| (19) |
 |
|
(11) |
EP 0 301 735 B1 |
| (12) |
EUROPEAN PATENT SPECIFICATION |
| (45) |
Mention of the grant of the patent: |
|
31.03.1993 Bulletin 1993/13 |
| (22) |
Date of filing: 15.07.1988 |
|
| (51) |
International Patent Classification (IPC)5: F42B 8/28 |
|
| (54) |
Practice sea mine
Übungsseemine
Mine marine d'exercice
|
| (84) |
Designated Contracting States: |
|
DE FR GB IT |
| (30) |
Priority: |
25.07.1987 GB 8717693
|
| (43) |
Date of publication of application: |
|
01.02.1989 Bulletin 1989/05 |
| (73) |
Proprietor: BRITISH AEROSPACE PUBLIC LIMITED COMPANY |
|
Farnborough,
Hants. GU14 6YU (GB) |
|
| (72) |
Inventor: |
|
- Addison, Edward
BRITISH AEROSPACE P.L.C.
Hampshire Road
Weynouth
Dorset DT4 9TZ (GB)
|
| (74) |
Representative: Eastmond, John et al |
|
British Aerospace plc
Corporate Intellectual Property Department
Park East, PO Box 87, Farnborough Aerospace Centre Farnborough, Hants GU14 6YU Farnborough, Hants GU14 6YU (GB) |
| (56) |
References cited: :
DE-A- 2 714 545 FR-A- 2 364 425
|
DE-U- 8 710 874 US-A- 3 086 464
|
|
| |
|
|
|
|
| |
|
| Note: Within nine months from the publication of the mention of the grant of the European
patent, any person may give notice to the European Patent Office of opposition to
the European patent
granted. Notice of opposition shall be filed in a written reasoned statement. It shall
not be deemed to
have been filed until the opposition fee has been paid. (Art. 99(1) European Patent
Convention).
|
[0001] The present invention relates to a practice sea mine.
[0002] Presently, real mine cases filled with an inert substance, e.g. sand/cement, instead
of explosive, are used as practice mines (see e.g. US-A-3,086,464). These may be deployed
from a submarine or ship or are sometimes deployed from an aircraft. As real mine
cases are costly items an effort is made to recover these which in itself is a costly
operation and the recovery rate is low. Real mine cases clutter up the sea bed and
can cause damage to fishermen's nets.
[0003] The use of biodegradable materials for the casing of a practice missile has been
proposed in FR 2,364,425.
[0004] The present invention consists of a practice mine comprising a body shell containing
an inert substance, characterised in that the body shell is provided with an internal
tubular member sealed at one end by a removable plug for allowing passage of water
on deployment of the mine, and in that both the body shell and tubular member are
fabricated from material which decomposes on exposure to water.
[0005] Preferably, the mine is designed to degrade within a predetermined time period after
deployment, for example, between one and six months. The mine may comprise means for
initiating degradation on deployment such as a lanyard and pull-off patch.
[0006] Preferably, the body structure of the mine is made from wood, e.g. plywood and the
inert filler may be a soluble cement/plaster mix.
[0007] Particular embodiments of the present invention will now be described, by way of
example, with reference to the accompanying drawings, in which:-
Figure 1 is a view in longitudinal cross section of a practice sea mine according
to the present invention;
Figure 2 is a view in transverse cross section of a second embodiment of the present
invention;
Figure 3 is a view in transverse cross section of a third embodiment of the present
invention.
[0008] Referring to Figure 1, a practice sea mine is indicated generally at 10 and comprises
a tubular casing 12 made from plywood (14/15 laminations) which is formed from two
vacuum moulded halves jointed and bound and fastened with low water resistant glues.
