[0001] This invention relates to the recovery of particulate material from an enclosure.
In particular but not exclusively it relates to an abrasive blasting cabinet or room
wherein the abrasive is conveyed from the enclosure after use in order to be cleaned
and reused.
[0002] Abrasive blasting systems are well known which comprise an enclosure in which articles
are subjected to surface treatment by abrasive particles with means to recover and
clean the spent abrasive so that it can be re-circulated for use again. Blasting systems
which provide these operations are described in British Patent No. 934,088 wherein
the abrasive used falls through a fl.oor comprising a plurality of hopper-like pockets
and empties through apertures from the pockets into ducts which are situated in rows
between the hopper-like pockets.
[0003] In order to afford the operator proper visibility inside the enclosure, ventilation
is provided by the entry of air through baffled apertures in the roof. The air is
then drawn downwards through the hopper apertures, spaced substantially evenly over
the entire floor area. The ventilation air also provides the necessary air streams
that carry the used abrasive and debris out of the room through the aforementioned
ducts.
[0004] The enclosure described in British Patent No. 934,088, by using a plurality of small
hoppers, has a small overall floor thickness compared, for instance, with a single-hopper
enclosure. As a result the enclosure can be placed directly on a factory floor, requiring
only a shallow ramp for access, or may alternatively be installed in a shallow recess.
However, the floor construction is a complicated arrangement of parts assembled together
to provide both the hoppers and the conveying ducts.
[0005] The present invention provides a greatly improved floor construction for the pneumatic
recovery of particulate material, in which substantially the entire under-floor area
serves as the conveying ducting for removal of the particulate material. The overall
thickness of the floor including the ducting is thereby reduced to a minimum. The
floor construction is considerably simplified and the manufacturing costs reduced,
compared with, for example, the floor construction described in British Patent No.
934,088.
[0006] It is preferred that the conveying ducts have a progressively increasing cross section
in the direction of flow of air and particulate material. This is to maintain a reasonably
uniform air velocity as more air enters the duct through the floor apertures. However
a floor with a constant duct section and thus an increasing duct velocity can still
give satisfactory performance, at least in small enclosures.
[0007] According to the present invention, an apertured floor plate is spaced above a base
plate and the intervening space forms a pneumatic conveying duct; the apertures are
determined in size and number to allow a controlled quantity of air to enter the duct
and so spaced that, should the complete floor be covered with particulate material,
the piles of material within the duct will not unduly restrict the flow of air through
the duct.
[0008] The floor construction may comprise a floor plate which is loose or attached by screws
or bolts and can be easily removed so that complete access is obtained to the duct
system, e.g. for maintenance.
[0009] The conveying ducting may for example be divided into sections by baffles extending
between upper and lower floor plates, for ease of installation. The orifices controlling
the flow of air and particulate material from the enclosure do not have to be of variable
size_or pitching in order to provide a substantially even downdraft over the room
area, or substantially uniform duct velocity.
[0010] Although the invention will be discussed in connection with blast enclosures, it
can also apply to other types of rooms requiring substantially uniform downdraft and
the removal of particles. In the case of blast enclosures, the simplicity and compactness
of the recent construction is such that it can be applied to small blast cabinets,
thus enabling them to be placed directly on to a table or bench by the elimination
of a hopper or support legs.
[0011] The accompanying drawings show, by way of example only, embodiments of the invention:
in the drawings:-
Figure 1 is a longitudinal section through one version of the floor of an abrasive
blasting enclosure on the line A-A of Figure 3,
Figure 2 is a cross section through the floor on the line B-B of Figure 3,
Figure 3 is a plan view of the floor with the air entry baffles removed,
Figure 4 is a longitudinal section through an alternative floor construction,
Figure`5 is a section through a further version of the floor of an abrasive blasting
enclosure, on the line C-C of Figure 7.
Figure 6 is a section through the said floor on the line D-D of Figure 7.
Figure 7 is a plan view of the floor on the line E-E of Figure 5.
Figure 8 is a section through the floor, on the line F-F of Figure 7, and
Figure 9 shows an alternative detail of the floor plate.
