, the HARQ processes are uplink (UL) HARQ processes. In
that case, excess UL HARQ processes may be stored in a queue and upon receiving a
negative new data indicator, executing a first UL HARQ process of the UL HARQ processes
stored in the queue.
[0046] In certain aspects of the implementations, the second TDD UL/DL configuration includes
a corresponding subframe for communicating the ACK/NACK indicator. In certain aspects
of the implementations, identifying the second TDD UL/DL configuration includes identifying
a subset of TDD UL/DL configurations available for communicating an ACK/NACK indicator
for one or more subframes of the first TDD UL/DL configuration.
[0047] The restrictions on the reconfiguration combinations described above can be relaxed
by using adaptive retransmission with UL grant for PUSCH where the retransmission
timing linkage is broken during the TDD UL/DL configuration change. FIG. 13 is an
example schematic illustration 1300 showing PUSCH adaptive retransmission during reconfiguration
of UL/DL configuration 0 1302 to configuration 2 1304. According to the configuration
0 1302 timing, the ACK/NACK for PUSCH at subframe #2 1310 is received at subframe
#6 1312 of the first radio frame 1306. If it is a NACK, the PUSCH retransmission takes
place at subframe #3 1314 in the following radio frame (second radio frame 1308) (shown
as dotted arrow 1316). Because of the change of TDD UL/DL configuration to configuration
2 1304, however, the subframe #3 1314 becomes DL subframe. Instead of transmitting
NACK on PHICH at subframe #6 1312, the eNB can directly send a UL grant with negative
NDI (New Data Indicator) in DCI0/DCI4 on PDCCH at subframe #6 1312 for PUSCH retransmission
at subframe #2 1318 of the second radio frame 1304. The UL grant can be sent at the
same subframe for sending the NACK and UL grant rule applies.
[0048] The new data transmission or re-transmission is indicated by the NDI in the DCI0/DCI4
UL grant. When a UE decodes the DCI0/DCI4, if the NDI is negative, the UE knows that
the UL grant is for adaptive retransmission. The adaptive retransmission grant is
sent at the same subframe where the ACK/NACK was originally sent, so the UE has the
knowledge of which HARQ process it is related to. In this case, some of the restricted
reconfiguration combinations described above are now possible.
[0049] FIG. 14 is a configuration change map 1400 for UL HARQ and grant timing consideration
with adaptive PUSCH retransmission in accordance with the present disclosure. The
greyed cells (such as cell 1402) indicate the reconfiguration pair allowed without
breaking UL HARQ and retransmission timing. The cells with an X (such as cell 1404)
represent that the change is not allowed. For example, UL/DL configuration 0 is allowed
to change to configuration 1; while UL/DL configuration 1 cannot change to configuration
0. Blank cells (such as cell 1406) represent null entries showing no change in the
configurations (i.e., configuration 0 to configuration 0, and so on).
[0050] FIG. 15 is a configuration change map 1500 for both DL and UL timing considerations
with adaptive PUSCH retransmission in accordance with the present disclosure. The
greyed cells (such as cell 1602) indicate the reconfiguration pair allowed without
breaking UL HARQ and retransmission timing. The cells with an X (such as cell 1504)
represent that the change is not allowed. For example, UL/DL configuration 0 is allowed
to change to configuration 1; while UL/DL configuration 1 cannot change to configuration
0. Blank cells (such as cell 1506) represent null entries showing no change in the
configurations (i.e., configuration 0 to configuration 0, and so on).
[0051] FIG. 16 is a process flowchart 1600 of adaptive PUSCH retransmission. An eNB may
receive a physical uplink shared channel (PUSCH) (1602). It can be determined whether
the PUSCH was decoded correctly (1604). If the PUSCH is decoded correctly, an ACK
can be sent (1606). If the PUSCH was not decoded properly, it can be determined whether
a change in configuration is required (1608). If no change is required, then a NACK
can be sent (1610). If a change is required, then, the eNB can send a UL grant for
PUSCH retransmission based on a UL grant timing of the configuration associated with
the current radio frame. The second TDD UL/DL configuration may include a corresponding
subframe for communicating the ACK/NACK indicator. In certain aspects of the implementations,
identifying the second TDD UL/DL configuration may include identifying a subset of
TDD UL/DL configurations available for communicating an ACK/NACK indicator for one
or more subframes of the first TDD UL/DL configuration.
[0052] The issue of the number of HARQ processes can be addressed in the same way described
above. As mentioned previously, adaptive transmission permits more configuration combinations.