A central tube 14 of spun cardboard extends almost the entire length of the casing
12. The casing 12 is filled with a hydrodegradeable concrete/plaster mix indicated
at 16. An annular plywood block end cap 18 provides a filling access aperture 19 and
bolted thereto is a nose piece 20 which may be a metal mine nose piece or may be made
from hydrodegradeable material. At the other end of the casing 12 a block 22 of cardboard
material is inserted to adjust the centre of gravity of the mine 10 and a plywood
block end cap 24 abuts the end wall of the casing 10 to which a tail piece 26, of
metal or of wood for example, is attached. A lanyard 28 is attached to a pull-off
patch 30 initially sealing the end of the central tube 14. A top lug 32 is provided
for keying the mine 10 in the launch tube of a submarine.
[0009] The length of the practice mine 10 is approximately 2.5 metres, its weight approximately
800-900kg. and it simulates the shape of a specific real mine.
[0010] In use, the practice mine 10 may be deployed from a submarine or an aircraft and
is arranged so that, on deployment, the lanyard 28 is tugged to release the pull-off
patch 30 (simulating weapon arming) thus allowing water to enter the central tube
14 to initiate degradation.
[0011] Initially, the central tube 14 is degraded, then the concrete/plaster mix 16 and
finally the casing 12. It is envisaged that the mine 10 will be designed so as to
degrade almost totally within between one and six months on the sea bed.
[0012] The practice mine described above simulates a real mine whilst being fabricated of
low cost materials using low cost production techniques. The mine can be suitably
coated to help prevent unwanted external degradation prior to deployment and/or to
provide a realistic sonar image for mine hunting practice. The practice mine is structurally
sufficiently strong to withstand transport and deployment, even from an aircraft,
but degrades to a required standard during a predetermined time after deployment.
[0013] An alternative configuration is shown in Figure 2 which shows a practice mine 50
which is generally the same in external appearance as the mine 10 of Figure 1. Internally,
the mine 50 comprises a plywood casing 51 containing seven tubes 52-58 of soft plywood
which may be filled with sand sausages vacuum packed in polythene. Runners 60-65 which
are triangular in cross section are positioned around the periphery of the mine casing
51 to maintain the tubes 52-58 in position. Six softwood poles are positioned around
the central tube 58 as shown.
[0014] The tubes 52-58, runners 60-65 and poles are strapped together and glued with water
soluble glue prior to fitting of the casing 51. This embodiment has the advantage
of being structurally relatively strong and furthermore the tubes 52-58 provide several
passages to allow water to circulate the start dissolving glue and initiating the
degradation process.
[0015] A further alternative is illustrated in Figure 3 in which a practice mine 80 comprises
an outer casing 82 of plywood and three laminated, soft plywood struts 84, 86 and
88 defining a cruciform structure. The struts 84, 86 and 88 extend along the length
of the casing 82 and are held in place relative to the casing 82 by channelled wooden
runners 90-93. Quarter pieces 94-97 of softwood are glued in place as shown.
[0016] The struts 84, 86 and 88 are apertured as indicated at 98 to allow keying of a filling
100 e.g. a salt and plaster mix.
[0017] This embodiment has the advantage that the struts 84, 86 and 88 lend extra strength
in all three dimensions to the mine 80 and in that load spreading is achieved by the
keying of the filling 100 through the apertures 98 in the struts 84, 86 and 88.
[0018] Another possible construction would be to fabricate the mine casing in the form of
a barrel with interlocking stays held by hoops e.g. of aluminium alloy.
[0019] It is envisaged that very many hydrodegradeable materials could be chosen for incorporation
in a practice mine according to the present invention including corrodable materials
such as Swedish Iron, Aluminium, Magnesium, bi-metal combinations giving cathodic
effects, sodium etc. All sorts of fillings might be used such as soluble salts, salt
and plaster mixes, clay and gravel mixes, salt and sand mixes etc. Organic materials
for attracting marine organisms to consume them may be used and it is also envisaged
that the practice mine may incorporate biological organisms or materials such an enzymes
to ensure degradation.
1. A practice sea mine (10) comprising a body shell (12) containing an inert substance
(16), characterised in that the body shell (12) is provided with an internal tubular
member (14) sealed at one end by a removable plug (30) for allowing passage of water
on deployment of the mine (10) and in that both the body shell (12) and tubular member
(14) are fabricated from material which decomposes on exposure to water.