[0012] Figures 1 - 3 show an enclosure 1, with a roof provided with air entries (not shown)
walls 2, and a stepped base plate 3 which can conveniently rest on a factory floor
or bench. An outlet duct 4 is connected to a fan or similar means (not shown) for
creating an air flow 5 along and from the duct. This in turn results in an air flow
into the enclosure through the roof, the air flowing vertically downwards as indicated
by arrows 6.
[0013] The operating floor of the enclosure is a floor plate 7, mounted on a secondary floor
plate, 8, spaced above the base plate 3, and in the case of a blast room where the
operator enters the enclosure, the floor plate 7 provides the working area on which
the operator stands. In the case of a blast cabinet which is operated from outside,
the floor plate 7 is the cabinet work floor on which components are placed for processing.
[0014] The spacing of the floor plate assembly 7 and 8 above the base plate 3 forms a conveying
duct 9, for the removal of air and abrasive from the enclosure 1 into the outlet duct
4. The distance between the secondary floor plate 8 and the base plate 3 is determined
by the volume of air being recovered and the air velocity necessary to convey the
abrasive particulate material along the conveying duct 9.
[0015] It is also necessary that the conveying velocity in the duct 9 be substantially constant.
Too low a velocity will result in abrasive lying in the duct, while too high a velocity
will result in unnecessary wear and excessive resistance to flow, requiring an excessively
large fan motor.
[0016] The floor assembly 7 and 8 is supported on longitudinal supports 10 which also ensure
a seal along the side of each floor section to enclose the duct 9. The longitudinal
supports also provide attachment for the base plate 3 which is manufactured for convenience
in a series of overlapping steps.
[0017] Air drawn from the outlet duct 4 enters the conveying duct 9 through two paths. A
large proportion, for example one-third, of this flow enters through the entry aperture
11, the remainder being drawn through the perforations 12 in the secondary floor plate
8. The perforation size and spacing is such that the air entering results in a constant
velocity beneath the plate 8, as the conveying duct height increases, for example
from the entry height 13 to the outlet height 14.
[0018] Theoretically, owing to the increasing depression in the conveying duct from its
entry aperture to its outlet, a greater number of perforations are required per unit
area of floor adjacent to the entry compared with the area adjacent to the outlet
in order to provide a uniform increase in air flow as the duct height increases. Alternatively,
if the spacing is constant, the perforations may be variable in size, decreasing towards
the duct outlet. In practice however, it has been found that a uniform pattern of
perforations over the entire floor area will provide a substantially uniform velocity
in the conveying duct beneath the floor sufficient for the recovery of abrasive after
use.
[0019] A convenient practical way to increase the duct height is by forming the base plate
3 in a series of overlapping steps 3a, 3b, etc. Thus a step can be provided wherever
the duct velocity has increased to an excessively high figure, and arranged so as
to reduce the velocity to that just sufficient to convey the abrasive.
[0020] By varying the length of each step in the direction of the air flow, compensation
can be made for the variation in air flow entering a uniform pattern of perforations.
This can be achieved by the use of longer steps at the entry end and decreasing in
length towards the outlet.
[0021] As an example of the very shallow thickness of floor that results from such a system,
the outlet height 14 can be as little as 30 mm for an abrasive blasting room 3m. along
the duct length.
[0022] Should the floor area be fully covered with abrasive the abrasive will collect in
the conveying duct 9 in the form of piles 15 (Figure 2) determined by the angle of
repose of the material. It is essential therefore, that the spacing of the perforations
12 relative to the outlet height 14, be wide enough so that the piles of abrasive
do not restrict the flow of air excessively. This is normally achieved if not more
than approximately 50% of the duct area is restricted, viewed in the direction of
the air flow.
[0023] It has been found that a wide spacing between the perforations for example 60 mm
does not result in a build up of abrasive on the floor plate 7. During operation the
movement of the abrasive by richochet after impact, an d by disturbance due to the
blast noznle air flow, causes it to travel over the floor plate and enter the perforations
very rapidly after discharge from the nozzle.
[0024] However, to improve the collection of the abrasive media scattered over the floor
area, the floor plate 7 which carries any loads within the cabinet or room is provided
with large orifices 16, while the secondary plate 8 has perforations 12 whose function
is to meter the air and abrasive flow in to the duct 9. As an example, the floor plate
7 may be 10 mm thick with 25 mm orifices while the secondary plate may be 3 mm thick
with 5mm perforations to provide hopper-like entries spaced over the floor area.