For example, PUSCH adaptive retransmission makes reconfiguration from UL/DL configuration
0 to configuration 2 and 5 possible. This availability of configuration combinations
is applicable when UL/DL traffic ratio has a significant change from uplink intense
(configuration 0) to downlink intense (configuration 2 and 5).
[0053] A number of embodiments of the invention have been described. Nevertheless, it will
be understood that various modifications may be made without departing from the scope
of the invention. Accordingly, other embodiments are within the scope of the following
claims.
[0054] The following are examples according to the present disclosure.
Numbered clause 1. A method of reconfiguring a time division duplex (TDD) uplink/downlink
(UL/DL) configuration, the method comprising:
identifying a first TDD UL/DL configuration for a first radio frame; and
identifying a second TDD UL/DL configuration for a second radio frame adjacent the
first radio frame, the second TDD UL/DL configuration identified based, at least in
part, on one or more subframes of the second TDD UL/DL configuration that can communicate
hybrid automatic repeat request (HARQ) acknowledgement/negative acknowledgement (ACK/NACK)
indicators for corresponding subframes of the first TDD UL/DL configuration.
Numbered clause 2. The method of numbered clause 1, wherein the second TDD UL/DL configuration
supports a number of HARQ processes greater than or equal to that of the first TDD
UL/DL configuration.
Numbered clause 3. The method of numbered clause 1, wherein the first TDD UL/DL configuration
supports a greater number of HARQ processes than the second TDD UL/DL configuration.
Numbered clause 4. The method of numbered clause 3, wherein the first TDD UL/DL configuration
is associated with a first number of HARQ processes, and the method further comprising
maintaining the first number of HARQ processes for the second TDD UL/DL configuration.
Numbered clause 5. The method of numbered clause 3, wherein the second TDD UL/DL configuration
is associated with a second number of HARQ buffers, and the method further comprising
executing a second number of HARQ processes associated with the first TDD UL/DL configuration,
the second number of HARQ processes equal to the second number of HARQ buffers.
Numbered clause 6. The method of numbered clause 3, further comprising completing
a HARQ process for physical downlink / uplink shared channel prior to reconfiguration
from the first TDD UL/DL configuration to the second TDD UL/DL configuration.
Numbered clause 7. The method of numbered clause 3, further comprising controlling
the number of HARQ processes for physical downlink /uplink shared channel prior to
reconfiguration from the first TDD UL/DL configuration to the second TDD UL/DL configuration.
Numbered clause 8. The method of numbered clause 3, further comprising communicating
an ACK indicator prior to the reconfiguring of the TDD UL/DL configuration.
Numbered clause 9. The method of numbered clause 3, wherein the HARQ processes are
uplink (UL) HARQ processes.
Numbered clause 10. The method of numbered clause 9, further comprising storing excess
UL HARQ processes in a queue and upon receiving a negative new data indicator, executing
a first UL HARQ process of the UL HARQ processes stored in the queue.
Numbered clause 11. The method of numbered clause 1, further comprising reconfiguring
the TDD UL/DL configuration for the second radio subframe based on the identified
second TDD UL/DL configuration.
Numbered clause 12. A method comprising:
identifying a first time division duplex (TDD) uplink/downlink (UL/DL) configuration
for a first radio frame;
determining that a hybrid automatic repeat request (HARQ) acknowledgement/negative
acknowledgement (ACK/NACK) indicator is to be transmitted on a second radio frame
adjacent the first radio frame; and
identifying a second TDD UL/DL configuration for the second radio frame based, at
least in part, on the TDD UL/DL configuration of the first radio frame.
Numbered clause 13. The method of numbered clause 12, wherein the second TDD UL/DL
configuration includes a corresponding subframe for communicating the ACK/NACK indicator.
Numbered clause 14. The method of numbered clause 12, wherein identifying the second
TDD UL/DL configuration comprises identifying a subset of TDD UL/DL configurations
available for communicating an ACK/NACK indicator for one or more subframes of the
first TDD UL/DL configuration.
Numbered clause 15. A method performed at a base station of a wireless communications
network, the method comprising:
receiving a physical uplink shared channel (PUSCH);
determining that the PUSCH was decoded incorrectly;
determining that a change in time division duplex TDD uplink/downlink UL/DL configuration
is required;
identifying a new TDD UL/DL configuration, the new TDD UL/DL configuration associated
with a new uplink (UL) timing; and
sending a UL grant for PUSCH retransmission based on a UL grant timing of a current
TDD UL/DL configuration.
