[0001] The invention relates to a method of inserting a prefabricated pile into the ground,
in which a shaft is formed in the ground by introducing a steel sheath into the ground,
the prefabricated pile is slipped into the sheath and the sheath is removed from the
shaft whilst leaving the pile in the ground.
[0002] Such a method is known. In the known method there is a risk that after the removal
of the sheath the pile may subsequently sink too deeply into the ground due to lack
of ground resistance.
[0003] The invention has for its object to improve the support of the pile, whilst by means
of a comparatively light and readily maniable device the pile can be rapidly inserted
into the ground without the risk of destruction of the pile. In a method according
to the invention the ground beneath the pile is consolidated by pressing down the
pile, which sets off from the sheath to be held in the ground, the sheath being removed
from the ground not until has the consolidation been achieved.
[0004] The invention furthermore relates to and improves a device for inserting a prefabricated
pile into the ground by using the method in accordance with the invention, said device
comprising a tubular sheath and a displaceable guide frame having driving means for
introducing the sheath into the ground. This device is characterized by setting-off
means to be arranged between the pile and the sheath and by means for energizing said
setting-off means in order to press down the pile during consolidation of the ground
by setting off the pile against the sheath to be held in the ground and by means separated
from the setting-off means for withdrawing the sheath from the ground.
[0005] The invention provides furthermore a pile inserted into the ground by the method
according to the invention, said pile being characterized in that the pile is fixed
in place with respect to the pile foot without the interposition of concrete locally
shed in shaft by means of undeformable, interengaging contact surfaces between the
pile foot and the pile.
[0006] The above-mentioned and further features of the invention will be explained in the
following description with reference to drawings.
[0007] The drawings show schematically in
figures 1, 6, 10, 11 and 12 longitudinal sectional views of a sheath with a pile during
the consolidation of the ground located beneath the pile,
Figures 3, 4, 5 and 8 longitudinal sectional views of the lower end of the sheath
during the introduction thereof into the ground,
Figures 2, 7 and 9 longitudinal sectional views of the lower end of a pile inserted
into the ground by using the method shown in Figures 1, 6 and 8 respectively,
Figure 13 a plan view of a site during the insertion of piles into the ground,
Figure 14 on an enlarged scale a detail XIV of Figure 13,
Figure 15 a control-system for the device illustrated in Figure 14,
Figure 16 an enlarged sectional view taken on the line XVI-XVI in Figure 14,
Figure 17 an enlarged sectional view taken on the line XVII-XVII in Figure 16,
Figure 18 a side elevation of detail XVIII of Figure 13,
Figure 19 an elevational view in the direction of the arrow XIX in Figure 18,
Figure 20 on an enlarged scale detail XX of Figure 19,
Figure 21 a sectional view taken on the line XXI-XXI in Figure 20,
Figure 22 on an enlarged scale detail XXII of Figure 20,
Figure 23 an elevational view taken on the line XXIII-XXIII in Figure 22,
Figure 24 a control-diagram for detail XXII of Figure 20,
Figure 25 a variant of Figure 19,
Figure 26 on an enlarged scale detail XXVI of Figure 25,
Figure 27 on an enlarged scale detail XXVII of Figure 26,
Figure 28 a control-diagram of detail XXVII,
Figures-29 and 30 a working plot of the control-diagram of Figure 28,
Figure 31 a variant of detail XXVII of Figure 26,
Figure 32 a variant of the device of Figure 19, and
Figures 33, 34, 35, 36 and 37 diagrams of the successive stages of movement during
the operation of the device of Figure 32.
