Background of the Invention
[Field of the Invention]
[0001] This invention relates to a train diagram production system for producing train
diagrams provided in a train service control system for controlling train service.
[Description of the Prior Art]
[0002] In the prior art, the train diagram control function in a train service control system
is realized by inputting basic diagrams to a computer through a machine function of
input means. Such data input operation is performed by manually inputting an enormous
number of basic train diagrams. Further, the operation of developing the input basic
train diagrams into individual data such as sequence diagrams, train diagrams and
station diagrams for realizing train pursuit function, automatic route control function,
guide broadcast function, etc. is performed by manually inputting data to the computer
through the machine function.
[0003] Fig. 4 is a block diagram showing a prior art train diagram production system. Referring
to the Figure, designated at H is a hand representing manual operation, at 1 a produced
train diagram with drawing concerning train service, at 2 diagram data of each train
(i.e., such data as train No., kind of train, scheduled times of arrival and departure
at each station, arrival/departure line, entrance, departure and increase and decrease
of coaches, at 3 man machines as input means for inputting train diagram data 2 to
the computer (i.e., data processor), at 4 source data (i.e., basic diagram data) produced
by inputting train diagram data 2 through man machines 3, 5 basic diagrams such as
sequence diagrams, train diagrams, station diagrams, etc. obtained through development
of the source data, and at 6 a diagram image of a display diagrams 5 displayed on
graphic display as display means.
[0004] Now, a prior art train diagram production system will now be explained with reference
to the flow chart of Fig. 5. First, the basic diagram 1 is produced manually (STEP
S1), the basic diagram 1 is then developed into train diagram data 2 for each train
(STEP S2), data of diagram data 2 is input for train by train to the computer through
the man machines 3 (STEP S3). Subsequently, diaphragm data 4 is edited according to
instructions from the man machines 3 to produce the source data 4 (STEP S4), and then
the source data 4 is developed to obtain the display diagrams 5 such as sequence diagrams,
train diagrams and station diagrams (STEP S5). The data input in step S3 does not
include data related to other trains (i.e., increase or decrease of coaches and connection),
so that editing operation for developing data into sequence data, train data, station
data, etc. as data related to other trains is done through the man machines 3 in the
step S5. At the instant when data is correctly developed in the step S5, drawing image
6 can be displayed on graphic display 7 or the like (STEP S6).
[0005] As has been shown, the prior art train diagram production system includes the operation
of developing basic diagram data into train diagram data for each train, operation
of inputting train diagram data for each train and operation of editing diagram data
related to other trains from the train diagram data. Thus, the production of train
diagrams requires a great deal of man-hour, and it is difficult to obtain train diagrams
of a desired form of expression. Further, time loss is involved due to erroneous input
of data of the like during operation, and it is difficult to improve the diagram
production efficiency
Summary of the Invention
[0006] An object of the invention is to provide a train
[0007] The invention has been intended to solve the above problems, and its object is to
provide a train diagram production system, which can collectively perform the operation
of inputting train diagram data obtained from basic diagram data and operation of
editing diagram data related to other trains and permits improvement of the diagram
production efficiency.
[0008] According to the invention, there is provided a train diagram production system,
which develops a basic diagram including a drawing concerning train service into individual
train diagram data of the train No., kind of train, arrival and departure times at
each station and arrival/departure lines in each station, edits desired data such
as diagram data related to other trains on the basis of said individual train diagram
data and displays said desired data on display means, said train diagram production
system comprising a reading unit for patterning said basic diagram into a drawing
of a predetermined form and photoelectrically converting the patterned image to produce
image data, a recognition unit for recognizing individual train diagram data from
said image data, and a data processor for storing said individual train diagram data
and editing said individual train diagram data into a desired form to provide the
edited data.
[0009] With this construction, the reading unit converts the basic diagram into image image
data. The recognition unit decodes the image data and recognizes individual train
diagram data. The data processor edits other-train-related diagrams of various forms
from the individual diagram data to let the edited data be displayed on a display.
[0010] The above and other objects, features and advantages of the invention will become
more apparent from the following description when taken in conjunction with the accompanying
drawings.
Brief Description of the Drawings
[0011]
Fig. 1 is a block diagram showing a train service control system adopting an embodiment
of the train diagram production system according to the invention;
Fig. 2 is a perspective view showing a reading/recognition system shown in Fig. 1;
Fig. 3 is an example of patterned basic diagram including drawing;
Fig. 4 is a block diagram showing a prior art train diagram production system; and
Fig. 5 is a flow chart for explaining the operation of the prior art train diagram
production system.
Description of the Preferred Embodiments
[0012] Fig. 1 is a block diagram showing a train service control system adopting an embodiment
of the train diagram production system according to the invention. In the Figure,
reference numeral 11 designates a data processor system for processing data necessary
for train service control and effecting control thereof, and 12 a reading/recognition
system for reading the patterned basic data and recognizing train diagram data. The
data processor system includes input means 8 for designating the form of editing,
a host computer 13 for performing central data processing, magnetic disks 14 and 15
for memorizing data necessary for train service control, a CRT 16 as display means
for displaying train diagrams and the like, an X-Y plotter 17 for graphically displaying
train diagrams and station control units 18 to 21 for transmitting signals for controlling
various systems and units provided in respectively corresponding stations. The reading/recognition
system 12 includes a reading unit 22, for instance an image scanner, for reading out
patterned basic diagram data and a recognition unit 23 for recognizing train diagram
data from read- out image data. The recognition unit 23 includes a magnetic disk
24 for storing judgement data necessary for recognition, a communication control unit
25 for controlling communication with the data processor unit 11 and a CPU 26 for
recognizing diagrams from image data and developing the recognized data to obtain
train diagrams.
