[0001] In mining, primarily in coal mines, the desired material is extracted from deposits
which may often extend as layers of varying thickness. In coal mines, the thickness
of the layers often ranges from 0.5 to 2 m, and the layers are situated below sedimentary
material. When the deposits, for instance the layers of coal, are located near the
ground surface, open pit mines are used where large excavators remove the overlying
masses in order to make the deposits accessible. At greater depths, underground mining
is used and the material is then conveyed up to the ground surface in different ways.
Current hoisting methods include transportation on trucks or belt conveyors in inclined
galleries, mine hoists, large vertical shafts with special elevators (e.g. according
to Bulk Solids Handling, vol. 2, No. 3, September 1982 or FR-A-1,335,036). All of
these hoisting systems are very expensive because e.g. shafts and galleries of very
substantial cross-sectional areas must be used. This means that they must be located
at certain places and are difficult to move from one place to another. For this reason,
one will gradually have very long distances of underground transportation if deep
mining is used.
[0002] FR-A-1,267,586 discloses a bucket elevator for lowering material from one gallery
to another, the buckets of the elevator running in large shafts and function as speed-
determining elements for the downward conveyance to a container for intermediate storage.
[0003] One object of the present invention is to provide a more cost effective and readily
displaceable hoisting installation which not only reduces costs in connection with
underground mining but also makes it possible to obviate some of the current mining
at small depths in open pit mines which are most harmful to the environment.
[0004] The invention is based on the understanding that it is possible to use, as hoisting
shafts, lined boreholes of a relatively small diameter which when substantially filled
by the elevator of the hoisting installation, will both guide the elevator and, to
a considerable extent, prevent the elevator from dropping material during the hoisting
operation, whereby the elevator can be driven at high hoisting speeds.
[0005] According to the invention, these objects are achieved by the provision of a hoisting
installation which is characterised in that the shaft of the installation consists
of a lined circular borehole. When using bucket elevators, the greatest advantages
of the invention are gained if the installation has two circular boreholes disposed
side by side and serving as shafts, one for the ascending run of the elevator and
the other for the descending run of the elevator, each borehole being lined and the
cross-section of each borehole being substantially filled by the descending and ascending
runs, respectively, of the elevator. Alternatively, use may be made of a single borehole,
in which case, at least for small depths, use may be made of a screw conveyor as elevator
and, in case a bucket elevator is used, the two runs of the elevator are designed
so as substantially to fill each one half of the cross-section of the borehole. This
embodiment with a bucket elevator in one borehole is not as advantageous since for
the same hoisting capacity it is necessary to make larger and, hence, more expensive
boreholes and it may also prove difficult to prevent one run of the elevator from
interfering with the other run during transport.
[0006] The present invention will entail a dramatic reduction of installation costs as compared
with current hoisting installations. Especially if two shafts are used for a bucket
elevator or if a screw conveyor is used as elevator, the shaft diameter can be kept
so small, often in the range 400-700 mm, that it is possible to use the technique,
developed e.g. in connection with oil prospecting, which consists in drilling holes
and lining them with steel pipes. Since this technique is well known and relatively
inexpensive as compared with making large shafts of a cross-sectional dimension of
for instance 6 m, i.e. the shaft dimensions which are at present considered necessary
for ensuring rational hoisting with current technique, it is possible at relatively
low costs to move the hoisting installation so as to avoid underground transportation
over long distances.
[0007] By forming the shafts as boreholes of a relatively small diameter, the thickness
of the lining may be relatively small since lining tubes of a small thickness have
reduced tendency to buckling at small diameters.
[0008] Normal capacity requirements for a coal mine may be 300-600 tons per hour, which
may be easily achieved in shafts having a diameter of 400-700 mm, if use is made of
one shaft with a screw conveyor or of one shaft for the ascending run and another
shaft for the descending run of a bucket elevator or an undulated side wall belt conveyor.
The hoisting distances in coal mines often range from 50 to 200 m. If present-day
hoisting installations were to be used, considerations would often have been made
towards using open pit mining for hoisting depths of 50 m or slightly deeper, since
the known hoisting installations are very expensive. Using the present invention makes
it economic to conduct underground mining even at as small depths as 20-50 m since
it is possible, at a relatively low cost, to make new shafts near the underground
mining site, thus always keeping the underground transports short. Deserted shafts
may be used for instance for ventilation purposes.
[0009] An additional advantage of a hoisting installation according to the present invention
is that the shafts of an abandoned mine will be essentially easier to close and conceal,
whereby the risks of open large shafts of deserted mines are eliminated.