[0008] By the method according to the invention a prefabricated pile 1, for example, of
reinforced concrete is inserted into the ground 4. As shown in Figures 1 and 2 a shaft
5 is formed in the ground 4 by introducing a steel sheath 3 into the ground 4. First
a pile 1 with an integral, conical pile foot 2 is inserted at the ground surface into
the sheath 2. Subsequently the sheath 3 together with the pile insered into it is
introduced in some way or other into the ground 4, after which the ground 29 beneath
the pile 1 is consolidated by pressing down the pile 1 set off from the sheath 3 to
be held in the ground 4, which can be performed by means of a hydraulic cylinder 96,
the piston 97 of which excrts pressure on the head 135 of the pile 1, whilst the cylinder
96 is firmly secured to the sheath 3 by means of bolts 136. During this consolidation
of the ground 29 the cylinder 96 and hence the sheath 3 are subjected to a weight
G, for example, a ballast weight and/or the weight of a device for introducing the
sheath 3 into the ground 4. Not until has the ground 29 been additionally consolidated
in the manner described above, the sheath 3 is withdrawn from the shaft 5, whilst
leaving the pile 1 in the ground 4. During the introduction of the sheath 3 into the
ground 4 the pile foot 2 and the sheath 3 - safeguarded against relative rotation
- are preferably coupled with one another by coupling means 6. This permits of exerting
on the sheath 3 a torsional moment, which is transferred to the pile foot 2 without
the pile 1 itself being subjected to torsional forces. The coupling means 6 may be
formed by projecting steel wedges 7 embedded in the pile 1 at the foot 2, which snap
into matching cavities 8 of the sheath 3, which are open on the bottom side. When
the sheath 3 is removed, the shaft 5 is filled by earth or, if necessary, it is filled
out from above with earth, concrete or similar filling material. The sheath 3 can
be introduced by exerting a downwardly directed pressure, whilst it is simultaneously
rotated in a reciprocatory manner.
[0009] Preferably a pile 1 shown in Figures 1 and 2 is introduced into the ground 4 by screwing
it together with the sheath 3 into the ground 4, the sheath 3 being pressed down and
rotated. Preferably the sheath 3 is provided throughout its length (see Figure 1)
or only at the lower end (see Figure 3) with a screw 12 by which the sheath 3 is also
screwed back upwardly, whilst the pile 1 is left in the ground 4. The pile 1 of Figure
4 has a screw 13 integral with the pile foot 2 having a pitch z, which is equal to
the pitch y of the screw 12.
[0010] In the method illustrated in Figures 5, 6 and 7 first a sheath 3 without a pile 1
but together with a pile foot 2, for example, of steel is screwed into the ground
4 (Figure 5). Subsequently the pile 1 with a cylindrical extension 14 is lowered in
the sheath 3, the extension 14 penetrating into a matching cavity 15 of the pile foot
2. In this way the pile 1 is fixed in place with respect to the pile foot 2 without
the interposition of concrete in the shaft 5 by means of undeformable contact surfaces
of the extension 14 and the cavity 15 interengaging between the pile foot 2 and the
pile 1. If desired, the extension 14 may be coated previously with a glue, cement
or a similar solid adhesive layer.
[0011] In the method illustrated in Figure 8 a shaft 5 is formed by screwing a sheath 3
with its open end into the ground 4 and by removing the earth 25 penetrating into
the sheath 3 upwardly out of the sheath 3, for example, by means of a rotating driven
worm conveyor 16 thus having an excavating effect. Subsequently the pile 1 with a
pile foot 2 rigidly connected with the pile above_the ground or preferably formed
integrally with the pile is lowered in the sheath 3. After an additional consolidation
of the ground 29 the sheath 3 is pulled upwards.
[0012] In the method shown in Figure 10 the sheath 3 with a pile 1 arranged therein is screwed
into the ground 29, whilst the pile foot 2 is secured to the lower end of the sheath
3 by means of screw bolts 137 having a predetermined common tensile strength. In order
to additionally consolidate the ground 29 the pile 1 is compressed by means of the
hydraulic cylinder 96, which is firmly secured to the top end of the sheath 3. When
the screw bolts 137, which together const tute a shear joint, break down, the pile
1 is compressed to a predetermined extent. When the joint breaks down, the pile 1
blows down on the ground 29, which is thus additionally consolidated, whilst the pile
head 135 sets off against the sheath 3. The set-off is improved by the inertia of
the sheath 3 and any weight bearing on the same.