[0025] Provided that the entry aperture 11 is free of any restriction which may occur, for
example, owing to a sudden loading of abrasive onto the floor, the conveying duct
9 will be evactuated of all abrasive entering the perforations. This freedom from
obstruction is achieved by baffling the entry aperture by means of a generally vertical
edge plate 17 protected by a cover plate 18.
[0026] As an alternative to the use of stepped plates 3a, 3b, etc., to form the base plate,
Figure 4 shows a single inclined plate 19, whjch can be welded between the longitudinal
supports 10. Such a system provides a more uniform velocity from the entry end 20
to the outlet end 21, while the avoidance of steps results in a reduced resistance
to flow.
[0027] The inclination of the plate 19 can be constant which will result in some variation
if the perforations 12 are regular, although in practice such variation is acceptable.
Alternatively the inclination can vary, being shallow at the entry end and steepening
towards the outlet as more air enters the perforations.
[0028] Figures 5 - 8 shows a further version of the invention where the floor plate and
base plate are parallel, comprising an enclosure 22 with a roof provided with air
entries (not shown), walls 23, and a base plate 24. An outlet duct 25 is con nected
to a fan or similar means (not shown) for creating an air flow 26 along and from the
duct. This in turn results in an air flow into the enclosure through the roof, the
air flowing vertically downwards as indicated by arrows 27.
[0029] The operating floor of the enclosure is a floor plate 28 spaced above the base plate
24 and as previously described, in the case of a blast room where the operator enters
the enclosure, the floor plate 28, provides the working area on which the operator
stands. In the case of a blast cabinet which is operated from outside, the floor plate
28 is the cabinet work floor on which components are placed for processing.
[0030] The spacing of the floor plate 28 above the base plate 24 forms a conveying duct
29, for the removal of air and abrasive from the enclosure 22 into the outlet duct
25. The distance between the floor plate 28 and base plate 24 is determined as previously
stated by the volume of air being recovered and the air velocity necessary to convey
the abrasive particulate material along the conveying duct 29. It is also necessary
that the conveying velocity in the duct 29 be substantially constant.
[0031] The floor plate 28 is supported around all its closed edges b y side supports 30
and end supports 31 to ensure a seal around the floor edge. The plate is further supported
by inlet splitter plates 32 and outlet splitter plates 33, which also assist in uniform
. distribution of the air flow through the conveying duct 29 into outlet duct 25.
[0032] The control of the flow beneath the floor plate 28, in order to maintain a substantially
uniform velocity, is achieved by the provision of duct wall plates 34.
[0033] The outgoing air flow 26 results in a flow from the enclosure 22, through the floor
plate 28. A large proportion, for example one-third, of this flow enters through entry
apertures 35 and 36, the remainder being drawn through the perforations 37 in the
floor plate 28. The perforation size and spacing is such that the air entering results
in a constant velocity beneath the plate 28, as the conveying duct width increases,
for example from the entry aperture 35, to the outlet aperture 38.
[0034] Should the floor area be fully covered with abrasive the abrasive will collect in
the conveying duct 29, in the form of piles 39 (Figure 8) determined by the angle
of repose of the material. It is essential therefore, that the spacing of the perforations
37 be wide enough so that the piles of abrasive do not restrict the flow of air excessively.
This is normally achieved if not more than 50 % of the duct area is restricted, viewed
in the direction of the air flow.
[0035] - As previously stated, it has been found that a wide spacing between the perforations
does not result in a build up of abrasive on the floor plate 28. During operation
the movement of the abrasive by richochet after impact, and by disturbance due to
the blast nozzle air flow, causes it to travel over the floor plate and enter the
perforations very rapidly after discharge from the nozzle. However, improvements may
be effected by the addition of an upper floor plate (not shown) with large orifices,
in a similar manner to that described for the system in Figures 1 - 3.