[0010] A number of embodiments of the invention will be described in greater detail hereinbelow
with reference to the accompanying drawings, in which
Fig. 1 is a schematic section of a preferred embodiment of the hoisting installation
according to the invention;
Fig. 2 is a section taken along the line II-II in Fig. 1;
Fig. 3, on a larger scale, shows a preferred embodiment of a filling pocket in the
installation according to Fig. 1;
Fig. 4 is a schematic vertical section of a portion of a shaft in the installation
according to Fig. 1;
Fig. 5 is a section taken along the line V-V in Fig. 4;
Fig. 6 is a schematic vertical section of a portion of another embodiment of the shaft
and the elevator in the installation according to Fig. 1;
Fig. 7 is a section taken along the line VII-VII in Fig. 6;
Fig. 8 is a schematic vertical section of a further embodiment of the installation
in Fig. 1;
Fig. 9 is a section taken along the line IX-IX in Fig. 8;
Fig. 10 is a schematic vertical section of another embodiment of the hoisting installation
according to the invention;
Fig. 11 is h schematic vertical section of a portion of the shaft in the installation according
to Fig. 10 ;
Fig. 12 is a section taken along the line XII-XII in Fig. ll;
Fig. 13 is a cross-section of a tubular casing which has a central partition and is
usable in the embodiment according to Fig. 10;
Fig. 14 shows part of a cross-section of another tubular casing which is usable in
the installation according to Fig. 10, and
Fig. 15 schematically shows yet another embodiment of the invention.
[0011] The embodiments of the installation according to the invention shown in Figs. 1-9
and 15 are preferred because one may here use lined boreholes having a diameter of
e.g. 400-700 mm, as compared with considerably larger boreholes in the embodiments
of Figs. 10-14, if it is desirable to maintain the same hoisting capacity.
[0012] The installation shown in Figs. 1 and 2 comprises two lined boreholes 10, 11 which
are spaced by a distance which corresponds to the diameter of a drive and guide pulley
13 over which a bucket elevator 14 extends. The upper guide pulley 13 is rotatably
carried by a frame 15 and driven by a motor 16 over a gear 17 and a shaft 18 mounted
in bearings 19. The descending run 20 of the bucket elevator 14 passes through a discharge
station 21 having a collecting funnel 22 from which the material is supplied to a
conveyor belt 23. At the lower end of the lined borehole 10, the descending run 20
of the elevator passes as a hanging bow 24 which is preferably guided by a guide 25
so as to enter into a loading pocket 26 whose tubular inlet portion 27 encloses the
ascending run 28 of the elevator. The loading station thus comprises this loading
pocket 26 and a conveyor belt 29 which empties the material in the pocket 26. In order
to optimise the loading operation while minimising the escape of material, the tubular
inlet portion 27 of the loading pocket is preferably made of a resilient material,
for instance a rubber sheet, so that this tube can resiliently engage and enclose
the ascending run 28 and the buckets 30 of the elevator. The length of the tubular
portion 27 is preferably greater than the distance between two successive buckets
30, whereby no material will escape through the tubular inlet portion 27.
[0013] In Figs. 4 and 5, there is shown a preferred embodiment of the elevator in the installation
according to Fig. 1. This figure shows the shaft 11 and its tubular casing 32, but
not the surrounding rock. The elevator thus has a traction belt 31 in the form of
a reinforced rubber conveyor belt to which substantially cylindrical buckets 30 have
been anchored by means of fixing elements 33. The buckets 30 are disposed at such
a relative distance that the loading operation in the loading pocket becomes relatively
simple. The advantage of this embodiment of the bucket elevator according to the invention
is that the buckets 30, preferably consisting of steel, will substantially completely
fill the cross-section of the lining tube 32, such that the buckets will be guided
by this tube and practically no material will escape over the upper rim of the buckets.
[0014] In Figs. 6 and 7, there is shown another embodiment of an elevator for the installation
in Fig. 1, In this case, the traction belt 31 has been replaced by a traction wire
34 to which the buckets 35 have been clamped by means of an upper and a lower attachment
36 and 37, respectively. Here, only the upper attachment need be solidly anchored
to the wire, preferably the steel wire 34.
[0015] In Figs. 8 and 9, there is shown a further embodiment of an elevator for the installation
in Fig. 1. In this instance, use is made of a so-called undulated side wall belt conveyor
which comprises a rubber conveyor belt 38 to which a number of pockets 39 of a flexibel
rubber material are fixed. The pockets are mounted between undulated side walls 40
which are connected to the edges of the long sides of the belt 38. By the provision
of these undulated side walls 40, the conveyor can pass over the upper guide pulley
13 and the lower guide 25.
[0016] As mentioned above, the embodiment of Figs. 1 and 2 is the preferred one since it
is here possible to use fairly small boreholes while maintaining sufficient hoisting
capacity. The embodiment in Fig. 10 requires boreholes of larger diameters, if the
same hoisting capacity is to be maintained. Since larger boreholes are more expensive
to make, some of the advantages of the installation will be lost by such an arrangement.