[0013] Instead of using the method shown in Figure 10 an alternative may be employed though
not with preference, in which the pile foot 2 is not connected with the lower end
of the sheath 3 and the hydraulic cylinder 96 is connected by shear bolts 138 with
the top end of the sheath 3 (see Figure 11). For consolidating the ground 29, the
pile 1 is compressed, whilst its top end sets off against the sheath 3 screwed into
the ground 4 to an extent predetermined by the strength of the shear bolts 138, at
which extent the set-off from the sheath 3 is abruptly eliminated. Then the pile 1
leaps upwards, setting off from the ground 29, which is thus additionally consolidated.
[0014] In the method illustrated in Figure 12 the ground 29 is first additionally consolidated
with a constant pressure by a small cylinder 143, to which fluid is fed from a pump
139 through an opened valve 140 and a central feeding tube 145 passed through a large
cylinder 144. The piston 146 engages the steel, tubular pile 1 by way of a cap 147.
The cap 147 is connected with the cylinder 143 by means of slack tensile springs 148.
The small cylinder 143 is rigidly secured to the large cylinder 144, a differential
piston 149 of which around the feeding tube 145 also extends into the small cylinder
143. The chamber 150 of the cylinder 144 communicates through a rotary gland 152,
a spacious feeding duct 151 and a valve 141 with a pressure vessel 142, which is pressurized
through a freely movable piston 153 with fluid from a pump 154. After the ground 29
has first been consolidated by a given constant load resulting from pressure in the
small cylinder 143 and after a predetermined pressure has been built up in the pressure
vessel 142 and measured by a manometer 155, a pawl 157 is removed by means of a lever
156, as a result of which the valve 141 is abruptly opened, since its flap 158 is
blown away by the air against the slack spring 159. Then the large cylinder 144 exerts
a pressure shock via the pile 1 on the ground 29, the pile setting again off from
the sheath 3 screwed into the ground 4. The cylinder 144 is welded to a ring 57, which
is fastened to a screw wheel 66 by which the helical movement of the sheath 3 is obtained.
Above the ground 4, around the sheath 3, a funnel 160 is arranged for receiving earth
161 when the sheath 3 is screwed into the ground 4 with a higher speed than is required
for screwing the sheath 3 into the ground 4 in relation to the pitch of the helix
12. The helix 12 then operates as a worm conveyor, which transports loose earth into
the funnel 160. When the sheath 3 is screwed out of the ground 4, the loose earth
flows from the funnel 160 back towards the helix 12, which conveys it back into the
ground 4.
[0015] Referring to Figures 13 to 23 the piles 1 are inserted into the ground 4 at the locations
30 with the aid of a screwing tool 31 provided with the Ieans shown in Figure 12.
[0016] From a pile store 32 a lifting implement 36 deposits each pile 1 on a sequence of
rollers 33 of a pile inserting device 34. A sheath 3 being located in line on stationary
supports 35 of the pile inserting device 34, the pile 1 is slipped in a lying state
into the sheath 3 with the aid of a driving carriage 37, which by means of a control-member
38 sets control-slides 39 in a position in which the hydraulic cylinder 40 supporting
each time a roller 33 is lowered for allowing a pile foot 2 integral with the-pile
1 to pass. When the pile foot 2 hits the lower end of the sheath 3, the pile 1 is
clamped tight to the sheath 3 by means of the clamping device 41 of Figures 12, 16
and 17. The clamping device 41 comprises three wedges 42, each of which is drawn by
means of a hydraulic cylinder 43 into a clamping position and pushed out of said clamping
position by springs 44, when the cylinders 43 are de-energized, each wedge being then
conducted away from the pile 1 by means of an elongated member 46 fastened to the
wedge along a pin 45 of a sliding guide 47. The sheath 3 with the pile 1 slipped into
and clamped tight in it is deposited by means of the lifting carriage 36 on a carriage-48,
conveyed to the locations 30 and lifted by means of hoisting cables 49 from the screwing
implement 31 into a vertical position and disposed along a stay frame 50 having rails
51, the sheath 3 being inserted into a support 52, which is passed by guide members
53 along the rails 51. During the insertion lugs 54 of the sheath 3 are passed through
recesses 56 of a ring 57, which can be rotated by means of a hydraulic cylinder 55
and which is firmly held by clamps 58 on the above-mentioned helical wheel 66 rotatable
in a bearing 162 Qf the annular support 52, whilst a lower ring 60 of the sheath 3
bears on the helical -wheel 66. During the insertion of the sheath 3 into the ground
4 by screwing the vertical speed of the sheath 3 is related to the rotational speed
thereof in accordance with the pitches y and z of the helices 12 and 13 on the sheath
3 and/or the pile foot 2 respectively (see Figure 24).