[0036] As a general rule, the end 40 of the duct wall plate 13 will be so positioned that
the width of the duct 29 at the entry aperture 35, is approximately one-third of the
width at the outlet aperture 38. The other end of the duct wall plate will be approximately
mid-way between the side support 30 (or splitter plate 32), and the splitter plate
33. For clarity, the paths taken by the air flow are indicated by arrows in Figures
5 - 8.
[0037] Provided that the entry apertures 35 are free of any restriction which may occur,
for example, owing to a sudden loading of abrasive onto the floor, the conveying duct
29 will be evacuated of all abrasive entering the perforations. This freedom from
obstruction is achieved by baffling the entry aperture by means of a vertical surround
42, protected by a cover plate 43.
[0038] A modification to the floor plate 8 or 28, in any of the systems, to reduce the amount
of horizontal flat surface between the perforations 12 or 37 is shown in Figure 9.
In this the plate around the perforations is slightly dished to provide a conical
entry 44. It is then necessary for the perforations to be spaced clear of any support
or splitter plates beneath the floor plate 7. Such a modification would, of course,
eliminate the need for the upper floor plate 7.
[0039] Many minor variations may be made without departing from the principle of the invention,
namely a recovery floor system using the entire floor area as the recovery duct in
order to keep the overall thickness to a minimum. For instance, the perforations may
be of variable size and spaced irregularly to provide a completely uniform air flow
over the floor area in the conveying duct. The perforations may also be shaped in
cross section, for example a conical entry section may be provided to reduce the air
entry loss and attenuate the noise created by the air entering the orifices.. Although
the outlet duct 4 or 25 is shown connected across the floor duct outlets and would,
therefore, increase in cross sectional area towards the recovery fan or similar means,
the floor outlets may be connected by means of a fishtail either running horizontally
or vertically into a single duct.
1. A pneumatic recovery floor structure for particulate material comprising an apertured
floor plate (7, 8; 28) spaced above a baseplate (3; 19; 24), the intervening space
between the floor plate and base plate forming pneumatic conveying ducting (9; 29)
over substantially the entire floor area.
2. A floor structure as claimed in claim 1 in which the apertures (12, 16; 37) in
the floor plate (7, 8; 28) are determined in size and number to allow a controlled
quantity of air to enter the ducting (9; 29) and so spaced that should the complete
floor be covered with particulate material, the piles of material within the ducting
will not unduly restrict the flow of air through the ducting.
3. A floor structure as claimed in claim 1 or 2 in which the baseplate (3) is formed
in a series of steps (3, 3a, 3b) to increase the effective duct area in the direction
of flow and thus maintain a generally constant air velocity in the ducting (9).
4. A floor structure as claimed in claim 3 in which the spacing between steps decreases
in the direction of flow.
5. A floor structure as claimed in claim 1 or 2 in which the baseplate (19) is inclined
from the horizontal to increase the effective duct area in the direction of flow and
thus maintain a generally constant air velocity in the ducting (9).
6. A floor structure as claimed in claim 5 in which the inclination of the baseplate
increases in the direction of flow.
7. A floor structure as claimed in claim 1 or 2 in which the apertured floor plate
(28) and the baseplate (24) are parallel, with splitter plates (32,33, 34) positioned
to define at least one pneumatic conveying duct (29) of increasing area from the inlet
(35) to the outlet (36).
8. A floor structure as claimed in any of claims 1 to 5 in which the spacing of the
apertures (12, 16, 37) in the flow plate (7, 8, 28) increases towards the ducting
outlet end to provide a uniform air flow over the floor area and uniform rate of entry
along the length of the ducting (9; 29).
9. A floor structure as claimed in any of claims 1 to 6 in which , the size of the
apertures (12, 16, 37) in the floor plate (7, 8; 28) decreases towards the ducting
outlet end to provide a uniform air flow over the floor area and uniform rate of entry
along the length of the ducting (9; 29).
10. A floor structure as claimed in any of claims 1 to 7 in which the apertured floor
plate comprises more than one plate (7, 8), with the size of the apertures (12, 16)
in the plates (7,8) decreasing downwards to provide a hopper-like entry to the ducting
(9; 29).
11. A floor structure as claimed in any of claims 1 to 7 in which the apertured floor
plate (8; 28) has apertures (12; 37) which are dished or similarly formed to provide