Numbered clause 16. The method of numbered clause 15, wherein the UL grant is sent
using a downlink control information (DCI) message.
Numbered clause 17. The method of numbered clause 15, wherein sending the UL grant
for PUSCH retransmission further comprises sending a negative new data indicator.
Numbered clause 18. A network element of a wireless communications network, the network
element comprising:
a hardware processor operable when executed to perform instructions, the instructions
comprising:
receiving a physical uplink shared channel (PUSCH);
determining that the PUSCH was decoded incorrectly;
determining that a change in time division duplex TDD uplink/downlink UL/DL configuration
is required;
identifying a new TDD UL/DL configuration, the new TDD UL/DL configuration associated
with a new uplink (UL) timing; and
sending a UL grant for PUSCH retransmission based on a UL grant timing of a current
TDD UL/DL configuration.
Numbered clause 19. The network element of numbered clause 18, wherein the UL grant
is sent using a downlink control information (DCI) message.
Numbered clause 20. The network element of numbered clause 18, wherein sending the
UL grant for PUSCH retransmission further comprises sending a negative new data indicator.
Numbered clause 21. A network element of a wireless communications network, the network
element comprising:
a hardware processor operable when executed to perform instructions, the instructions
comprising:
identifying a first time division duplex (TDD) uplink/downlink (UL/DL) configuration
for a first radio frame;
determining that a hybrid automatic repeat request (HARQ) acknowledgement/negative
acknowledgement (ACK/NACK) indicator is to be transmitted on a second radio frame
adjacent the first radio frame; and
identifying a second TDD UL/DL configuration for the second radio frame based, at
least in part, on the TDD UL/DL configuration of the first radio frame.
Numbered clause 22. A network element of a wireless communications network, the network
element comprising:
a hardware processor operable when executed to perform instructions, the instructions
comprising:
identifying a first TDD UL/DL configuration for a first radio frame;
identifying a second TDD UL/DL configuration for a second radio frame adjacent the
first radio frame, the second TDD UL/DL configuration identified based, at least in
part, on one or more subframes of the second TDD UL/DL configuration that can communicate
hybrid automatic repeat request (HARQ) acknowledgement/negative acknowledgement (ACK/NACK)
indicators for corresponding subframes of the first TDD UL/DL configuration; and
reconfiguring the TDD UL/DL configuration for the second radio subframe based on the
identified second TDD UL/DL configuration.
1. A method (1200) of reconfiguring a time division duplex, TDD, uplink/downlink, UL/DL,
configuration, the method (1200) comprising:
identifying (1202) a first TDD UL/DL predetermined configuration for a first radio
frame; and
identifying (1206) a second TDD UL/DL predetermined configuration for a second radio
frame adjacent the first radio frame, the second TDD UL/DL predetermined configuration
identified based, at least in part, on one or more subframes of the second TDD UL/DL
predetermined configuration that can communicate hybrid automatic repeat request,
HARQ, acknowledgement/negative acknowledgement, ACK/ NACK, indicators for corresponding
subframes of the first TDD UL/DL predetermined configuration;
wherein the first radio frame and second radio frame each consist of one or more downlink
subframes, one or more uplink subframes and one or more special subframes.
2. The method of claim 1, wherein the second TDD UL/DL predetermined configuration supports
a number of HARQ processes greater than or equal to that of the first TDD UL/DL predetermined
configuration.
3. The method of claim 1, wherein the first TDD UL/DL predetermined configuration supports
a greater number of HARQ processes than the second TDD UL/DL predetermined configuration.
4. The method of claim 3, wherein the first TDD UL/DL predetermined configuration is
associated with a first number of HARQ processes, and the method further comprising
maintaining the first number of HARQ processes for the second TDD UL/DL predetermined
configuration.
5. The method of claim 3, wherein the second TDD UL/DL predetermined configuration is
associated with a second number of HARQ buffers, and the method further comprising
executing a second number of HARQ processes associated with the first TDD UL/DL predetermined
configuration, the second number of HARQ processes equal to the second number of HARQ
buffers.
6. The method of claim 3, further comprising completing a HARQ process for physical downlink
/ uplink shared channel prior to reconfiguration from the first TDD UL/DL predetermined
configuration to the second TDD UL/DL predetermined configuration.