[0017] An electric motor 59 drives a gear wheel 61 with high power along a vertical toothed
rack 62, whilst a further electric motor 63 actuates the rotation of said helical
wheel 66 through a helical wheel 64. The speed of the electric motor 63 and hence
the rotational speed of the sheath 3 is measured by means of a speedometer 67, whereas
the speed of the motor 59 and hence the vertical speed of the sheath 3 is measured
by means of a speedometer 68. The speedometers 67 and 68 apply a signal 69 and 70
respectively to a comparator 71 and 72 respectively both being adjusted by a common
setting member 65 and each controlling a control-member 73 and 74 respectively for
governing the electric motors 63 and 59 respectively. The power of the motors 63 and
59 is so high that the vertical load on the sheath 3 overcomes the sum of the sheath
friction and the resistance of the pile foot. By means of the screwing implement 31
described above the sheath 3 is screwed into the ground 4 in a continuous advancing
movement.
[0018] The screwing implement 31 shown in Figures 25 to 27 comprises a hydraulic worm device
76 having two clamps 77T and 77R engaging the sheath 3, each of which is provided
with a hydraulic cylinder 78T and 78R respectively for energizing the clamping jaws
79T and 79R respectively, which engage the sheath 3. The clamps 77T and 77R are vertically
displaceable with respect to a turntable 89 by means of hydraulic cylinders 81T and
81R respectively. Referring to Figure 28 an electric motor 82 drives the identical
pumps 85T, 85R and 86 through a driving gear 83 and a common driving shaft 84. By
way of a hydraulic motor 87 and a pinion 88 the pump 86 drives the turntable 89, which
is journalled in the frame 80 so as to be rotatable about a vertical axis 90. Furthermore
an electric motor 94 drives a pump 93 for energizing the hydraulic cylinders 78T and
78R. Each pump 85T, 86, 85R and 93 is provided with a control-slide 91T, 92, 91R and
95 respectively, each of which is attracted towards the relay concerned by the energization
of the relays 101 to 114.
[0019] In Figures 29 and 30 the energization diagrams of the relays are plotted versus time
t by shaded beams for screwing the sheath 3 into the ground 4 and withdrawing the
same respectively. The pumps, hydraulic cylinders, motor 87 and pinion 88 are proportioned
so that the vertical rate of the sheath 3 hydraulically coupled with the rotational
speed of the sheath 3 corresponds to the pitch y and/or z.
[0020] Figure 31 shows a different clamp 77, each hydraulic cylinder 81 being linked to
a chain 98, which is stretched by means of a hydraulic cylinder 78 setting off from
the other hydraulic cylinder 81.
[0021] The screwing implement 31 of Figure 32 differs from the screwing implements 31 described
above in that it comprises a boom 120 adapted to pivot upwards about a shaft 99 by
means of a hoisting cable 100, said boom having two clamps 121, each of which comprises
a stationary clamping jaw 122 and two pivotable clamping jaws 123.
[0022] Referring to Figure 33 the empty sheath 3 is replaced by the pivotal movement of
the clamps 121 in the direction of the arrow 124 about the boom 120 by a sheath 3
filled with a pile 1. When it is fixed in place in front of the stay frame 50 in the
screwing device (not shown) of the screwing implement 31, the sheath 3 of Figure 34
is disengaged by the clamping jaw 123 pivoting in the direction of the arrow 125,
after which, as shown in Figure 35, the boom 120 swings down in the direction of the
arrow 126, whilst in addition the clamps 121 turn in the direction of the arrow 127.