[0017] The embodiment of Fig. 10 thus comprises a lined borehole 50 with a lining tube 51.
The installation further comprises an upper guide pulley 52 which is mounted in substantially
the same manner as the guide pulley 13 in the embodiment according to Figs. 1 and
2. The installation also has a discharge station with a discharge hood 54 directing
the goods towards a conveyor belt 55. In order to join the two runs of the conveyor
or elevator 53, there is provided a guide 56 below the guide pulley 52. At the lower
end of the elevator, there is either a guide pulley or guiding device 57 in the form
of a number of small rollers which are arranged on a frame. This guide or guide pulley
directs the elevator up towards a loading station 58 which is supplied with material
by'means of a conveyor 59.
[0018] As appears from Figs. 11 and 12, the elevator 53 is in the form of a bucket elevator
with substantially semicircular buckets 60 which are attached to a reinforced conveyor
belt 61 by means of suitable fixing elements
62.
[0019] In order to improve the guiding of the ascending and descending runs of the elevator
with respect to each other, the tubular casing or lining tube 51 may have a longitudinal
partition 63 (Fig. 13) or a guide 64 in the form of a longitudinal rail (Fig. 14).
In some cases, it is possible to use only one such longitudinal rail while in other
cases it may be advantageous to use two diametrically opposed rails.
[0020] In Fig. 15 there is shown an embodiment which is preferred for small hoisting depths,
e.g. 20-60 m. In the installation, use is made of a screw conveyor 70 as hoisting
elevator in a lined borehole 71. The lining tube 72 of the borehole then serves as
a support and guide for the tubular casing 73 of the screw conveyor. The tubular casing
73, in which intermediate bearings for the screw have been provided in a per se known
way, extends down into the gallery and carries a feeder 74 which feeds the material,
e.g. coal, into the screw conveyor. At the top of the screw conveyor, there is provided
a drive motor 75 and a transition housing 76 which conducts the extracted material
to another conveyor 77, for instance a screw or belt conveyor. With a screw conveyor
of a diameter of e.g. 40-60 cm, it is possible to obtain hoisting capacities of 400-1,000
tons per hour, if high quality feeders are used. For depths exceeding 60 m, the power
requirement for a screw conveyor is becoming so considerable that the bucket elevator
alternative with two boreholes may prove more economic.
1. A hoisting installation in mining having a shaft (10, 11, 50, 71) for an elevator
(14, 53, 70) substantially filling the shaft, characterised in that the shaft (10,
11, 50, 71) of the installation consists of a lined circular borehole.
2. Installation as claimed in claim 1, in which the installation comprises two shafts
(10, 11) disposed side by side, one for the ascending run (28) of the elevator and
the other for the descending run (20) of the elevator, the cross-section of each shaft
beinq essentially filled by the descending and ascending runs, respectively, of the
elevator, characterised in that each of said sharts consists of a lined circular borehole.
3. Installation as claimed in claim 2, characterised in that the elevator (14, 53)
has a traction wire (34) or a traction belt (31, 36, 61) and buckets (32, 35, 39)
which are carried by said wire or belt and each of which substantially fills the cross-section
of each borehole.
4. Installation as claimed in claim 2, characterised in that the elevator (14) consists
of a undulated side wall belt conveyor (53) which is equipped with bucket-forming
pockets (39) and whose cross-section substantially fills the cross-section of each
borehole (10, 11).
5. Installation as claimed in claim 1, characterised in that the installation has
one circular borehole (50) and that the cross-section of the borehole is substantially
filled, half by the ascending run of the elevator (53), half by the descending run
of the elevator.
6. Installation as claimed in claim 5, characterised in that the elevator (53) is
a bucket elevator in which the buckets (60) have a substantially semicircular cross-section.
7. Installation as claimed in claim 5 or 6, characterised in that the lined borehole
(50) has a longitudinal partition (63) or guide rail (64) for guiding the ascending
and descending runs of the elevator (53) with respect to each other,
8. Installation as claimed in any one of claims 1-7, characterised in that the ascending
run (28) of the elevator (14) is passed through a loading pocket (26) with a tubular
elevator inlet channel (27) having walls resiliently engaging the elevator and being
of a length exceeding the distance between two successive buckets (30).
9. Installation as claimed in claim 2, 3, 4 or 8, characterised in that the two boreholes
(10, 11) are spaced from each other by a distance which is substantially equal to
the diameter of an upper guide or drive pulley (13) over which the elevator (14) is
passed.
10. Installation as claimed in claim 1, characterised in that the elevator (70) is
a screw conveyor, the lining tube (72) of the borehole (71) preferably serving as
a support and guide for the tubular casing (73) of the screw conveyor.