7. The method of claim 3, further comprising controlling the number of HARQ processes
for physical downlink /uplink shared channel prior to reconfiguration from the first
TDD UL/DL predetermined configuration to the second TDD UL/DL predetermined configuration.
8. The method of claim 3, further comprising communicating an ACK indicator prior to
the reconfiguring of the TDD UL/DL predetermined configuration.
9. The method of claim 3, wherein the HARQ processes are uplink, UL, HARQ processes.
10. The method of claim 9, further comprising storing excess UL HARQ processes in a queue
and upon receiving a negative new data indicator, executing a first UL HARQ process
of the UL HARQ processes stored in the queue.
11. The method of claim 1, further comprising reconfiguring the TDD UL/DL predetermined
configuration for the second radio frame based on the identified second TDD UL/DL
predetermined configuration.
12. A network element of a wireless communications network, the network element comprising:
a hardware processor operable when executed to perform instructions, the instructions
comprising:
receiving (1602) a physical uplink shared channel, PUSCH;
determining (1604) that the PUSCH was decoded incorrectly;
determining (1608) that a change in the current time division duplex, TDD, uplink/downlink,
UL/DL predetermined configuration is required;
identifying a new TDD UL/DL predetermined configuration, the new TDD UL/DL predetermined
configuration associated with a new uplink, UL, timing; and
sending (1612) a UL grant for PUSCH retransmission based on a UL grant timing of a
current TDD UL/DL predetermined configuration;
wherein the current TDD UL/DL configuration and the new TDD UL/DL configuration each
comprise radio frames, each radio frame consisting of one or more downlink subframes,
one or more uplink subframes and one or more special subframes.
13. The network element of claim 12, wherein the UL grant is sent using a downlink control
information, DCI, message and/or sending the UL grant for PUSCH retransmission further
comprises sending a negative new data indicator.
1. Verfahren (1200) zum Rekonfigurieren einer TDD(time division duplex)-UL/DL(uplink/downlink)-Konfiguration,
wobei das Verfahren (1200) aufweist:
Identifizieren (1202) einer ersten vorgegebenen TDD-UL/DL-Konfiguration für einen
ersten Funkrahmen; und
Identifizieren (1206) einer zweiten vorgegebenen TDD-UL/DL-Konfiguration für einen
zweiten Funkrahmen angrenzend an den ersten Funkrahmen, wobei die zweite vorgegebene
TDD-UL/DL-Konfiguration basierend zumindest teilweise auf einem oder mehreren Teilrahmen
der zweiten vorgegebenen TDD-UL/DL-Konfiguration identifiziert wird, die HARQ(hybrid
automatic repeat request)-
ACK/NACK(acknowledgment/negative acknowledgment)-Indikatoren für entsprechende Teilrahmen
der ersten vorgegebenen TDD-UL/DL-Konfiguration kommunizieren kann;
wobei der erste Funkrahmen und der zweite Funkrahmen jeweils aus einem oder mehreren
Downlink-Teilrahmen, einem oder mehreren Uplink-Teilrahmen und einem oder mehreren
speziellen Teilrahmen bestehen.
2. Das Verfahren gemäß Anspruch 1, wobei die zweite vorgegebene TDD-UL/DL-Konfiguration
eine Anzahl von HARQ-Prozessen unterstützt, die größer oder gleich der der ersten
vorgegebenen TDD-UL/DL-Konfiguration ist.
3. Das Verfahren gemäß Anspruch 1, wobei die erste vorgegebene TDD-UL/DL-Konfiguration
eine größere Anzahl von HARQ-Prozessen unterstützt als die zweite vorgegebene TDD-UL/DL-Konfiguration.
4. Das Verfahren gemäß Anspruch 3, wobei die erste vorgegebene TDD-UL/DL-Konfiguration
mit einer ersten Anzahl von HARQ-Prozessen assoziiert ist und das Verfahren weiter
aufweist ein Beibehalten der ersten Anzahl von HARQ-Prozessen für die zweite vorgegebene
TDD-UL/DL-Konfiguration.
5. Das Verfahren gemäß Anspruch 3, wobei die zweite vorgegebene TDD-UL/DL-Konfiguration
mit einer zweiten Anzahl von HARQ-Puffern assoziiert ist und das Verfahren weiter
aufweist ein Ausführen einer zweiten Anzahl von HARQ-Prozessen, die mit der der ersten
vorgegebenen TDD-UL/DL-Konfiguration assoziiert sind, wobei die zweite Anzahl von
HARQ-Prozessen gleich der zweiten Anzahl von HARQ-Puffern ist.