2. A practice mine (10) according to claim 1 having a lanyard (28) attached to the removable
plug (30) for facilitating removal of the plug (30) on deployment of the mine (10).
3. A practice mine (10) as claimed in claim 1 or claim 2 in which the body shell (12)
is fabricated from plywood.
4. A practice mine (10) as claimed in claim 1 or claim 2 in which the body shell (12)
is fabricated from a metal which corrodes on exposure to sea-water.
5. A practice mine (10) as claimed in any preceding claim in which the internal tubular
member (14) is fabricated from spun cardboard.
6. A practice mine (10) as claimed in any of claims 1 to 4 in which the body shell (12)
is provided with a plurality of tubular members (52-58), each tubular member being
fabricated from soft plywood.
1. Übungsseemine (10), die einen Hüllkörper (12), angefüllt mit einer inerten Substanz
(16), aufweist, dadurch gekennzeichnet, daß der Hüllkörper (12) mit einem inneren
Rohr (14) versehen ist, das an einem Ende durch einen entfernbaren Stopfen (30) verschließbar
ist, um den Durchtritt von Wasser beim Aussetzen der Mine (10) zu ermöglichen, und
daß sowohl der Hüllkörper (12) als auch das Rohr (14) aus einem Material bestehen,
welches sich zersetzt, wenn es dem Wasser ausgesetzt wird.
2. Übungsmine (10) nach Anspruch 1, welche eine Reißleine (28) besitzt, die an dem entfernbaren
Stopfen (30) befestigt ist, um ein Herausziehen des Stopfens (30) beim Aussetzen der
Mine (10) zu ermöglichen.
3. Übungsmine (10) nach den Ansprüchen 1 oder 2, bei welcher der Hüllkörper (12) aus
Sperrholz hergestellt ist.
4. Übungsmine (10) nach den Ansprüchen 1 oder 2, bei welcher der Hüllkörper (12) aus
einem Metall besteht, welches korrodiert, wenn es dem Meerwasser ausgesetzt wird.
5. Übungsmine (10) nach einem der vorhergehenden Ansprüche, bei welcher das Innenrohr
(14) aus umsponnenem Karton hergestellt ist.
6. Übungsmine (10) nach einem der Ansprüche 1 bis 4, bei welcher der Hüllkörper (12)
mit einer Mehrzahl von rohrförmigen Teilen (52-58) versehen ist, von denen jedes rohrförmige
Teil aus weichem Sperrholz hergestellt ist.
1. Mine marine d'exercice (10) comprenant une enveloppe de corps (12) contenant une substance
inerte (16), caractérisée en ce que l'enveloppe de corps (12) comporte un élément
tubulaire interne (14) fermé à l'une de ses extrémités par un bouchon amovible (30)
afin de permettre le passage d'eau lors du déploiement de la mine (10), et en ce que
l'enveloppe (12) du corps et l'élément tubulaire (14) sont constitués d'une matière
qui se décompose lors de son exposition à l'eau.
2. Mine d'exercice (10) selon la revendication 1, ayant un cordon (28) fixé au bouchon
amovible (30) pour faciliter l'enlèvement du bouchon (30) lors du déploiement de la
mine (10).
3. Mine d'exercice (10) selon la revendication 1 ou la revendication 2, dans laquelle
l'enveloppe (12) du corps est en contreplaqué.
4. Mine d'exercice (10) selon la revendication 1 ou la revendication 2, dans laquelle
l'enveloppe (12) du corps est constituée d'un métal qui se corrode par exposition
à l'eau de mer.
5. Mine d'exercice (10) selon l'une quelconque des revendications précédentes, dans la
quelle l'élément tubulaire interne (14) est en carton centrifugé.
6. Mine d'exercice (10) selon l'une quelconque des revendications 1 à 4, dans laquelle
l'enveloppe (12) du corps comporte une multitude d'éléments tubulaires (52-58), chaque
élément tubulaire étant réalisé en contreplaqué tendre.