[0023] Referring to Figure 36, the empty sheath 3 is deposited on a carriage 128, whilst
a sheath 3 filled with a pile 1 is removed therefrom by a pivotal movement of the
clamping jaws 123 in the direction of the arrows 129 and 130 respectively, after which
the boom 120 is again lifted in the direction of the arrow-131 and turned in the direction
of the arrow 132 against an empty sheath 3 shown in Figure 37, when it is screwed
out of the ground 4. Then the next cycle of Figure 33 starts. In this method the time
of replacement of an empty sheath 3 by a filled one is very short. Thus the high power
and the means required thereto for screwing the sheath 3 into and out of the ground
4 within a short time can be utilized effectively.
1. A method of inserting a prefabricated pile into the ground, in which a shaft is
formed in the ground by introducing a steel sheath into the ground, the prefabricated
pile is slipped into the sheath and the sheath is removed from the shaft whilst leaving
the pile in the ground, characterized in that the ground beneath the pile is consolidated
by pressing down the pile, which sets off from the sheath to be held in the ground
and in that not until has the consolidation been achieved the sheath is removed from
the ground.
2. A method as claimed in claim 1, characterized in that during the consolidation
of the ground, whilst the pile is setting off against the sheath, said sheath is loaded
by weight.
3. A method as claimed in claim 1 or 2, characterized in that during the consolidation
of the ground the pile is compressed, whilst its top end is setting off against the
sheath screwed into the ground, up to a predetermined extent, at which setting off
against the sheath is abruptly eliminated.
4. A method as claimed in claim 1, 2 or 3, characterized in that the pile foot is
connected by means of an interruptible joint with the sheath and is introduced simultaneously
with the sheath into the ground and in that the ground beneath the pile is consolidated
by breaking said interruptible joint not until has the pile setting off against the
sheath been compressed to a predetermined extent.
5. A method as claimed in claim 1 or 2, characterized in that during the consolidation
of the ground the pile is set off from the sheath by pressing means producing a short
pressure shock.
6. A method as claimed in anyone of the preceding claims, characterized in that the
sheath is screwed into the ground.
7. A method as claimed in anyone of the preceding claims, characterized in that the
pile with a pile foot rigidly connected herewith is inserted into the sheath above
the ground surface and in that the sheath together with the pile held therein is introduced
into the ground.
8. A method as claimed in claim 7, characterized in that the pile is inserted into
the sheath held in a recumbent position-9. A method as claimed in anyone of claims
1 to 6, characterized in that with respect to the pile foot the pile is fixed in place
without the interposition of concrete locally shed in the sheath by means of undeformable,
interengaging contact surfaces between the pile foot and the pile.
10. A method as claimed in anyone of the preceding claims, characterized in that the
sheath is screwed into the ground by a substantially continuously advancing movement.
11. A device for inserting a prefabricated pile into the ground by using a method
as claimed in anyone of the preceding claims, said device comprising a tubular sheath
and a displaceable guide frame having driving means for introducing the sheath into
the ground, characterized by setting-off means to be arranged between the pile and
the sheath and by means for energizing said setting-off means in order to press down
the pile during consolidation of the ground by setting off the pile against the sheath
to be held in the ground and by means separated from the setting-off means for withdrawing
the sheath from the ground.
12. A device as claimed in claim 11, characterized by a pile inserting device for
slipping a pile into a sheath being in a recumbent position.
13. A device as claimed in claim 11 or 12, characterized by driving means which drive
the sheath in a continuously advancing movement.
14. A pile inserted into the ground by the method claimed in claim 9, characterized
in that the pile is fixed in place with respect to the pile foot without the interposition
of concrete locally shed in shaft by means of undeformable, interengaging contact
surfaces between the pile foot and the pile.
15. A pile characterized by a pile foot with coupling means for a disengageable linkage
to a sheath.
16. A pile as claimed in claim 15, characterized in that the coupling includes a connection
which can be broken at a predetermined load.