6. Das Verfahren gemäß Anspruch 3, das weiter ein Abschließen eines HARQ-Prozesses für
einen physikalischen Downlink/Uplink-Gemeinschaftskanal vor der Rekonfiguration von
der ersten vorgegebenen TDD-UL/DL-Konfiguration zu der zweiten vorgegebenen TDD-UL/DL-Konfiguration
aufweist.
7. Das Verfahren gemäß Anspruch 3, das weiter ein Steuern der Anzahl von HARQ-Prozessen
für einen physikalischen Downlink/Uplink-Gemeinschaftskanal vor der Rekonfiguration
von der ersten vorgegebenen TDD-UL/DL-Konfiguration zu der zweiten vorgegebenen TDD-UL/DL-Konfiguration
aufweist.
8. Das Verfahren gemäß Anspruch 3, das weiter ein Kommunizieren eines ACK-Indikators
vor der Rekonfiguration der vorgegebenen TDD-UL/DL-Konfiguration aufweist.
9. Das Verfahren gemäß Anspruch 3, wobei die HARQ-Prozesse UL(Uplink)-HARQ-Prozesse sind.
10. Das Verfahren gemäß Anspruch 9, das weiter aufweist ein Speichern von überschüssigem
UL-HARQ-Prozessen in einer Warteschlange und, bei einem Empfangen eines negativen
neuen Datenindikators, Ausführen eines ersten UL-HARQ-Prozesses der UL-HARQ-Prozesse,
die in der Warteschlange gespeichert sind.
11. Das Verfahren gemäß Anspruch 1, das weiter aufweist ein Rekonfigurieren der vorgegebenen
TDD-UL/DL-Konfiguration für den zweiten Funkrahmen basierend auf der identifizierten
zweiten vorgegebenen TDD-UL/DL-Konfiguration.
12. Ein Netzwerkelement eines drahtlosen Kommunikationsnetzwerks, wobei das Netzwerkelement
aufweist:
einen Hardwareprozessor, der betriebsfähig ist, bei Ausführung, zum Durchführen von
Anweisungen, wobei die Anweisungen aufweisen: Empfangen (1602) eines PUSCH (physical
uplink shared channel); Bestimmen (1604), dass der PUSCH inkorrekt decodiert wurde;
Bestimmen (1608), dass eine Änderung der aktuellen vorgegebenen TDD(time division
duplex)-UL/DL(uplink/downlink)-Konfiguration erforderlich ist;
Identifizieren einer neuen vorgegebenen TDD-UL/DL-Konfiguration, wobei die neue vorgegebene
TDD-UL/DL-Konfiguration mit einem neuen UL(Uplink)-Timing assoziiert ist; und
Senden (1612) einer UL-Zuteilung für eine PUSCH-Neuübertragung basierend auf einem
UL-Zuteilungs-Timing einer aktuellen vorgegebenen TDD-UL/DL-Konfiguration;
wobei die aktuelle TDD-UL/DL-Konfiguration und die neue TDD-UL/DL-Konfiguration jeweils
Funkrahmen aufweisen, wobei jeder Funkrahmen aus einem oder mehreren Downlink-Teilrahmen,
einem oder mehreren Uplink-Teilrahmen und einem oder mehreren speziellen Teilrahmen
besteht.
13. Das Netzwerkelement gemäß Anspruch 12, wobei die UL-Zuteilung unter Verwendung einer
DCI(downlink control information)-Nachricht gesendet wird und/oder das Senden der
UL-Zuteilung für eine PUSCH-Neuübertragung weiter ein Senden eines negativen neuen
Datenindikators aufweist.
1. Procédé (1200) de reconfiguration d'une configuration de liaison montante/descendante,
UL/DL, pour un multiplexage par répartition dans le temps, TDD, le procédé (1200)
comprenant le fait
d'identifier (1202) une première configuration TDD UL/DL prédéterminée pour une première
trame radio ; et
d'identifier (1206) une deuxième configuration TDD UL/DL prédéterminée pour une deuxième
trame radio adjacente à la première trame radio, la deuxième configuration TDD UL/DL
prédéterminée étant identifiée en fonction, au moins en partie, d'une ou de plusieurs
sous-trames de la deuxième configuration TDD UL/DL prédéterminée qui peuvent communiquer
un indicateur d'accusé de réception/accusé de réception négatif, ACK/NACK, de demande
de répétition automatique hybride, HARQ, à des sous-trames correspondantes de la première
configuration TDD UL/DL prédéterminée ;
dans lequel la première trame radio et la deuxième trame radio sont constituées chacune
d'une ou de plusieurs sous-trames de liaison descendante, d'une ou de plusieurs sous-trames
de liaison montante et d'une ou de plusieurs sous-trames spéciales.