[0013] Fig. 2 is a perspective view showing the reading/recognition system 12 shown in
Fig. 1. In the Figure, reference numeral 30 designates a casing of the reading/recognition
system, and 31 an inlet, into which a sheet of a patterned basic diagram 32 is inserted.
[0014] Fig. 3 is a patterned basic diagram as a drawing of a predetermined form. In this
basic diagram, various items are expressed as follows.
(1) The train No. like the prior art, is expressed by a combination of four numerals
1 to 9 and one alphabet letter. Examples of the train No. expression are 1234A and
4321B.
(2) Train arrival and departure times at each station are expressed by points in a
graph, in which the ordinate is taken for stations and the abscissa for time. The
arrival time is expressed as a dot as labeled a, while the departure time is expressed
as a circle as labeled s.
(3) The train service conditions are expressed in conformity to the hitherto used
form of expression. For example, the entrance of train is expressed by a triangle
mark as labeled e, and the departure of train is expressed by a large circle as labeled
d. Further, the increase and decrease of train coaches are expressed as symbols.
(4) The train arrival lines, as in the conventional expression, are expressed by
numerals, for instance, as "3" in station A, "2" in station B and "4" in station C.
(5) The kind of train is expressed by a symbol provided subsequent to the train No.
For example, the limited express is expressed by "Limited Ex", express train by "Ex",
local express as "Lc", sure send as "SS", and normal train as "n".
[0015] Now, the operation of the train service control system shown in Fig. 1 will be described.
As shown in Fig. 2, the patterned basic diagram 32 is inserted into the reading/recognition
system 12 through the inlet 31. In the reading/recognition system 12, the reading
unit 22 reads out the inserted basid diagram 32 and provides image data. From the
image data the CPU 26 of the recognition unit 23 recognizes train diagram data on
the basis of judgement data of the magnetic disk 24. The data processor system 11
accommodates the train diagram data in the magnetic disks 14 and 15. The host computer
13 adits diagram data related to other trains according to the train diagrams and
in a programmed procedure. The other-train-related diagram data is obtained by developing
the train diagram data into sequence data, train data, station data, etc. and serve
as train diagrams on the servicing side.
[0016] If there is any particularly desired form of edition, for instance the display of
express train stations, it is instructed from input means 8, and the host computer
13 provides data by using the magnetic disks 14 and 13 as data base. When an error
is produced during the development of data, an error message or the like is displayed
on the CRT 16 connected to the host computer 13 to let the error be corrected. The
edited other-train-related diagram date may be displayed on the CRT 16 or on the X-Y
plotter so that it can be recognized as drawing image.
[0017] When a message that a train diagram is executed is given from the input unit 8, the
host computer 13 selects a pertinent one or ones of station control units 18 to 21
and transmits a control signal P to the pertinent stations. In this way inter-station
contact can be done concerning the arrival, departure and passage of trains.
[0018] In the above embodiment, an image scanner is utilized for reading out the patterned
basic diagram. However, this is by no means limitative, and it is possible to permit
diagram image to be input in a conversation form by connecting a work station for
drawing control provided with a mouth function.
[0019] As has been described in the foregoing, with the train diagram production system
according to the invention, there are provided a reading unit for patterning the basic
diagram into a drawing of a predetermined form and photoelectrically converting the
patterned image to produce image data, a recognition for recognizing individual train
diagram data from the image data, and a data processor for storing the individual
train diagram data and editing the individual train diagram data into a desired form
to provide the edited data.
[0020] The features disclosed in the foregoing description, in the claims and/or in the
accompanying drawings may, both, separately and in any combination thereof, be material
for realising the invention in diverse forms thereof.
1. A train diagram production system, which develops a basic diagram including a drawing
concerning train service into individual train diagram data of the train No., kind
of train, arrival and departure times at each station and arrival/departure lines
in each station, edits desired data such as diagram data related to other trains on
the basis of said individual train diagram data and displays said desired data on
display means, said train diagram production system comprising:
a reading unit for patterning said basic diagram into a drawing of a predetermined
form and photoelectrically converting the patterned image to produce image data;
a recognition unit for recognizing individual train diagram data from said image data;
and
a data processor for storing said individual train diagram data and editing said individual
train diagram data into a desired form to provide the edited data.
2. The train diagram production system according to claim 1, wherein a desired form
of edition concerning diagrams is instructed to said data processor from input means,
and the edited data is displayed as data including image data on display means.
3. The train diagram production system according to claim 1, wherein when a said individual
train diagram data is executed, said data processor transmits a station control signal
to related stations according to said other-train-related diagram data.