2. Procédé de la revendication 1, dans lequel la deuxième configuration TDD UL/DL prédéterminée
prend en charge un nombre de processus HARQ supérieur ou égal à celui de la première
configuration TDD UL/DL prédéterminée.
3. Procédé de la revendication 1, dans lequel la première configuration TDD UL/DL prédéterminée
prend en charge un nombre de processus HARQ supérieur à celui de la deuxième configuration
TDD UL/DL prédéterminée.
4. Procédé de la revendication 3, dans lequel la première configuration TDD UL/DL prédéterminée
est associée à un premier nombre de processus HARQ, et le procédé comprenant en outre
le maintien du premier nombre de processus HARQ pour la deuxième configuration TDD
UL/DL prédéterminée.
5. Procédé de la revendication 3, dans lequel la deuxième configuration TDD UL/DL prédéterminée
est associée à un deuxième nombre de tampons HARQ, et le procédé comprenant en outre
l'exécution d'un deuxième nombre de processus HARQ associé à la première configuration
TDD UL/DL prédéterminée, le deuxième nombre de processus HARQ étant égal au deuxième
nombre de tampons HARQ.
6. Procédé de la revendication 3, comprenant en outre l'achèvement d'un processus HARQ
pour un canal partagé de liaison descendante/liaison montante physique avant la reconfiguration
de la première configuration TDD UL/DL prédéterminée à la deuxième configuration TDD
UL/DL prédéterminée.
7. Procédé de la revendication 3, comprenant en outre la commande du nombre de processus
HARQ pour un canal partagé de liaison descendante/liaison montante physique avant
la reconfiguration de la première configuration TDD UL/DL prédéterminée à la deuxième
configuration TDD UL/DL prédéterminée.
8. Procédé de la revendication 3, comprenant en outre la communication d'un indicateur
ACK avant la reconfiguration de la configuration TDD UL/DL prédéterminée.
9. Procédé de la revendication 3, dans lequel les processus HARQ sont des processus HARQ
en liaison montante UL.
10. Procédé de la revendication 9, comprenant en outre le stockage des processus HARQ
en UL en excès dans une file d'attente et lors de la réception d'un nouvel indicateur
de données négatif, l'exécution d'un premier processus HARQ en UL des processus HARQ
en UL stockés dans la file d'attente.
11. Procédé de la revendication 1, comprenant en outre la reconfiguration de la configuration
TDD UL/DL prédéterminée pour la deuxième trame radio en fonction de la deuxième configuration
TDD UL/DL prédéterminée identifiée.
12. Élément de réseau d'un réseau de communication sans fil, l'élément de réseau comprenant
:
un processeur matériel pouvant fonctionner, lorsqu'il est exécuté, pour effectuer
des instructions, les instructions comprenant le fait :
de recevoir (1602) un canal partagé de liaison montante physique, PUSCH ;
de déterminer (1604) que le PUSCH a été décodé de manière incorrecte ;
de déterminer (1608) qu'un changement dans la configuration de liaison montante/descendante,
UL/DL, pour un multiplexage par répartition dans le temps, TDD, prédéterminée actuelle
est requis ;
d'identifier une nouvelle configuration TDD UL/DL prédéterminée, la nouvelle configuration
TDD UL/DL prédéterminée étant associée à une nouvelle synchronisation de liaison montante,
UL ; et
d'envoyer (1612) une allocation UL pour une retransmission PUSCH en fonction d'une
synchronisation d'allocation UL d'une configuration TDD UL/DL prédéterminée actuelle
;
dans lequel la configuration TDD UL/DL actuelle et la nouvelle configuration TDD UL/DL
comprennent chacune des trames radio, chaque trame radio est constituée d'une ou de
plusieurs sous-trames descendantes, d'une ou de plusieurs sous-trames montantes et
d'une ou de plusieurs sous-trames spéciales.
13. Élément de réseau de la revendication 12, dans lequel l'allocation UL est envoyée
en utilisant un message d'informations de commande de liaison descendante, DCI, et/ou
l'envoi de l'allocation UL pour une retransmission PUSCH comprend en outre l'envoi
d'un nouvel indicateur de données négatif.